Responds to 861219 Request for Evaluation of Impact 861209 Feedwater Pump Suction Line Rupture Event at Surry Unit 2 Has on 860822 Application for Amends to Licenses NPF-4 & NPF-7,extending License Period for 40 Yrs.No Impact Noted
ML20207J156
Person / Time
Site: North Anna  
Issue date: 12/23/1986
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Rubenstein L
Office of Nuclear Reactor Regulation
References
86-843A, NUDOCS 8701080319
Download: ML20207J156 (4)


Text

t.,

VruarxrA ELucrunc Axn Powien COMI*ANY

~

HictiMoxn,Vinoix A ununt W.L.sta n ur Vars l'usasesmy Nors. sam oramarions December 23, 1986 Mr. Harold R. Denton, Director Serial No.

86-843A Office of Nuclear Reactor Regulation N0/JDH:vlh Attn:

Mr. Lester S. Rubenstein, Director Docket Nos.

50-338 PWR Project Directorate No. 2 50-339 Division of PWR Licensing-A License Nos.

NPF-4 U. S. Nuclear Regulatory Commission NPF-7 Washington, D. C.

20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 IMPACT OF DECEMBER 9, 1986 SURRY 2 EVENT ON 40 YEAR OPERATING LICENSE AMENDMENT REQUEST On December 19, 1986, you requested that we provide information regarding the December 9, 1986 feedwater pump suction line rupture event at Surry Unit 2 and evaluate its impact on our license amendment request (August 22, 1986, as supplemented) to extend the North Anna license period to forty years.

Our response is provided below.

Question:

What safety significance does the recent pipe failure event at Surry 2 due to corrosion / erosion have on the license extension request?

Response

?

We have evaluated the safety significance of the December 9,

1986 event at Surry Unit 2 and have concluded that the event has no impact on our North Anna i

license amendment request. The basis for our conclusion is stated below.

l l

Current Technical Specifications and Inservice Inspection Programs as required by 10 CFR 50.55a for North Anna require periodic inspection of safety-related systems and components and provide a high degree of assurance that any significant degradation of safety related piping would be promptly identified and corrected. These programs would continue during the extended license period.

In addition, the majority of safety-related piping is stainless steel rather than carbon steel and is not readily susceptible to the erosion / corrosion phenomena.

ge t l

g p> h 8701090319 86122 awcx **

e goa gos

.=

u, Loss of normal feedwater events have been analyzed for North Anna and the recent Surry 2 event was bounded by those analyses.

It is not expected that any piping modifications that might be implemented as a result of this incident would affect those analyses. This would be verified as part of the design 1,

change review which includes assessments of impacts on accident analyses.

These actions would be taken independent of our license amendment request.

Question:

4 Is Virginia Electric and Power Company taking any special actions because of the incident that bears on the proposed license amendment request for North Anna?

Response

Periodic inspection of certain non-safety re' lated systems and components are covered by existing programs at North Anna to assure prompt identification and appropriate corrective actions for significant degradation. As a result of the Surry incident, the scope of these programs will be expanded as information is gained about systems and piping susceptible to the erosion-corrosion phenomena.

This action is being implemented independent of our forty year license amendment request and has no direct bearing on it.

However, these inspection programs, implemented during the current license period, would be continued during the extended license period and the same benefit from the programs would be derived during the additional years of operation.

Very trLily o rs, N

4 W. L.

tewart i

l