  • 9 HOPE CREEK GENERATING STATION MONTHLY OPERATING

SUMMARY

MAY 1986 During May, the station continued to perform Technical Specification Surveillances in preparation for initial criticality. In addition, the "D" Diesel overhaul was completed and flange gaskets were replaced in twelve control rod drives. Power Ascension has closed test condition "open vessel" and is currently preparing for initial criticality.

eg7220670860531 I)

R ADOCK 05000354 \

PDR . \

r_

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-354 UNIT Hope Creek Gen. Station DATE 6/10/86 COMPLETED BY Karen M. Head TELEPHONE (609) 339-5239 MONTH May 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 2g o 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 Ig 0 26 0 11 0 27 0 12 0 28 0 _

13 0 29 0 14 0 3g 0 ,

15 0 31 0 16 0

OPERATING DATA REPORT UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-354 UNIT NAME Hope Creek Gen. Station DATE 6/10/86 COMPLETED BY Karen M. Head REPORT MONTH May 1986 TELEPHONE (609) 339-5239 METHOD OF SHUTTING DOWN THE TYPE REACTOR OR F FORCED DURATION REASON REDUCING CORRECTIVE ACTION /

NO. DATE S SCHEDULED (HOURS) (1) POWER (2) COMMENTS 5/3 S 691 4 H On May 3, 1986 at 530 Hope Creek entered Operational Condition 4 (Cold Shutdown) from Refueling and con-tinued in shutdown into June.

SUMMARY

liope Creek Generating Station has never been critical.

I

OPERATING DATA REPORT DOCKET NO. 50-354 UNIT Hope Creek Gen. Station DATE 6/10/86 COMPLETED BY Karen M. Head TELEPHONE (609) 339-5239 OPERATING STATUS 1 REPORTING PERIOD May- GROSS HOURS IN REPORTING PERIOD 744

2. CURRENTLY AUTHORIZED POWER LEVEL (MWt) 164.65 MAX. DEPEND. CAPACITY (MWe-Net)_ 1067 DESIGN ELECTRICAL RATING (MWe-Net) 1067
3. POWER LEVEL TO WHICH RESTRICTED (I 'NY) (MWe-Net) 53.35 I
4. REASONS FOR RESTRICTION (IF ANY) 5% ulcense THIS YR TO MONTH DATE CUMULATIVE
5. NO. OF HOURS REACTOR WAS CRITICAL 0 0_ _ 0
6. REACTOR RESERVE SHUTDOWN HOURS 0 0_ 0
7. HOURS GENERATOR ON LINE O 0_ 0
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0 l 9. GROSS THERMAL ENERGY GENERATED (MWH) 0 0 0
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 0
11. NET ELECTRICAL ENERGY GENERATED (MWH) 0 0 0
12. REACTOR SERVICE FACTOR N/A__
13. REACTOR AVAILABILITY FACTOR N/A
14. UNIT SERVICE FACTOR N/A_ __ _
15. UNIT AVAILABILITY FACTOR N/A
16. UNIT CAPACITY FACTOR (Using Design MDC) N/A _
17. UNIT CAPACITY FACTOR (Using Design MWe) N/A
18. UNIT FORCED OUTAGE DATE N/A _ _ _ _
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION) :Four (Sco Attached)
29. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:6/15/86
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 6/15/86 INITIAL ELECTRICITY 7/13/86 COMMERCIAL OPERATION _11/L1/86

~

, SCHEDULED SHUTDOWNS (ITEM 19)

TYPE DATE DURATION

1. Lop Test - Scram 7/27/86 2 days

. 2. Shutdown Outside Control Room 8/16/86 4.5 days

3. MSIV Isolation - Scram 10/30/86 2 days
4. Load Rejection - Scram 11/4/86 4.5 days

E l 0 PSEG~

Pt,t'hc Service Electnc and Gas Company PO Box L Hancocks Bndge. New Jersey 08038 llope Creek Operations June 16, 1986 Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19496

Dear Sir,

MONTHLY OPEPATING REPORT HOPE CREEK GENERATING STATION DOCKET NO.58-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, a reproduction of the operating statistics for May are being forwarded to you. ,

Sincerely yours,

.L R. S. Salvesen General Manager Dope Creek Operations Distribution Enclosures

/