ML20207E708

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1988 for Callaway Plant Unit 1
ML20207E708
Person / Time
Site: Callaway Ameren icon.png
Issue date: 07/31/1988
From: Blosser J, Moose J
UNION ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
ULNRC-1817, NUDOCS 8808180130
Download: ML20207E708 (7)


Text

.

..,=

.,.e a

i i

l D002T NO.

50-483 u

]

UNIT NAME CALLAWAY UNIT 1 j

I

]-

DATE 8 05-88 i

COMPLE"*3 BY J. M. Hoose L

TELEPHONE 314/676 8243 5

~

PART A OPERATIONS SUM 4ARY i

11 e

The plant operated at approximately 100% power with the fol'owing exceptions.

1) At 1127 on 7/8/88, the 'B' circulating pump tripped due tv high stator temperature, resulting in a turbitie runback to 75%

J i

2) On 7/21/88, power was reduced to Ph to allow repair of a seal water return line on the

'B' condetisate pump. Return to full power operation was initiated on 7/22/88 t

PART B PORY AND SATETY VALVE SU!t4ARY m

f 1

I Nonn I

a 1

i k

1 b

4 J

seosteo130 8e0731 i

PDR ADOCM 050004e3 1

R PNU Page 1 of 4

)

Part C AVERACE DAILY UNIT PokTR LEVEL DOCKET NO.

f0 483 UNIT NAME CALLAWAY UNIT 1 DATE 8 05 88 COMPLETED BY J. H. Hoose TELEP110NE 314/676 8243 HONTH:

July 1988 AVERACE DAILY PokTR '3 VEL AVERACE DAILY F0kTR LEVEL DAY (MWe Net)

DAY (FNe-Net) 1 1173 17 1128 2

1165 18 1146 3

1159 19 1148 4

1151 20 1155 5

1145 21 1148 6

1144 22 1108 i

7 1149 23 1161 8

1075 24 1157 9

1114 25 1152 10 1152 26 1156 11 1151 27 1156 12 1149 28 1153 13 1137 29 1152 14 1087 30 1147 15 1099 31 1120 16 1126

)

l Page 2 of 4 j

~

r Part D OPERATING DATA REPORT I

DOCKET NO.

50 483 UNIT NAh!

CALLAWAY UNIT 1 j

l DATE 8 05 88 CCHPLETED BY J. M. Hoose-l TELEPHONE 314/676-8243 OPERATING STATUS (YID CUM )

1 1.

REPORTINC PERIOD: JULY 1988 CROSS HOURS IN REPORTINC PERIOD:

144 5111 31693.5 2.

CURRENTLY AUIHORIZED POWER LEVF.L -(MWt):

3565 MAE. DEPEND. CAPACITY (MWe-Net): 1120*

DESIGN ELECTRICAL RATING (MWe-Net):

1171 3.

POWER LEVEL TO WICH RESTRICTED (IF ANY) (MWe Net):

4 REASONS FOR RESTRICTION (IF ANY):

DlIS MONDI

-YR TO DATE CUMJLATIVE 5.

NUMBER OF HOUR 3 REACTOR WAS CRITICAL...............

744 4704.3 26682.1 6 REACTOR RESERVE SHUTDOWN HOURS..................... -

0 0

0 7.

HOURS CENERATOR ON LINE............................

744 4651.0 26105.5 8.

UNIT RESERVE SHUTDOWN !!OURS........................

0 0

0 1

)

9.

CROSC THERMAL ENERGY GENERATED (MW)...............

2,624,356 15,934,058 84,205,838 10 CROSS ELECTRICAL ENERGY CENERATED (MWH)............

889,139 5.410,093 28,451,813

11. NET ELECIRICAL ENERCY CENERATED (MWH)..............

848,646 5,347,584 26,956,627

12. REACTOR SERVICE FACTOR.............................

100 92.0 84.2 l

(

13. REACTOR AVAIIABILITY FACTOR........................

100 92.0 84.2 1

i j

14 UNIT SERVICE FACTOR................................

100 91.0 82.4

15. UNIT AVAILABILITY FACIOR...........................

100 91.0 82.4

16. UNIT CAPACITY FACTOR (Using MDC)...................

101.8*

89.9*

75.9*

17. CNIT CAPACITY FACTOR (Using Design M 4)............

97.4 86.0 72.6 i

18. UNIT FORCED OUTACE RATE............................

9 4.92 4.23 19 SHUIDOWNS SCHEDULED OVER NEXT 6 MONTHS (TTPE, DATE, AND DURATION OF EACH):

[

I

20. IF SHUT DOWN AT END OF REFORTING PERIOD, ESTIt'ATED DATE OF STARTUP:
  • Ihe unit cape-ity factor (using MDC) reflects use of the MDC value prior to uprating to 3565 MWt.

