Advises That Plant Inservice Insp Program Will Be Revised, Per ASME Section XI Code & 1983 Summer Addenda,By Sept 1988
ML20207G347
Person / Time
Site: Byron  Constellation icon.png
Issue date: 07/29/1988
From: Chrzanowski R
COMMONWEALTH EDISON CO.
To: Murley T
NRC
References
4967K, NUDOCS 8808240096
Download: ML20207G347 (2)


Text

.-,.

/,s" m. N Commonwealth Edison 4

/

[,_,,. -

One First National Plaza, Chicago, Illinois v

i Address Reply to: Post Offc's Box 767

(

.... Q Chicago Illinois 60690 0767 July 29, 1988 Mr. T. E. Murley U.S. Nuclear Regulatory Commissjon Washington, DC.

20555 Attnt Document Control' Desk

Subject:

Byron Station Units 1 and 2 Inservice Inspection Program NRC Docket Nos. 50-454 and 50-455

References:

(a) May 6, 1987 letter from K.A. Ainger to U.S. NRC (b) May 16, 1988 letter from K.A. Ainger to U.S. NRC Gentlement The Byron Unit 1 Inservice Inspection (ISI) Program was developed to meet the requirements of the 1980 Edition through 1981 winter addenda of the ASME Section XI Code (Section XI 1980, W81). When the Byron Unit 2 ISI Program was established, Reference (a) requested the same ASME Code, described above, apply to both Byron Units 1 and 2.

Reference (b) proposed the use of the 1983 Edition through 1983 Summer Addenda of the ASME Section XI Code (Section XI 1983, S83) for both Byron Units 1 and 2.

A careful review of the two ASME Codes is delineated in Attachment A.

We have determined ~. hat the differences between the Codes have a minimal ef fect on the Byro: Jnits 1 and 2 ISI Program. Therefore, to reflect these changes, the Byron ISI Program Plan for Units 1 and 2 will be revised in accordance with the 1983 Edition th: ugh 1983 Summer Addenda of the ASME Section XI Code. This re'rision will be completed by the start of the Unit 1 refueling outage scheduled for September, 1988.

Please direct any questions regarding this matter to this office.

Very truly yours, 6hfc'dh i

L 8808240096 880729 R. A. Chrzanowski PDR ADOCK 050004 4 Nuclear Licensing Administrator Q

/klj fo$

cc L. Olshan-NRR i

0 Byron Resident Inspector NRC Region III Office 4967K

\\

d'

/@

l e&

abh o.E,q?. &e c1 Q

<:<.0- )$

b

$*. W U &

J Q

1

w

,5 j

ATTACHMENT A l

l A comparison and review of Section XI 1980, W81 versusSection XI 1983, S83 was conducted and very few differences were found.

The only examination recpe change is to Table IWB-2500-1, Category B-E, Item number B4.20.

Section XI 1980, W81 requires a VT-2 of 25% of the heater penetrations, where Section XI 1983, S83 requires a VT-2 of 100% of the heater penetrations.

The only document changes are for the use and submittal of the NIS-2 i

form as a required document.

Section XI 1980, W81 does not require a NIS-2 form where Section XI 1983, S83 does require a NIS-2 form.

Byron Station currently uces the NIS-2 form and meets the requirements of Section XI 1983, S83 in this area.

i i

The ultrasonic examination, IWA-2232, as defined in Section XI 1980, W81 is more detailed in Section XI 1983, S83.

The remainder of the changes from Section XI 1980, W81 to Section XI 1983, S83 are editorial, grammatical, or they are to clarify or define specific axaminations. These changes either do not apply to Byron Station or they have an administrative impact only.

4967K l