ML20207J510

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-445/88-58 & 50-446/88-54 on 880803-0908 & Notice of Violation
ML20207J510
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/21/1988
From: Warnick R
NRC OFFICE OF SPECIAL PROJECTS
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20207J514 List:
References
NUDOCS 8809280015
Download: ML20207J510 (6)


See also: IR 05000445/1988058

Text

_____

%

9

SEP 2l lggg

In Reply Refer To:

Dockets:

50-445/88-58

50-446/86-54

TU Electric

ATTN:

Mr. W. G. Counsil

Executive Vice President

400 North Olive Street, Lock Box 81

Dallas, Texas

75201

Gentlemen

This refers to the inspection conducted by Mr. M. Runyan and a NRC

consultant during the period August 3 through September 8, 1988, of

activities authori:cd by NRC Construction Permits CPPR-126 and

CPPR-127 for the Comanche Peak Steam Electric Station, Units 1

and 2, and to the discussion of our findings with you and other

members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection.

Within these areas, the inspection

consisted of selective examination of procedures snd representative

records, intervie,. with personnel, and obscrvations by the

inspectors.

During this 1.-pection, it was found that certain of your

activities were 1.1 violation of NRC requirements, as specified in

the enclosed Notice of Violation.

A written response to this

violation is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter, the enclosures, and your response to this

letter will be placed in the NRC Public Document Aoom.

The response directed by this letter and the accompanying Notice is

not subject to the cicarance procedures of the Office of Management

,

and Pudget as required by the Paperwork Reduction Act of 1980,

t

l

PL 96-511.

RV

IP:CPPD OSP

j IP:CPPD OSP

AD:IP:CPPD:OSP

MRunyan

,ffJHLiMrmore

RWarnick RF<d

9/At/88

9/A /88

9/t1/88

8309230015 SDo921

13/

F'D4

ALOCK 05000445

o

PDC

's

- -

_ _ - - _ _ _ _ _ _ _ _ _

._

,

s

,t

-

,

,

TU Electrid-

2

39 g l Jggg

4

>

}

'

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you.

<

Sincerely,

ORIGINAL SIGNED BY R. F WARNICK

'

R. F. Warnick, Assistant Director

for Inspection Programs

)

Comanche Peak Project Division

Office of Special Projects

,

,

!

'

Enclosurce:

Appendix A - Notice of Violation

i

]

Appendix B - Inspection Report 50-445/88-58; 50-446/88-54

!

!

cc w/ enclosures

l

i

Soc next page

,

!

f

6

A

i

!

,

-

,

f

t

,

l

?

I

f

i

'

1

i

i

.

l.

i

'

r

b

t

,

i

i

l

i

i

i

l

)

i

l

1

.

.

f

.

-

-

-

-

. -

- -

- .

. . - . . .

.

- - - - - _ - - - _ - - _ - _ - - - - - - -

_ _ - _ - _ _ _ _ . - _

,

,

. ,

/

k,

UNITED STATES

I

[

NUCLEAR REGULATORY DMMISSION

2

wAsmworow. o. c. x ,a

(

\\g*****

'

SEP 2l Igg

,

In Reply Refer Tot

!

Dockets:

50-445/88-58

i

50-446/88-54

i

!;

TU Electric

I

ATTN:

Mr. W. G. Counsil

j

Executive Vice President

!

400 North Olive Street, Lock Box 81

J

Dallas, Texas

75201

,

i

Gentlemen

This refers to the inspection conducted by Mr. M. Runyan and a NRC

i

conruitant during the period August 3 through September 8, 1988, of

I

aativities authorized by NRC Construction Permits CPPR-126 and

i

CPPR-127 for the Comanche Peak Steam Electric Station, Units 1

r

and 2, and to the discussion of our findings with you and other

,

members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examinad during the inspection.

Within these areas, the inspection

consisted of selective examination of procedures and representative

,

records, interviews with personnel, and observations by the

i

inspectors.

l

F

!

During this inspection, it was found that certain of your

activities were in violation of NRC requirements, as specified in

the enclosed Notice of Violation.

A written response to this

!

violation is required,

i

'

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter, the enclosures, and your response to this

'

letter will be placed in the NRC Public Document Room.

