ML20207H359
| ML20207H359 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 07/21/1986 |
| From: | Oconnor P Office of Nuclear Reactor Regulation |
| To: | Schnell D UNION ELECTRIC CO. |
| Shared Package | |
| ML20207H365 | List: |
| References | |
| GL-83-28, NUDOCS 8607240294 | |
| Download: ML20207H359 (3) | |
Text
.
Docket No.:
50-483 Mr. Donald F. Schnell
+
21 JUL 1986 Vice President - Nuclear
. Union Electric Company P. O. Box 149 St. Louis, Missouri 63166
Dear Mr. Schnell:
SUBJECT:
CALLAWAY - GENERIC LETTER 83-28, ITEM 2.1 (PART I-EQUIPMENT CLASSIFICATION) i The NRC staff has completed its review of Part I of Generic Letter 83-28, Item 2.1 for your Callaway Plant. The staff finds that the equipment classification program at Callaway is acceptable.
This completes the staff's action for Item 2.1 (Part II of Generic Letter 83-28.
Item 2.1 remains incomplete at this time because the )endor Interface portion (Part 2) of this item has not been resolved.
A copy of the related Safety Evaluation is enclosed.
Sincerely, 5\\
3 Paul W. O'Connor, Project Manager PWR Project Directorate #4 Division of PWR Licensing-A
Enclosure:
As stated cc: See Next Page DISTRIBUTION:
1 Docket File BGrimes NRC PDR~
JPartlow Local PDR P0'Connor PD#4 Rdg.
MDuncan BJYoungblood ACRS(10)
OELD EJordan [
PWR#4/DPWR-A P0'Connor:lh 7/ w / %
Sgg72gggg gg8 ga P
I UNITED STATES
~ ' ^.,
NUCLEAR REGULATORY COMMISSION r
ej WASHINGTON. D. C. 20555 21 JUL 1986 60cket No.: 50-483 Mr. Donald F. Schnell Vice President - Nuclear Union Electric Company P. O. Box 149 St. Louis, Missouri 63166
Dear Mr. Schnell:
SUBJECT:
CALLAWAY - GENERIC LETTER 83-28, ITEM 2.1 (PART I-EQUIPMENT CLASSIFICATION)
The NRC staff has completed its review of Part I of Generic Letter 83-28, Item 2.1 for your Callaway Plant. The staff finds that the equipment classification program at Callaway is acceptable.
This completes the staff's action for Item 2.1 (Part I) of Generic Letter 83-28.
Item 2.1 remains incomplete at this time because the Vendor Interface portion (Part 2) of this item has not been resolved.
A copy of the related Safety Evaluation is enclosed.
Sincerely, e
Paul W. O'Connor, Project Manager PWR Project Directorate #4 Division of PWR Licensing-A
Enclosure:
As stated cc: See Next Page
~
1 Mr. D. F. Schnell Callaway Plant
-)
Ifnion Electric Company Unit No. I cc:
Mr. Nicholas A. Petrick Lewis C. Green, Esq.-
Executive Director - SNUPPS Green, Hennings & Henry 5 Choke Cherry Road Attorney for Joint Intervenors Rockville, Maryland 20850 314 N. Broadway, Suite 1830 St. Louis, Missouri 65251 Gerald Charnoff, Esq.
Thomas A. Baxter, Esq.
Ms. Marjorie Reilly Shaw, Pittman, Potts & Trowbridge Energy Chairman of the League of 1800 M Street, N. W.
Women Voters of Univ. City, M0 Washington, D. C.
20036 7065 Pershing Avenue University City, Missouri 63130 Mr. J. E. Birk Assistant to the General Counsel Mr. Donald Bollinger, Member Union Electric Company Missourians for Safe Energy Post Office Box 149 6267 Delmar Boulevard St. Louis, Missouri 63166 University City, Missouri 63130 U. S. Nuclear Regulatory Consnission Mr. Dan I. Bolef, President Resident Inspectors Office Kay Drey, Representative RR#1 Board of Directors Coalition Steedman, Missouri 65077 for the Enviroament St. Louis Region Mr. Donald W. Capone, Manager 6267 Delmar Boulevard Nuclear Engineering University City, Missouri 63130 Union Electric Company Post Office Box 149 St. Louis, Missouri 63166 Chris R. Rogers, P.E.
Manager - Electric Department 301 W. High Post Office Box 360 Jefferson City, Missouri 65102 Regional Administrator U. S. NRC, Region III L
799 Roosevelt Road I
Glen Ellyn, Illinois 60137 Mr. Ronald A. Kucera, Deputy Director Department of Natural Resources P. O. Box 176 l
Jefferson City, Missouri 65102 l
Mr. Glenn L. Koester Vice President - Nuclear Kansas Gas and Electric Company 201 North Market Street Post Office Box 208 Wichita, Kansas 67201
. - - ~ -- L
-