DUKE POWER GOMPANY P.O. Box 33180 CHARLOTTE, N.C. 28242 TELarnown HAL B. TUCKER (704) 37:>4531 vwaressnessy wtuaan rmone creen July 15, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Cossaission Washington, D. C.
20555 Attention:
Mr. B. J. Youngblood, Project Director PWR Project Directorate No. 4 Ret Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 Technical Specification Amendment for Unit 1/ Cycle 2 Reload l
Dear Mr. Denton:
Please find attached Technical Specification changes (Attachment 1) for Catawba Units 1 and 2 Facility Operating License Nos. NPF-35 and NPF-52, respectively. The proposed changes are needed to ensure that plant operation is consistent with the design and safety evaluation conclusions made in the Reload Safety Evaluation (Attachment 4) for Catawba Unit 1, Cycle 2.
Please note that the majority of the changes affect Unit 1 only. The safety evaluation performed to support allowing a positive moderator temperature co-efficient (MTC) (Attachment 5) is also applicable to Unit 2.
This change is l
therefore requested to be made for both Units 1 and 2.
i Attechnent 2 contains a discussion of the Justification and Safety Analysis, l contains an analysis pursuant to 10 CFR 50.91 which concludes that the proposed amendments do not involve significant hazards considerations. provides the draft marked-up Catawba FSAR pages that reflect the proposed technical specification change to allow a positive MTC. These pages are submitted for information as a result of a recent NRC Staff request during the review of a similar technical specification change for McGuire. The Catawba FSAR markups and new figures and tables reflecting the increased positive MTC change will be used to revise the Catawba FSAR in the appropriate annual FSAR update following approval of this change, g
These amendments are required to be in place prior to startup following the Unit 1 3]
first refueling. The current Unit i shutdown date is August 29, 1986 and the Unit 1/ Cycle 2 initial criticality date is currently scheduled for November 2,1986.
8607220502 860715 DR ADOCK0500g3
Mr. Harold R. Denton, Director July 15, 1986 Page Two This request is a supplement to the June 6, 1986 reload submittal fer Catawba Unit 1; therefore no additional fees have been remitted with this submittal.
Pursuant to 10 CFR 50.91 (b) (1) the appropriate South Carolina Station Official is being provided a copy of this amendment request.
Very truly yours, Lb Hal B. Tucker RWO: sib Attachment xc Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Heyward Shealy, Chief Bureau of Radiological Health South Carolina Department of Health &
Environmental Control 2600 Bull Street Columbia, South Carolina 29201 INPO Records Center Suite 1500 1100 circle 75 Parkway Atlanta, Georgia 30339 American Nuclear Insurers e/o Dottie Sherman, ANI Library The Exchange, Suite 245 l
270 Farmington Avenue l
Farmington, CT 06032 i
M&M Nuclear Consultants l
1221 Avenue of the Americas New York, New York 10020 NRC Resident Inspector Catawba Nuclear Station l
Mr. Harold R. Denton, Director July 15, 1986 Page Three HAL B. TUCKER, being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this revision to the Catawba Nuclear Station Technical Specifications, Appendix A to License Nos. NPF-35 and NPF-52; and that all statements and matters set forth therein are true and correct to the best of his knowledge.
C"MM ed-Bal B. Tucker Vice President Subscribed and sworn to before me this 15th day of July, 1986.
lt0 th
&,' he n )
-Notary Public" '
/
gousose,,,
v,h....*..N Y
p My Commission Expires p
Od-uin hf?n r /, k$
b' I n l
N e n.
Q
- 5. k. # UBt.ic,fyf
.........-[.+;f
>,G,..COV5++
.n9 l