ML20207G465

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/86-34 & 50-457/86-26 on 860626 & 0707-09.No Violation Noted
ML20207G465
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 07/18/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20207G468 List:
References
NUDOCS 8607230077
Download: ML20207G465 (2)


See also: IR 05000456/1986034

Text

. . .

. *

'

JUL 181986

Docket No. 50-456

i

Docket No. 50-457

Consonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

.

Gentlemen:

'

This refers to the routine safety inspection conducted by Mr. K. D. Ward of '

this office on June 26 and July 7-9, 1986, of activities at Braidwood Station,

Units 1 and 2, authorized by NRC Construction Permits No. CPPR-132 and No.

CPPR-133 and to the discussion of our findings with Mr. G. Groth and others at

the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures-and representative records, observations, and

interviews with personnel.

I No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Consnission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

, Sincerely,

!

" Original signed by N.J. Chrissotfros a

J. J. Harrison, Chief

Engineering Branch

Enclosure: Inspection Reports

No.50-456/86034(DRS);

No.50-457/86026(DRS)

' ~'

8607230077

DR 860728

ADOCK 05000456 .

See Attached Distribution PDR  !

j.a

RIII RIII RJII RIII -

&M) ,6w) NW

Gardner

M

Hdrrison

DanieTfon

Ward /lc '

7////86

/N lh

- ._

.

.

Ccmmonwealth Edison Company 2 JUL 181986

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr. , Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Moore, ELD

G. Berry, ELD

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Ca11ihan, ASLB

The Honorable Richard F. Cole, ASLB

)

I

l

l

i

I

. .__ _ _ __-