DEC 311986
Docket Nos. 50-321, 50-366
l
Georgia ower Company
ATTN:
r. J. H. Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-321/86-40 AND 50-366/86-40
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
P. Holmes-Ray on November 22 - December 19, 1986.
The inspection included a
m
review of activities authorized for your Hatch facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
(
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Your attention is invited to unresolved item identified in the inspection report.
This matter will be pursued during future inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosure are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
,
Ottejtn,M decptet be
foo$k $y@y
'fYlc1 Gv v>J
W
&CV LL &
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
(See page 2)
%\\
1ceI
h-
'
- ,e
F
A
Georgia Power Company
2
Enclosure:
-
NRC Inspection Report
w/ encl:
. P. O'Reilly, Senior Vice President
'
clear Operations
T. Beckham, Vice President, Plant Hatch
. C. Nix, Site Operations General
Manager
djFraser,ActingSiteQASupervisor
A . Gucwa, Manager, Nuclear Safety
and Licensing
c w/ enc 1:
C Resident Inspector
ugh S. Jordan, Executive Secretary
Document Control Desk
State of Georgia
RII
@
RII
y
R0roteau:cdg 7.L& FCantrell
12/f/86
17/p/8612/g/86
.