>

l

The response directed by this letter and the accompanying Notice is

'

not subject to the clearanco procedures of the Office of Management

i

and Budget as required by the Paperwork Reduction Act of 1980,

!

PL 96-511.

(

I

.

'

!

I

<

I

t

i

.

_.

- _ _ _

s

.

TU ElCctric

2

Should you have any questions concerning this irspection, we will

be pleased to discuss them with you.

Sincerely,

[Q V LO w d<k

R. F. Warnick, Assistant Director

for Inspection Programs

'

Comancho Peak Project Division

,

Office of Special Projects

Enclosures:

Appendix A - Notice of Violation

Appendix B - Inspection Report 50-445/88-S8; 50-446/8d-54

cc w/cnclosures:

See next page

,

$

1

f

1

i

- - .

_ . - -

,

s

TU E1Cctric

cc w/enclosuret

koger D. Walker

Nancy H. Williams

Manager, Nuclear Licensing

CYGNA Ennrgy Services

TU Electric

Suite 390

Skyway Tower

2121 N. California Blvd

400 North olive Street, L.D. 81

Walnut crack, CA

94596

Dallas, TX

75201

Robert A. Wooldridge, Esq.

Juanita Ellis

Worsham, Forsythe, sampels

President - CASE

and Wooldridge

1426 South Polk Street

2001 Bryan Tower

Da11cs, TX

75224

Suite 2500

Dallas, TX

75201

Susan M. Theisen

Assistant Attorney General

Mr. Hemer C. Schmidt

Environmental Protection Division

Director of Nuclear

P.O. Box 12548, Capitol Station

Servicca

Austin, TX

78711-1548

TU Elcetric

Gkyway Tower

Jack R. Newman, Esq.

400 N. Olive St., L.B. 81

Newman & Holtzinger, P.C.

Dallas, TX

75201

1615 L Street, NW, Suite 1000

Washington, D.C.

20036

Mr. J. L. Vota

Westinghouse Electric

GDS Associates, Inc.

Corporation

1850 Parkway Place, Suite 720

Post Office Box 355

Marietta, GA

30067-8237

Pittsburgh, PA

15230

Mr. R. W. Ackley

Lanny A. Sinkin

Stone & Webster Engineering

Christic Institute

Corporation Project Mgr.

1324 S. Capitol Street

CPSES

Washington, DC

20002

P. O. Box 1002

Glen Rose, Texas

76043

David R. Pigott, Esq.

Orrick, Hctrington & Sutcliffe

Anthony 2. Roisman, Esq.

600 Montgomery Street

suite 600

San Francisco, CA

94111

1401 New York Avenue, NW

Washington, DC

20005

RJbert Jablon

Bonnie S.

Dlair

Ms. Billie Pirner Garde, Esq.

Spiegel & McDiarmid

Government Accountability Project

1350 New York Avenue, NW

Midwest Office

Washington, DC

20005-4798

104 East Wisconsin Avenue

Appleton, WI

54911

TV Electric

c/o Bethesda Licensing

Regional Administrator, Region IV

3 Metro Center, Suite 610

U.S. Nuclear Regulatory commission

Bethesda, MD

20814

611 Ryan Plaza Drive, Suite 1000

Arlington, Texas

76011

'

,

TU ElOctric

'

o

i

cc w/ enclosures

(continued)

l

'

George A. Parker, Chairman

Public Utility Committee

Senior citizens Alliance of

-

Tarrant County, Inc.

6048 Wonder Drive

Fort Worth, TX

76133

_

!

Joseph F. Fulbright

!

Fulbright & Jaworski

!

1301 McKinney Street

Houston, TX

77010

.

l

!

William A. Burchette, Esq.

!

Counsel for Tex-L4 Electric

Cooperative of Texas

"

'

Heron, Burchette, Ruckert &

Rothwell

.'

Suite 700

1025 Thomas Jefferson St., NW

Washington, DC

20007

i

I

i

1

i

l

l

1

t

i

t

t

I

I

!

!

l

[

l

!

!

!

'

,

i

[

i

!

I

i

.- .

.

-

.

-