ML20207J337
| ML20207J337 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 12/31/1986 |
| From: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Sylvia B DETROIT EDISON CO. |
| Shared Package | |
| ML20207J338 | List: |
| References | |
| NUDOCS 8701080401 | |
| Download: ML20207J337 (3) | |
See also: IR 05000341/1986038
Text
_ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
. - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _- _ - -_ - ____ _____ _ _ __ _ - __________
__ _
'
o
DEC 311986
a
Docket No. 50-341
-The Detroit Edison Company
ATTN:
B. Ralph Sylvia
Group Vice President
,
Nuclear Operations
'
6400 North Dixie Highway
Newport, MI 48166
Gentlemen:
This refers to'the routine safety inspection conducted by Z. Falevits of this
office on December 9-12, 1986, of activities at Fermi Nuclear Power Plant
authorized by NRC Operating License No. NPF-43 and to the discussion of our
findings with Mr. J. J. Wald at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
i
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
i
No violations of NRC requirements were identified during the course of this
inspection.
,
'
In accordance with 10 CFR 2.790 of the Consnission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
4
'
Public Document Room.
!-
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
'
,
!
Original signed by N. C. Chrissotimos (for)
J. J. Harrison, Chief
Engineering Branch
,
Enclosure:
Inspection Report
50-341/86038(DRS)
See Attached Distribution
RIII
RIII
.RIII
RIII
W M .(m
Jwg
RK2
J+M (es
Falevits/nma
Muffet;t
Wflght
Harrison
n/31/%
n/Jitso
'not
iclulae
Q
8701090401 861231
DR
ADOCK 0500
1
g d()/
. -
-
.
- - -
'
.
DEC 31 sa6
Docket No. 50-341
The Detroit Edison Company
~
ATTN:
B. Ralph Sylvia
Group Vice President
Nuclear Operations
6400 North Dixie Highway
Newport, MI 48166
Gentlemen:
.
This refers to the routine safety inspection conducted by Z. Falevits of this
office on December 9-12, 1986, of activities at Fermi Nuclear Power Plant
authorized by NRC Operating License No. NPF-43 and to the discussion of our
findings with Mr. J. J. Wald at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Original signed by N. C. Chrissotimos (for)
J. J. Harrison, Chief
Engineering Branch
Enclosure:
Inspection Report
50-341/86038(DRS)
See Attached Distribution
RIII
RIII
.RIII
RIII
SMk
Jw %
17
J# (+s
t
. Gr g t
Falevits/nma
Harrisdse
Muffeda. 'npi
n
ith
rz/J
iz/3 Vsu
-
-
..
.
..
.
.
DEC 311986
Detroit Edison Company'
2
Distribution
cc w/ enclosure:
J. E. Conen, Licensing
Engineer
P. A. Marquardt, Corporate
Legal Department
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service Commission
Harry H. Voight, Esq.
Nuclear Facilities and
Environmental Monitoring
Section
Monroe County Office of
Civil Preparedness
!
)