Responds to on Constituent Concerns Re Safety Problems at Facility.Special Insp Conducted on 861103-14 to Investigate Safety Concerns.Insp Team in Process of Evaluating Findings & Preparing Final Rept
ML20207E260
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 12/24/1986
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Cohen W
SENATE
Shared Package
ML20207E264 List:
References
NUDOCS 8701020124
Download: ML20207E260 (4)


Text

co-qe.

.$3 MC24 M The Honorable William S. Cohen United States Senate Washington, D.C.

20510

Dear Senator Cohen:

I am pleased to respond to your letter of November 25, 1986, addressed to the NRC Office of Congressional Affairs regarding concerns of several of your constituents relating to the Seabrook Statinn.

In July of this year, the NRC Region I Office learned of the establishment of the Employee's Legal Project of Amesbury, Massachusetts, which was designed to help current and former nuclear power plant employees to report safety problems at their work place.

The Region I Office has been in frequent communication with the project's director, Ms. Sharon Tracy, since early August,1986.

NRC Region I received T several pieces of correspondence from the Employee's Legal Project in September and October,1986, which provided a number of safety concerns pertaining to the Seabrook Station.

These safety concerns, as they became available, were given to the NRC Resident Inspectors as well as Public Service of New Hampshire for preliminary investigation.

In the final analysis, some 61 potential safety concerns were formulated from the various documents received from the Employee's Legal Project.

In order to thoroughly investigate these concerns collectively, a special team inspection was conducted by seven NRC Region I inspectors at Seabrook during the period November 3-14, 1986.

In addition to their inspection activities at the site, these inspectors also interviewed tnose former workers who had given'their concerns to the Employee's Legal Project and who were willing to talk to the NRC.

The NRC Region I inspection team is in the process of evaluating its tindings and preparing a final report which should be available in the near future.

Preliminary indications are that the concerns raised by the Employee's Legal Project do not raise any specific new issues which could adversely impact on nuclear safety at Seabrook Station. At the conclusion of our inspection, we again told Ms. Tracy to contact NRC Region I immediately if she received additional concerns or more specific information regarding existing concerns.

NRC Region I is prepared to act promptly on any additional information provided by the Employee's Legal Project or others.

"~

  • 1 Tha Honorable William S. Cohen

$/

If I or my staff can be of any further assistance, please do not hesitate to contact me.

Sincerely, Criginal signed bg' yictor StellQf Victor Stello, Jr.

Executive Director for Operations Distribution:

H. Der ton -

J. Taylor T. Murley W. Kane E. Wenzinger T. Elsasser ED0 002362 SECY 861259 PDR LPDR Docket No. 50-443 Region I Docket Room 1

- 0CA VStello JRoe TRehm i.

RI RI RI RI RI E

[

OCA Elsasser Wenzinger Kane Allan Murley teilo-,

/

j l

12/11/86 i

i 4

i e +

,~---._--._,,,r.,

.,_.,_y,_

,,...___.,y

r-

\\';

pe at:q

/

UNITED STATES j' " ), (

NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

>f 14CTl0N EDO PRINCIPAL CORRESPONDENCE CONTROL FROM:

DUE: 12/16/86 EDO CONTROL: 002362 DOC DT: 11/25/86 SEN. WILLIAM S.

COHEN FINAL REPLY:

TO:

KAMMERER FOR SIGNATURE OF:

GREEN SEC/ NO: 861259 EXECUTIVE DIRECTOR DESC:

ROUTING:

CONSTITUENTS CONCERNS RE SEABROOK DENTON TAYLOR DATE: 12/02/86 ASSIONED TO: RI CONTACT: MURLEY SPECIAL INSTRUCTIONS OR REMARKS:

i

b.

OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET PAPER NUMBER:

CRC-86-1259 LOGGING DATE: Dec 1 86 ACTION OFFICE:

EDO AUTHOR:

W.S.

Cohen AFFILIATION:

U.S. SENATE LETTER DATE:

Nov 25 86 FILE CODE: ID&R-5 Seabrook

SUBJECT:

Expresses concerns re the safety of the constr of the Seabrook neu plant in Seabrook ACTION:

Direct Reply DISTRIBUTION:

OCA to Ack, RF SPECIAL HANDLING: None NOTES:

/f. /s Eh DATE DUE:

~

SIGNATURE:

DATE SIGNED:

AFFILIATION:

Rec'd Off. ED0 Date _ l 2 ^

I) 3 '

Time EDO --- 0 0 2 36 2

'