Amend 101 to License NPF-58,revising TS 3.4.4, Safety/Relief Valves (Srvs), by Increasing Present 1% Tolerance on Safety Mode Lift Setpoint for Safety Relief Valves to 3%
ML20207F427
Person / Time
Site: Perry 
Issue date: 03/03/1999
From: Pickett D
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20207F432 List:
References
NUDOCS 9903110240
Download: ML20207F427 (4)


Text

.....

e j*

ase k

UNITED STATES,

'f.

]

NUCLEAR REGULATORY COMMISSION wasmworon, o.c. asse oem t:

FIRSTENERGY NUCLEAR OPERATING COMPANY DOCKET NO. 50-440 l

PERRY NUCLEAR POWER PLANT [ UNIT 1 l

AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.101 License No. NPF-58.

i 1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by the FirstEnergy Nuclear Operating Company (the licensee, formerly The Cleveland Electric illuminating Company, Centerior Service Company, Duquesne Light Company, Ohio Edison Company, OES Nuclear, Inc.,

Pennsylvania Power Company, and Toledo Edison Company) dated July 13,1998, as supplemented by submittal dated November 23,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the l

Commission's rules and regulations set forth in 10 CFR Chapter I,-

B.. The facility will operate in conformity with the application, the provis'ons of the Act, and the rules and regulations of the Commission; L

C.

There is reasonable assurance (i) that the activities authorized by this amendment can i

be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in enmpliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and l

l E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the

- Commission's regulations and all applicable requirements have been satisfund.

i l-2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-58 is hereby amended to read as follows:

I; l

9903110240 990303 PDR ADOCK 05000440 P

PDR

~_

2-l.

(2) TechnicalSoecifications i

The Technical Specifications contained in Appendix A and the Environmental Protection l

Plan contained in Appendix B, as revised through Amendment No.101 are hereby l

incorporated into this license. The FirstEnergy Nuclear Operating Company shall l

operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and shall be implemented not later than 90 days after issuance.

FOR THE NUCLEAR REGULATORY COMMISSION r

Q v 9M Douglas V. Pickett, Senior Project Manager l

Project Directorate 111-2 l

Division of Licensing Project Management l

Office of Nuclear Reactor Regulation l

Attachment:

Changes to the Technical i

Specifications l

Date of issuance: March 3, 1999 l

l l

1 i

4 4

l l

I' ATTACHMENT TO LICENSE AMENDMENT NO.101 FACILITY OPERATING LICENSE NO. NPF-58 DOCKET NO. 50-440 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages. The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.

Remove

_!Digrt i

3.4-10 3.4-10 l

l l

I 4

4

)

.._...- -....-.-.~

~..

S/RVs 3.4.4 I'

3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.4-Safety / Relief Valves (S/RVs)

LC0 3.4.4 The safety function of seven S/RVs shall be OPERABLE.

M The relief function of six. additional S/RVs shall be OPERABLE.

l l

APPLICABILITY:

MODES 1. 2, and 3.

i

. ACTIONS l

CONDITION-REQUIRED. ACTION COMPLETION TIME I

A.

One or more required A.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> S/RVs inoperable.

M A,2 Be in MODE 4.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> l

l l

l-SURVFilI ANCF RFOUIREMENTS ~

SURVEILLANCE FREQUENCY SR 3.4.4.1 Verify the safety function lift setpoints In accordance of the required S/RVs are as follows:

with the Inservice Number of Setpoint Testing Program 5/RVs (osia) 1 L

8 1165

  • 34.9 6

1180 i 35.4 5.

1190

  • 35.7 4

PG RY - LNIT 1 3.4-10

/,oGait No.101 c,.

-., +. -

. ~,,,,.