Forwards Safeguards Insp Repts 50-456/88-02 & 50-457/88-02 on 871120-880722.No Violations Noted
ML20207G339
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 08/17/1988
From: Mallett B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20207G343 List:
References
NUDOCS 8808240094
Download: ML20207G339 (2)


See also: IR 05000456/1988002

Text

r V -

,

,

TCD

i

AUG 171988 H

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Senior Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the reactive safeguards inspection conducted by

Massrs. T. J. Madeda and G. L. Pirtle of this office on November 20, 1987

through July 22, 1988, of activities at the Braidwood Nuclear Power Station 1

authorized by NRC Operating Licenses No. NPF-72 and No. NPF-77 and to the

discussion of our findings with Mr. P. Laird at the conclusion of the

inspectian.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the coarse of this

inspection.

6

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Bruce S. Mallett, Ph.D., Chief

Nuclear Material Safety and l

Safeguards Branch t

Enclosure: Inspection Reports /

No. 50-456/88002(DRSS); )

/ j j

No. 50-457/88002(DRSS) R

See Attached Distribution v# g

RIII RIII RIII RIII II

/jlr tie g ed Weil Ma ett

$ge2289 anMr d1 l

0

l

.. -

7

-

.

'

1

.

l

L

i

1

Commonwealth Edison. Company 2 g 7g

I

Distribution ,

,

cc w/ enclosure:

T. J. Maiman, Vice President,

PWR Operations. j

H. Bliss, Nuclear. .)

Licensing Manager i

S. Hunsader, Nuclear -l

Licensing Administrator 1

M. Lohmann, Project Construction 1

and Startup Superintendent

R. E. Querio, Station Manager ,

P. L. Barnes, Regulatory  !

Assurance Supervisor  !

DCD/DCB (RIDS) l

Licensing Fee Management Branch l

Resident Inspector, RIII I

Braidwood

Resident Inspector, RIII Byron l

D. W. Cassel, Jr. , Esq.  ;

Richard Hubbard j

J. W. McCaffrey, Chief, Public l

Utilities Division

H. S. Taylor, Quality Assurance j

Division

E. Chan, 0GC '

G. Berry, OGC

Stephen P. Sands, NRR j

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB l

The Honorable Ivan W. Smith, ASLB -l

The Honorable Gary J. Edles, ASLAP l

The Hanorable Dr. W. Reed Johnson, ASLAP '!

The Honorable Christine N. Kohl, ASLAP I

l

1

l

.l

l

1