Monthly Operating Rept for Sept 1986
ML20207G104
Person / Time
Site: Millstone 
Issue date: 09/30/1986
From: Newburgh G, Romberg W
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
MP-9599, NUDOCS 8701060327
Download: ML20207G104 (5)


Text

_

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-245 UNIT Millstone 1 DATE 861003 COMPLETED BY G.Newburgh TELEPHONE (203) 447-1791 Ext. 4400 MONTH SEPTEMBER 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 644 17 646 2

643 18 647 3

639 19 647 4

645 20 647 5

646 21 648 6

646 22 650 7

646 23 647 8

646 24 645 I

9 647 25 646 10 530 26 599 11 645 27 643 12 644 28 648 13 645 29 646 1

14 646 30 636 7

15 646 31 N/A 1,

/

16 556 INSTRUCTIONS I -

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

l 8701060327 860930 ADOCK0500g5 DR

OPERATING DATA REPORT DOCKET NO. 50-245 DATE 861003 COMPLETED BY G.Newburgh TELEPHONE (203) 447-1791 Ext. 4400 OPERATING STATUS 1.

Unit Name: Millstone 1 Notes 2.

Reporting Period: September 1986 3.

Licensed Thermal Power (MWt): 2011 4.

Nameplate Rating (Gross MWe): 662 5.

Design Electrical Rating (Net MWe): 660 6.

Maximum Dependable Capacity (Gross MWe): 684 7.

Maximum Dependable Capacity (Net MWe): 654 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe): N/A 10.

Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 720 6551 138839 12.

Number Of Hours Reactor Was Critical 72D 6367.4 107446.2 13.

Reactor Reserve Shutdown Hours 0

148.9 2983.4 14.

Hours Generator On-Line 720 6350 104515.2 15.

Unit Reserve Shutdown Hours 0

183.7 277.4

16. Gross Thermal Energy Generated (MWH) 1426321 12516222 193130420 17.

Gross Elec. Energy Generated (MWH) 479700 4252900 64954196 18.

Net Electrical Energy Generated (MWH) 458571 4066252 61956024 19.

Unit Service Factor 100 96.9 75.3 20.

Unit Availability Factor 100 99.7 75.5 21.

Unit Capacity Factor (Using MDC Net) 97.4 94.9 68.2 22.

Unit Capacity Factor (Using DER Net) 96.5 94.0 67.6 23.

Unit Forced Outage Rate 0

0.6 11.7 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION l

l

DOCKET NO. 50-245 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Millstone 1 DATE 861003 COMPLETED BY G.Newburgh REPORT MONTH SEPTEMBER 1986 TELEPHONE (203) 447-1791 Ext. 4400 l

2 No.

Date Type Duration Reason Method of Licensee Systeg Compogent Cause & Corrective (Hours)

Shutting Event Code Code Action to 3

Down Reactor Report #

Prevent Recurrence N/A Or 1

2 3

4 F:

Forced Reason-Method:

Exhibit G - Instructions S:

Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161)

E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction-5 G-Operational Error (Explain)

(Duration = 0)

Exhibit 1 - Same Source H-Other (Explain) 6-Other (Explain)

REFUELING INFORMATION REQUEST 1.

Name of facility:

Millstone 1 f

2.

Scheduled date for next refueling shutdown:

May 1987 3.

Schedule date for restart following refueling: August 1987 l

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes, lechnical Specification Changes Regarding:

(1) Maximum Average Planar Linear Heat Generating Rate (2) Maximum Critical Power Ratio 5.

Scheduled date(s) for submitting licensing action and supporting information:

Spring 1987 6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

200 GE8B Fuel Assemblies 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) In Core: (a) 580 (b) 1536 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been req'ac'ed or is planned, in number of fuel assemblies:

2184 Assemblies 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

1987, Spent Fuel Pool Full Core Off Load Capability is Reached.

1991, Core Full, Spent Fuel Pool Contains 2146 Bundles.

d NE5T UTILITIES cenerei Omce.. seio.n street. Bornn. connecticui 1

5Y I"$5 E*"~"

P.O. BOX 270

      • **"" ",$ U,""" ~,

HARTFORD. CONNECTICUT 06141-0270 C,Z[

(203) 665-5000 k

k J

October 14, 1986 MP-9599 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Reference:

Provisional License DPR-21 Docket No. 50-245

Dear Sir:

In accordance with Millstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating data report for Millstone Unit 1 is enclosed.

One additional copy of the report is enclosed.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY W. D. Romber Station Superin dent Millstone Nuclear Power Station WDR/CSN:rg

Enclosures:

(

)