PNO-77-225:on 771221,IE Inspector Found 3,000 Gpm Flow Orifices Installed in Discharge Piping of Containment Rs Pumps,Instead of Specified 2,000 Gpm Flow orifices.3,000 Gpm Flow Orifices Originally Installed in Jan 1977
ML20207G518
Person / Time
Site: North Anna Dominion icon.png
Issue date: 12/22/1977
From: Klingler G, Nolan F, Sniezek J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-77-225, NUDOCS 9903120096
Download: ML20207G518 (1)


Text

- -_. . -- .. . .

f,p P cLMu Cf PRELIMIfMRY hul1 FICA 110H k ;(!,11 # l December 22, 1977 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE -- PN0-77-225 This preliminary notification constitutes EARLY notice of an event

, of POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation

. and is basically all that is known by IE staff as of this date. ,

FACILITY: Virginia Electric and Power Company .

North Anna, Unit No. 1 .

9' Docket No. 50-338 Louisa Countys Virginia -

SUBJECT:

INCORRECT FLOW ORIFICES INSTALLED IN RECIRCULATION SPRAY PIPING ,

On December 21, an IE inspector found 3000 galloryper minute (gpm) flow orifices installed in the discharge piping of containment recirculation spray (RS) pumps, instead of the specified 2000 gpm flow orifices. The 3000 gpm flow orifices were originally installed in January 1977 to reduce the pump flow from 3700 gpm to 3000 gpm (FSAR Conant 6.100).

On August 8,1977, VEPC0 notified Region II that reanalysis of contain-ment pressure following a loss of coolant accident indicated that available net positive suction head (NPSH) for the RS pumps might be 1ess than required. On September 16, VEPCO submitted a report to NRR

,(q

- that contained an analysis of the problem and proposed system modifica- ' '

l N tions to resolve it. The proposed modifications subsequently approved  !

by NRR, included installation of 2000 gpm flow restricting orifices in l the discharge of the .

.RS pumps.

Media interest is anticipated due to current 1nterest in reopening of the ASLB hearing. A news release is not planned by the licensee or NRC.

The Commonwealth of Virginia is being notified. l Region II (Atlanta) received-notification of this occurrence by telephone from an IE inspector at the site at 10:30 a.m. on December 21. This information is current as of 9:00 a.m. on December 22. _

Contact:

GKlingler, IE X28019 FNolan, IE x28019 JSniezek, IE x28019 Distribution: Transmitted H St(1.3 D C Chairman Hendrie Commissioner Bradford /

Comissioner Kennedy S. J. Chilk, SECY C. C. Kammerer, CA

Comissioner Gilinsky (ForDistribution) 'p io

Transmitted: MNBB sL;Y V PBldgiIIYF IE l

L. V. Gossick, ED0 E. G. Chse, NRR E.Volg[enau/1)([7 Region S. H. Hanauer EDO J. J. Fouchard, PA SS. Bldg lN (MAIL)

R. J. McTiernan, OIA C. V. Smit .

SS T R. Hartfield, MIPC R. G. Ryan, OSP R. Minogue, SD

{r

'U H. K. Shapar, ELD