ML20207K173

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1986
ML20207K173
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/31/1986
From: Packard G, Vandenberg D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
NUDOCS 8701090339
Download: ML20207K173 (5)


Text

_

o E OPERATING DATA REPORT DOCKET NO 50-255 DATE 01-05-87 COMPLETED BY GCPackard TELEPHONE (616)764-8913 OPERATING STATUS NOTES 1.

Unit Name: Palisades 2.

Reporting Period:

861201-861231 3.

Licensed Thermal Power (MWt):

2530 4.

Nameplate Rating (Gross MWe):

811.7 5.

Design Electrical Rating (Net MWe):

805 6.

Maximum Dependable Capacity (Gross MWe): **770 7.

Maximum Dependable Capacity (Net MWe):

    • 730 8.

If Changes occur in capacity Ratings (Items Number 3 through 7) since last report, give reasons:

9.

Power Level to Which Restricted, if any (Net MWe):

10.

Reasons for Restrictions, if any:

This Month Yr-to-Date Cumulative 11.

Hours In Reporting Period 744 8760 131,799 12.

Number of Hours Reactor Was Critical 0

1490.5 69,790.3 13.

Reactor Reserve Shutdown Hours 14.

Hours Generator On-Line 0

1324.4 66,283.1 15.

Unit Reserve Shutdown Hours 16.

Gross Thermal Energy Generated (MWH) 0 2,760,600 138,362,640 17.

Gross Electrical Energy Generated (MWH) 0 896,530 43,113,930 18.

Net Electrical Energy Generated (MWH) 0 841,244 40,582,604 19.

Unit Service Factor 0.0 15.1 50.3 20.

Unit Availability Factor 0.0 15.1 50.3 21.

Unit Capacity Factor (Using MDC Net) 0.0 13.2

  • 48.2 22.

Unit Capacity Factor (Using DER Net) 0.0 11.9 38.3 23.

Unit Forced Outage Rate 100.0 81.8 35.0 24.

Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of Each):

25.

If Shut Down at End of Report Period, Estimated Date of Start Up:

February 10, 1987 26.

Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

OC0185-0001B-0P03 Q1i03390612hSS 1

nock 050Upca g

R

- ~-

  • J'--

AVERAGE DAILY UNIT POWER LEVEL.

4 M '

i DOCKET NO 50-255 UNIT-Palisades DATE 01-05-87 COMPLETED BY GCPackard i

TELEPHONE (616)764-8913 v

]

MONTH December, 1986

' DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 1

0 17 0

) -'

2 0'

18 0

3 0

19 0

l j-4 0-20 0

5 0

21 0

6 0

22 0

-7_

0 23 0

1 8

0 24 0

9 0

25 0

I 10 -

0 26 0

4 l

11 0

27 0

i 12 0

28 0

i 13 0

29 0

i-14 0

30 0

15 0

31 0

t 16 0-I i

INSTRUCTIONS:

i On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

t OC0185-0001C-0P03 I

f

m 9

DOCKET NO.

50-255 13IT SHUTDCAHS AND POM.R REDUCTIONS UNIT NAMI, Palisades DAIE 01-05-87 COMPLEIED BY CCPackard REPORT MONTH December, 1986 TF1RPHONE (616)-764-8913 1

2 No.

Date Type Duration Reason Method of Licensee Systeg Compongnt Cause & Corrective (Hours)

Shutting Event Code Code Action to 3

Down Reactor Report

  • Prevent Recurrence 7

860519 F

744 A

3 86-18 1,

2.

3.

4 5.

F: Forced Reason:

Nthod:

Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-t:anual for Preparation of Data B-Nintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)

(Nb1EG-0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

OC0185-0001D-0F03

.+=

SUMMARY

OF OPERATING EXPERIENCE FOR DECEMBER 1986 The Plant remained shut down for repairs and maintenance during the entire month of December.

k 4

4 4

A OC0185-0001E-OP03

Consumers Power resemums AIKalfEAN5 PIRSEftE55 Palisades Nuclear Plant. 27780 slue Star Memorial Highway, Covert. MI 49043 January 5, 1987 US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTilLY OPERATING DATA DPR-20, DOCKET No 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of December 1986, h

~ b~

Dewey VanDenBerg Reactor Engineer CC: KMilaas, Palisades GilGoralski, Palisades JGKeppler, USNRC KWBerry, P24-614B RAFenech, Palisades Resident Inspector, Palisades DLilackett, P11-228B MAlapinski, P21-332 GWBruckmann, Div of Radiological Health Services, Lansing, Michigan ZCCordero, Michigan Dept of Labor RCallen, Michigan Public Service Commission Records Center, INPO, Atlanta, CA RWTaylor, CE, Palisades AAAlatalo, Palisades LLBumb, P21-324 GBSzczotka, P-21-311B Document Control, 950*22*35*10/L GCP87-001 OC0185-0001A-OP03 lit