A uprated MDC value will not be deterrined until late in 1988.

Pa8e 3 of 4 i

-. ---.u

.u

~

m

=__m__

_ _... _... _.. _ =.. - _

..m, l

l; Part E l

UNIT SHUID0ia S AND POWER REDL G ONS

(

DOCKET NO.

50-433 l

UNIT NAM PAf f AEAT UIIIT 1

(

DATE 8-05-88 l

COWLETED BY J. M. Moose TELEPHONE 314/676-8243 REPORT MONTH: JULY 1988 l

t PETIIOD OF

...PE SHUTTINC DotAt i

i F: TRCED Dt"tATION THE REACIOR OR No.

DATE S SUIEDUIID (HOURS)

REASOft REDUCIIIC POEER CORRECTIVE ACTIONS /C0f9ENTS 14 7-08-88 F

0 A

4 Turbine runback due to 'P circulating water pump trip on high stator '

temperature.

L 15 7-21-88 S

0 A

4 Derate to repair seal return line on the 'B' condensate pump.

I f

i l

i i

i

[

r SPDIARY:

l REASON ETHOD l.

As EQUIPIENT FAILURE (EIPLAIN) la MANUAL j

5: MAINT. OR TEST 2: MA.WAL SCRAM l

C: REFLT IIIC 3: ACI0MATIC SCRAM i

i Da RECUI.ATURY RESTRICTIOlt As OTHER (EXPLAIN)

E OPERA 2DR TRAININC AIS LICEllSE EIAff1NATI0t2 F: ADItINISTRATIVE C: OPERATIOMAL ERROR (EIP1AIN)

N: OTHER (EIPLAIN) 4 Page 4 of 4 l

f l..

_ - - - _ -_. _ _ - _ -.. ~.. _. _. - _. - _.. -.... _ _.. _,. - _.. - _. ~.,. ___,.

~..

l l

UNION ELECTRIC COMPANY cenant August 5. 1988 Nuclear Regulatory Conunission Document Control Desk Washington DC 20555 ULNRC-1817

Dear Sir:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT JULY 1988 The enclosed Monthly Operating Report for July 1988 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

. D. Bloseer fanager. Callaway Plant Encl.osure cct Distribution attached l

Moitrg Adden PO. Bon 620.Fu% MO 66051 l

~

4 cc distribution for ULNRC-1817 with enclosures Mr. Robert DeFayette. Chief Project Section le U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn. IL 60137 Mr. Thomas Alexion (2 copies)

Office of Nuc16.r Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop P-316 7920 Norfolk Avenue Bethesda MD 20014 NRC Resident Inspector Manager. Electric Department Missouri Public Service Commission P. O. Box 360 Jefferson City. MO 65102 1

l i

1 I

i 1

-j bec distribution for ULNRC-1817.

l with enclosures l

Records' Center Institute of Nuclear Power Operations i

Suite 1500 1100 circle 75 Parkway Atlanta. CA 30339 American Nuclear Insurers Library I

c/o Dottie Sherman.

The Exchange Suite 245 270 Farmington Avenue l

Farmington, CT 06032 j

Mark Parvin l

l Callaway Project Manager l

Westinghouse Electric Corp.

P. O. Box 355 Pittsburgh, PA 15230 D. F. Schnell (400)

F. W. Brunson (470) i T. P. Sharkey A. P. Neuhalfen W. R. Campbell

)

A. C. Passwater/D. E. Shafer/D. J. Walker (470)

G. A. Hughes G. J. Czeschin J. R. Peevy W. R. Robinson R. R. Roselius l

J. R. Polchow

_ I i

M. E. Taylor l

D. E. Young Z170.04 (QA Record)

S. L..\\usten (NSRB) (470)

T. A. Moser J. M. Hoose (2)

R. L. Kelly (460)

R. J. Irwin/J. M. Brown (490)

JDB Chrono 3456-0021.6 G56.37 N. Date

' I Tm

--J