ML20207J041

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-424/86-123 & 50-425/86-58 on 861117-21.No Violations or Deviations Noted
ML20207J041
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/31/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20207J046 List:
References
NUDOCS 8701080268
Download: ML20207J041 (3)


See also: IR 05000424/1986123

Text

NQ

u

.

'

'

DEC 3 1

Docket Nos. 50-424, 50-425

License Nos. CPPR-108, CPPR-109

Georgia ower Company

ATTN:

r. J. H. Miller, Jr.

President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC INSPECTION REPORT N05. 50-424/86-123 AND 50-425/86-58

'

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

J. R. Harris on November 17-21, 1986.

The inspection included a review of

activities authorized for your Plant Vogtle facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerninc this letter, please contact us.

Sincerely,

no

'

8701080268 861231

N

h [ Virgil L.

ownlee, Chief

-

PDR

ADOCK 05000424

G

PDR

Reactor Projects Branch 3

Division of Reactor Projects

Enclosure:

NRC Inspection Report

cc w/ encl:

(See page 2)

\\\\

rs [

--

.

,

^M

,

DEC 3 1 1986

Georgia Power Company

2

c/w/ encl:

W . P. O'Reilly, Senior Vice President

./ Nuclear Operations

~H. E. Conway, Senior Vice President &

Project Director

J. O. Foster, Vice President, Project

d. Support

D. Rice, Vice President, Project

d. Engineering

H. Pinson, Vice President, Project

f onstruction

C

W. T. Beckham, Vice President,

Plant Hatch

vit. A. Thomas, Vice President,

d. Licensing

S. Read, General Manager,

Quality Assurance

v . W. Hayes, Vogtle Quality

r

Assurance Manager

v4.C.Ramsey, Manager-

f eadiness Review

R

W . B. Bockhold, General Manager,

d.NuclearOperations

Gucwa, Manager, Nuclear Safety

and Licensing

/M.H.Googe, Project

Construction Manager

/E.D. Groover, Quality

Assurance Site Manager -

Construction

/J.A. Bailey,ProjectLicensing

i

Manager

/G.F.Trowbridge,Esq.,Shaw,

/.Pittman,PottsandTrowbridge

W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

/E.L.Blake,Jr.,Esq.,Shaw,

vd.Pittman,PottsandTrowbridge

E. Joiner, Troutman, Sanders,

d.LockermanandAshtore

G. Ledbetter, Commissioner,

-Department of Human Resources

. H. Badger, Office of Planning

d.andBudget

Kirkland, III, Counsel,

Office of the Consumer's Utility

/ Council

VD. Feig, Georgians Against

Nuclear Energy

(cc w/ enc 1 cont'd - See page 3)

.--

. - .

.

.-

-

.- .

.._ -_ -

.

,

. *

DEC 3 11986'

Georgia Power Company

3

.

(

w/ encl cont'd)

. B. Margulies,.Esq., Chairman,

tinfic Safety and Licensing Board

anel

r. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

/ Panel

J. A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

Panel

b c w/ encl:

. Reis, OGC

. M. Hill, IE

. Miller, NRR

. Brach, EDO

. Sinkule, RII

Christnot, RII

RC Resident Inspector

Document Control Desk

State of Georgia

,

{

Riv , f'

RII'#'/

f

^

,

l

RII

rig

rri :es

Conlon

AHerdt

MSinkule

12 ,/86

12 p /86

If

/

12/.p/86

i

!

.

-

. ,

.

.

.

- - .

-

. - . .

.

_

.