9 DEC 311986 1
Docket No. 50-373 Docket No. 50-374 Commonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:
SUBJECT:
EQUIPMENT QUALIFICATION INSPECTION - LASALLE NUCLEAR STATION -
UNITS 1 AND 2 This letter confirms the dates of February 2-6, 1987, for the NRC Environmental Qualification (EQ) Inspection of electrical and instrumentation equipment, at the LaSalle Nuclear Station. These dates were established during a December 2,1986, telephone conversation between Mr. C. M. Allen of your staff and Mr. A. S. Gautam of my staff. The inspection will be performed by a six member inspection team with Mr. A. S. Gautam of the Region III office as lead inspector.
The following areas will be inspected:
1.
Implementation of corrective action conunitments addressed in the final LaSalle EQ Safety Evaluation Report.
2.
Compliance to EQ regulations of 10 CFR 50.49, including Program Procedures, Master Equipment List, Maintenance, Procurement, Upgrading of Replacement Equipment, Quality Assurance and Employee Training.
3.
Adequacy of equipment qualification files, including responses to relevant NRC Information Notices and Bulletins, i
4.
Installation and me %tenance of selected plant EQ equipment.
I A management entrance neeting is scheduled for 1:00 p.m. on February 2,1987, at the plant site. A plant walkdown inspection of selected EQ equipment is scheduled for February 4,1987, and an NRC exit meeting is scheduled for 11:00 a.m. on February 6, 1987. To facilitate NRC preparation for this inspection, Mr. Allen of your staff has been requested to submit the following LaSalle EQ documents no later than January 19, 1987.
i 8701080222 861231 DR ADOOK 0500 3
ZE28
Commonwealth Edison Company 2
Updated Master Equipment List for items within the scope of 10 CFR 50.49.
Procedures addressing your implementation of the 10 CFR 50.49 program.
EQ responses relevant to the final LaSalle EQ SER.
Latest QA audit report on EQ activities.
Your cooperation with us during this inspection will be appreciated. Should you have any questions regarding this insp(ection, please contact Mr. J. W. Muffett at(312)790-5763 or Mr. A. S. Gautam at 312) 790-5523.
Sincerely, Carl J. Paperiello, Director Division of Reactor Safety cc:
D. L. Farrar, Director of Nuclear Licensing G. J. Diederich, Plant Manager DCS/RSB (RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Phyllis Dunton, Attorney General's Office, Environmental Control Division David Rosenblatt, Governor's Office of Consumer Services RIII RIII RII RIII RIII Astr/jk J o*'
JWM4%
9" Gautam Muffett ig t Harrison Paperiello 12/31/86 12/3/86 12/3t/86 12/3(/86 12/31/86