ML20207H962

From kanterella
Jump to navigation Jump to search
Informs of NRC 870218 Workshop on Incident Investigation & Performance Indicators in Atlanta,Ga.On 870219,Region II Will Conduct Workshop on Current Operator Licensing Issues Including Forthcoming Changes to 10CFR55
ML20207H962
Person / Time
Site: Hatch, Vogtle, 05000000
Issue date: 12/24/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
References
NUDOCS 8701080236
Download: ML20207H962 (3)


Text

"'

p O

a December 24, 1986 yeorgia Power Company VATTN: Mr. J. H. Miller, Jr.

President P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

SUBJECT:

INCIDENT INVESTIGATIOff Af!D PERFORMANCE INDICATORS WORKSHOPS On February 18, 1986, the NRC will conduct a one-day workshop on Ircident Investigation and Perforriance Indicators.

The workshop will convene at 9:00 a.n. in the Strohm Auditorium at the Russell Federal Building located at 75 Spring Street, S.W., in Atlanta, Georgia.

In addition, on February 19, 1986, Region II will conduct a workshop on current Operator Licensing issues including forthccming changes to 10 CFR 55.

For your convenience, both activities will be conducted at the same location.

A detailed Agenda will be forwarded at a later date.

I believe these workshops will provide a unique opportunity for you and members of your staff to discuss these issues with Senior Managerrent from both Region II and NRC Peadquarters.

Sincerely, Original Signed by J. Nelson Grace J. Nelson Grace Regional Administrator b.P.O'Reilly,SenierVice cc:

President, Nuclear Operations d T. Beckham, Vice President, Plant Hatch pH. C. Nix, Site Operations General

d. Manager Fraser, Acting Site QA

, Supervisor (f. Gucwa, Manager, Nuclear Safety and Licensing IX E. Conway, Senior Vice President l/6andProjectDirector O. Foster, Vice President and d.GeneralManager D. Rice, Vice President, Project Engineering

~<-c c0 c

cc:

(Continued on page 2)

/g <

7 8701090236 861224 PDR ADOCK 05000321 i

P PDR g 0 LECl

~

Gecrgia Power Company 2

December 24, 1986 cc:

H. Pinson, Vice President, Project Construction R. A. Thomas, Vice President, Licensing M S. Read, General Manager, Quality Assurance

~

g W. Hayes, Vogtle Quality Assurance Manager

'Abr" C. Ramsey, Manager -

Readiness Review grf'B. Bockhold, General Manager, Nuclear Operations

[ConstructionManager H. Googe, Project tEf D. Groover, Quality Assurance Site Paneger -

Construction tA. A. Bailey, Project Licensing Pareger eJr.~ F. Trowbridge, Esq., Shaw, Pittman, Potts and Trowbridge cB. W. Churchill, Esq., Shaw, Pittman, Potts and Trewbridge

d. L. Blake, Jr., Esq., Shaw, Pittman, Potts and Trowbridge t i E. Joiner, Troutman, Sanders, Lockerman and Ashmore

. G. Ledbetter, Commissioner, Department of Human Resources LA". H. Badger, Office of Planning and Budget y D. Kirkland, III, Counsel, Office of the Consumer's Utility Council tE. Feig, Georgians Against Nuclear Energy f)t. B. Margulies, Esq., Chairman, Atomic Safety and Licensing Board Panel ef. O. H. Paris, Administrative Judge Atomic Safety and Licensing Board Panel (4. A. Linenberger, Jr., Administrative Judge Atomic Safety and Licensing Board Panel bec:

(See page 3)

y y. w" Georgia Power Company 3

December 24, 1986 k Reis, OGC bcc.

8. Bordenick, OGC

.t W.M. Hill, IE pg' Miller,NRR J Brach, EDO g Hugh-S. Jordan, Executive Secretary M. Georgia Public Service Comission Sinkule, RII L E Christnot, RII

,/ UNRC Resident Inspectors, Hatch and Vogtle Document Control Desk State of Georgia RI RII RII RII RII WR MS 1

FCant're

' aIdr

/12/)2/86 12/g86 12/

/86 12/a2/86 12A)/86

/7 e