Monthly Operating Rept for Sept 1986.W/861015
ML20207F746
Person / Time
Site: Limerick Constellation icon.png
Issue date: 09/30/1986
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8701060216
Download: ML20207F746 (6)


Text

'

3 OPERATING DATA REPORT DOCKET No. 50 - 352 DATE OCTOBER 15, 1986 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY N.M.ALDEN ENGINEER-IN-CHARGE j

LICENSING SECTION NUCLEAR GENERATION DIVISION TELEPHONE I2153 841-5022 OPERATING STATUS

1. LMIT NAMES LIMERICK WIT 1 i NOTES: WIT 1 EXPERIENCED NO l

l l

2. REPORTING PERIODI SEPTEPSER, 1986 l

REPORTABLE OUTAGES.

l l

l

3. LICENSED THERMAL PONER(PMT):

3293 l

l g

g

4. NAMEPLATE RATING (GROSS 994E )*

1138 l

l l

l

5. DESIGN ELECTRICAL RATING (NET 99tEli 1055 l

l l

l

6. MAXIPut DEPENDABLE CAPACITY IGROSS 99EII 1092 l

l l

l

7. MAXIPUI DEPENDABLE CAPACITY INET 99Els 1055 l

l

=

8. IF CHANGES OCCUR IN CAPACITY RATINGS IITEMS PMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. PONER LEVEL TO NHICH RESTRICTED, IF ANY (NET 99tEls
10. REASONS FOR RESTRICTIONS, IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 720 5,807 5,807
12. PueER OF HOURS REACTOR NAS CRITICAL 720.0 4,508.0 4,508.0
13. REACTOR RESERVE StiUTDatte HOURS 0.0 0.0 0.0

=---

14. HOURS GENERATOR OH-LINE 720.0 4,427.0 4,427.0

==

15. LMIT RESERVE SHUTD0D94 HOURS 0.0 0.0 0.0

--- =

16. GROSS THERMAL ENERGY GENERATED (t98H) 2,366,712 14,448,164 14,448,164
17. GROSS ELECTRICAL ENERGY GENERATED (P991) 778,010 4,754,93*

4,754,930

13. NET ELECTRICAL ENERGY GENERATED tt94H) 749,409 4,563,812 4,563,812

==.

/'f f " l (

PAGE 1 0F 2 f8701060216 860930

)

/ PDR ADOCK 05000352

/

R PDR v

a i

.g.

OPERATING DATA REPORT (CONTIftJED)

DOCKET NO. 50 - 352 1

DATE OCTOBER 15, 1986 i

THIS HONTH YR-TO-DATE CUMULATIVE i

19. UNIT SERVICE FACTOR 100.0 76.2 76.2 f

J

20. UNIT AVAILABILITY FACTOR 100.0 76.2 76.2 l
21. UNIT CAPACITY FACTOR (USING MDC NET) 98.7 74.5 74.5
22. UNIT CAPACITY FACTOR (USING DER NET) 98.7 74,5 74.5
23. UNIT FORCED OUTAGE RATE 0.0 5.1 5.1 2 's. SHUTD0pe4S SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)2
25. IF SHLTIDoped AT END OF REPORT PERIOO ESTIMATED DATE OF STARTUPt
26. LNITS IN TEST STATUS (PRIOR TO COP 91ERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 INITIAL ELECTRICITY HID APRIL 85 4/13/85 COMMERCIAL OPERATION IST QTR 86 2/01/86 4

PAGE 2 0F 2

f a

s.

g AYERAGE DAILY WIT POER LEVEL DOCKET No. 50 - 352 UNIT LINERICK UNIT 1 DATE OCTOBER 15, 1986 COMPANY PHILADELPHIA ELECTRIC COMPANY N.H.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION MJCLEAR GENERATION DIVISION TELEPHOK 1215) 841-5022 HONTH SEPTEPBER 1986 DAY AVERAGE DAILY POMER LEVEL DAY AVERAGE DAILY POMER LEVEL

( P9tE-NET I (t94E-NET I 1

1044 17 1054 2

1041 18 1048 3

1046 19 1039 4

1031 20 1038 5

1037 21 1038 6

1040 22 1046 7

1051 23 1036 8

1043 24 1038 9

1045 25 1034 10 1053 26 1034 11 1029 27 1039 12 1025 28 1041 13 1058 29 1037 14 1041 30 1030 15 1044 16 1046 4

- ~ -

y--

---.,m-..wew.n~,-,,,..

,y-,-

y.,-.-e--.--.

.,,,w.-.,

-e-.-

e,-w.,--g.w-.w-w.,,e.,

47..

-.~,,---.-,m-,.,--

s

.s

'IDEIT SHUTO(MtS AMI POER REDUCTIONS DOCKET No. 50 - 352 t#1IT NAME LIMERICK UNIT 1 DATE OCTOBER 15, 1986 REPORT MONTH SEPTEleER,1966 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY N.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION NUCLEAR GENERATION DIVISION TELEPHONE t2153 841-5022 l

1 l

1 l METH00 0F l LICENSEE lSYSTEMICOMPONENil CAUSE AND CORRECTIVE l

lTYPEIDURATIONlREASONISHUTTING DOMel EVENT l CODE I CODE l ACTION TO NO.1 DATE I (111 (HOURSil 123 1 REACTOR (3) l REPORT S l 14) l (5) l PREVENT RECURRENCE l-1 1 ----- 1 I

i 1

1 1

1 I

I I

I I

I I

I t

Ill (2)

(3)

(4)

F - FORCED REASON ETH00 EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MAMJAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT ILER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAINI FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE 15)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHERIEXPLAINI EXHIBIT I - SAME SOURCE i

l I

1 l

l l

l l

l I

l

{

i

Dockct No. 50-352 Attachment to Monthly Operating Report for September, 1986 Limerick Generating Station Unit 1 September 1 through September 30, 1986 I.

Narrative Summary of Operating Experiences Unit 1 operated at approximately 100% power throughout the report period.

II.

Challenges to the Main Steam Relief Valve System There were no challenges to the main steam safety-relief valves during the month of September.

P l

O O

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 1215)841 4000 October 15, 1986 Docket No. 50-352 Director Office of Resource Management US Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

Limerick Generating Station Monthly Operating Report Gentlemen:

Enclosed is the monthly operating report for Limerick Unit 1 for the month of September, 1986, forwarded pursuant to Technical Specification 6.9.1.6.

Very truly yours, f

W. M. Alden Engineer-In-Charge Licensing Section Nuclear Generation Division Attachment cc:

Director, Office of Inspection & Enforcement, USNRC (12 copies)

Dr. T. E. Murley, NRC E. M. Nelly, Senior Resident Site Inspector Mr. David E. Ney, PA Dept. of Envir. Resources Mr. P. A. Ross, NRC (2 copies)

INPO Records Center See Attached Service List 4

h 4

.- --