ML20207F981

From kanterella
Jump to navigation Jump to search
Amend 132 to License NPF-43,revising TS 3.7.1.2, Emergency Equipment Cooling Water Sys, Action a & TS 3.8.1.1, AC Sources - Operating, Action C,To Be Consistent with TS 3.7.1.2
ML20207F981
Person / Time
Site: Fermi 
Issue date: 03/03/1999
From: Kugler A
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20207F987 List:
References
NUDOCS 9903110383
Download: ML20207F981 (6)


Text

..

- ~..

,$Mh p

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGToR, D.C. 30e064001

\\ **,***

i

. DETROIT EDISON COMPANY DOCKET NO. 50-341 J

FERMI 2 l

AMENDMENT TO FACILITY CPERATING LICENSE Amendment No. 132 License No. NPF-43 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by the Detroit Edison Company (the licensee) 4 dated April 9,1998 (NRC-98-0071), complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

i i

9903110383 990303 PDR ADOCK 05000341 P

PDR l

s 2-1 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-43 is hereby amended to read as follows:

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.132

, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. DECO shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance with full implementation within 30 days.

j i

FOR THE NUCLEAR REGULATORY COMMISSION Q

Andrew J. Kugler, Pr ject Manager Project Directorate 111-1 Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of issuance: March 3,1999 l

l l

i 4

l-l

=. -

. - _.. _. ~. _ -. - -..

s e

ATTACHMENT TO LICENSE AMENDMENT NO.132 FACILITY OPERATING LICENSE NO. NPF-43 i

DOCKET NO. 50-341 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain verticallines i

indicating the area of change.

REMOVE INSERT 3/4 7-3 3/4 7-3 3/4 8-1 3/4 8-1*

i 3/4 8-2 3/4 8-2 l

l

  • Overleaf page provided to maintain document completeness. No changes contained on this page.

W PLANT SYSTEMS EMERGENCY EQUIPMENT COOLING WATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 Two -independent emergency equipment cooling water (EECW) system-subsystems shall be OPERABLE with each subsystem comprised of:

a.

One OPERABLE EECW pump, and b.

. An OPERABLE. flow path capable of removing heat from the associated safety-related equipment.

I APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, 3, 4, and 5.

ACTION:

i i

a.

In OPERATIONAL CONDITION 1, 2 or 3, with one EECW system subsystem inoperable:

1.

Within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:

a)

Verify that all required systems, subsystems, trains, l

components and devices that depend upon the remaining OPERABLE'EECW system subsystem are also OPERABLE, and i

b)

Verify that the ADS

l Otherwise**, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

2.

Declare.the associated safety-related equipment inoperable and take the ACTIONS required by the applicable Specifications.

3.

Restore the! inoperable EECW system subsystem to OPERABLE l

status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b.

In OPERATIONAL CONDITION 4 or 5, determine the OPERABILITY of the safety-related equipment associated with an inoperable EECW system subsystem and take any ACTIONS required by the applicable Specifications.

l

  • ADS is not required to be OPERABLE when reactor steam dome pressure is less than or equal to 150 PSIG.

- **Except for an inoperable Drywell Cooling Unit, required by Specification 3.7.11 or.an inoperable primary containment oxygen monitoring instrumentation channel, required by Specification 3.3.7.5, that depends on the remaining i'

OPERABLE EECW system subsystem.

In these cases, take the ACTION required by Specification 3.7.11 for the.inoperability of both. required Drywell Cooling

~

Units or Specification 3.3.7.5 for the inoperability of both required primary containment oxygen monitoring instrumentation channels.

' FERMI - UNIT 2.

3/4 7-3 Amendment No. D, #,132 L

. 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES A.C. SOURCES - OPERATING LIMITING CONDITION FOR OPERATION l

-3.8.1.1 As a minimum, the following A.C. electrical power sources shall be l

OPERABLE:

i a.

Two physically independent circuits between the offsite transmission network and the onsite Class IE distribution system, 1

and l-j b.

Two separate and independent.onsite A.C. electrical power sources, Division I and Division II, each consisting of two emergency i

diesel generators, each diesel generator with:

(

i 1.

A separate day fuel tank containing a minimum of 210 gallons of fuel, i

2.

A separate fuel storage system containing a minimum of j

35,280 gallons of fuel, and

[

3.

A separate fuel transfer pump.

APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and'3.

AG.Ilati:

(

o.

With one or both offsite circuits of the above required A.C.

j electrical power sources inoperable, be in at least HOT SHUTDOWN 2

{

within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirement 4.8.1.1.1. within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter and, 8

b.

With one or both diesel generators in one of the above required I

onsite A.C. electrical power divisions inoperable;.

1.

Demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirement 4.8.1.1.1 within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, and if the diesel. generator (s)becameinoperableduetoanycauseother than an inoperable support system, an independently testable component, or preplanned preventive maintenance or testing, by performing Surveillance Requirement 4.8.1.1.2.a.4 for one diesel generator at a time within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, unless the absence of any potential common mode failure for the remaining diesel generators is determined, and FERMI UNIT 2 3/4 8-1 Amendment No. 77,119 JUN 0i M8 a

.... ~

ELECTRICAL POWER SYSTEMS LIMITING CONDITION FOR OPERATION (Continued) i ACTION (Continued) 2.

Verify within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, that CTG 11-1 is OPERABLE.

Restore the

e inoperable division to OPERABLE status within 7 days or be l

in at least HOT SHUTDOW within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

3.

If the requirements of ACTION b.2. above for CTG 11-1 cannot be met, either restore the inoperable division to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (not to exceed 7 days from the time the division became inoperable); or, satisfy the requirements of ACTION ).2 above within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and restore the inoperable division to OPERABLE status within 7 days

-from the time the division became inoperable: or, be in at.

least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

c With one or both diesel generators in one of the above required onsite A.C. electrical power divisions inoperable, in addition to ACTION b. above, verify within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> that all required systems, subsystems, trains, components and devices

  • that depend on the l

remaining onsite A.C. electrical power division as a source of.

. emergency power are also OPERABLE: otherwise. be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

d.

With both of the above required onsite A.C. electrical power divisions inoperable:

1.

Demonstrate the OPERABILITY of the remaining A.C. sources by 3erforming Surveillance Requirement 4.8.1.1.1 within one 1our and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter: and 2.

Restore at least one of the above required inoperable divisions to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at i

least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s: and 3

3.

Restore the second of the above required divisions to OPERABLE status within the time required by Action b above from the time of initial loss or be in at least HOT SHUTDOWN j

within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

P l

L instrumentation channel. required by Specification 3.a.7.5. that de) ends on the. remaining OPERABLE onsite A.C.. electrical power division.

In t1is case.

take the ACTION required by Specification 3.3.7.5 for the inoperability of both required primary containment oxygen monitoring instrumentation channels.

FERMI - UNIT 2 3/4 8-2 Amendment No. 119. 132 e