Forwards Request for Addl Info Re Util 831105 & 860826 Responses to Generic Ltr 83-28,Items 3.1.1,3.1.2,3.2.1,3.2.2 & 4.5.1.Info Needed by 870116 to Complete Review
ML20207E222
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/31/1986
From: Mark Miller
Office of Nuclear Reactor Regulation
To: James O'Reilly
GEORGIA POWER CO.
References
GL-83-28, NUDOCS 8701020114
Download: ML20207E222 (3)


Text

_.

Docket Nos.: 50-424 and 50-425 31 DEC 1986 Mr. James P. O'Reilly Senior Vice President - fluclear Operations Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302

Dear br. O'Reilly:

Subject:

Request for Additional Information Regarding Generic Letter 83-28, Items 3.1.1, 3.1.2, 3.2.1, 3.2.2, and 4.5.1 for Vogtle, Units 1 and 2 We _have ccrroleted our review of your responses to Generic Letter (GL) 83-28 dated November 8,1983, and August 26, 1986.

Your responses were evaluated for compliance to the staff's positions delineated in Generic Letter 83-28 for Items 3.1.1, 3.1.2, 3.2.1, 3.2.2, and 4.5.1.

Your responses to these items were found to be incomplete requiring additional information to determine acceptability. Descriptions of the deficiencies are discussed in greater detail in the enclosed request for additional information.

In order to maintain our present review schedule, we request that you respond to the enclosed request for additional information by January 16, 1987, t

If there are any questions, please contact me at (301) 492-7357.

Sincerely, s/

Melanie A. Miller, Project Manager PWR Project Directorate #4 Division of PWR Licensing-A

Enclosure:

As stated cc: See next page ETMBUT40N:

C Jocket Filfp JPartlow AToalston T C PDR BGritres DLasher Local PDR EJordan V,Lendis

(

PRC System NThompson MSinkule PWR#4 Rdg NMerriweather l'Duncan TConlon Philler AHerdt BJYoungbleed JVnight 0GC-Bethesda

( I AGibson ACRS (10)

VBrownlee M@d

-A PPRfjj/.PWR-A PW W A

til ler/mac MDuntaN BJ) -

Woo 12/

/86 12/3D/86 12/

6 8701020114 861231 PDR ADOCK 05000424 A

PDR-

,~

..-. u :

=-- - -

ENCLOSURE RE0 VEST FOR ADDITIONAL INFORMATION

iOGTLE ELECTRIC GENERATING PLANT GENERIC LETTER 83-28 ITEMS 3.1.1, 3.1.2, 3.2.I, 3.2.2 and 4.5.1 Item 3.1.1 - Incomplete Georgia Power Company (GPC) needs to submit an unambiguous statement confiming that post-maintenance testing of reactor trip system components is required and that the test procedures were reviewed to ensure that the testing demonstrates that the equipment is capable of performing its intended safety function.

If not, a schedule should be submitted for when the review will be completed.

Item 3.1.2 - Incomplete GPC indicated that when procedures are reviewed at Vogtle, part of the review criteria is to review the procedure against the applicable vendor manuals.

However, it is not quite clear from GPC's response whether this review entailed 1

j a check of vendor and engineering reconsnendations to ensure that appropriate i

test guidance is included in the test and maintenance procedures or the Tech-l~

nical Specifications.

If GPC's program for reviewing procedures does adequately verify that appropriate vendor and engineering test guidance have been incorporated into these procedures, then GPC should provide a statement confiming that the requirements of Item 3.1.2 have been completed.

If not, GPC should submit a schedule for when this review will be completed.

Item 3.2.1 - Incomplete f

. GPC needs to submit a unambiguous statement confiming that post-maintenance

]il testing is required for all other safety-related components and that a review of test and maintenance procedures and Technical Specifications was perfomed j

to assure that the testing demonstrates that the equipment is capable of per-feming its safety function.

If not, GPC should submit a schedule for when this review will be completed.

g Item 3.2.2 - Incomplete GPC needs to provide a statement confiming that its program for reviewing procedures did adequately verify that appropriate vendor and engineering test i

guidance were included in'the test and maintenance procedures or the Technical Specifications.

If not, GPC should submit a schedule for when this review will be completed.

Item 4.5.1 - Incomplete GPC needs to provide an unambiguous statement confiming that on-line func-tional testing of the reactor trip system, including the reactor trip breakers (RTB) will be performed and that such testing will independently veri.fy the operability of the RTB undervoltage and shunt trip features.

,---.---,,....-.--m-.,


..-..-,..,3-,

-w 7.,

c.-

-s--

re,-----

-.-...m-m

.w-y

.-,-i-,mw

. y

Mr. J. P. O'Reilly Georgia Power Company Vogtle Electric Generating Plant cc:

Mr. L. T. Gucwa Resident Inspector Chief Nuclear Engineer Nuclear Regulatory Commission Georgia Power Company P. O. Box 572 P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302 Mr. Ruble A. Thomas Deppish Kirkland, III, Counsel Vice President - Licensing Office of the Consumers' Utility Vogtle Project Council Georgia Power Company /

Suite 225 Southern Company Services, Inc.

32 Peachtree Street, N.W.

P.0c Box 2625 Atlanta, Georgia 30303 Birmingham, Alabama 35202 James E. Joiner

~

Mr. Donald O. Foster Troutman, Sanders, Lockerman, Vice President & Project General Manager

& Ashmore Georgia Power Company Candler Building Post Office Box 299A, Route 2 127 Peachtree Street, N.E.

Waynesboro, Georgia 30830 Atlanta, Georgia 30303 Danny Feig Mr. J. A. Bailey 1130 Alta Avenue Project Licensing Manager Atlanta, Georgia 30307 Southern Company Services, Inc.

P.O. Box 2625 Carol Stangler Birmingham, Alabama 35202 Georgians Against Nuclear Energy

[

425 Euclid Terrace j

- Ernest Ls Blake, Jr.

Atlanta, Georgia 30307 r

Bruce W. Churchill, Esq.

.{

Shaw, Pittman, Potts and Trowbridge

{

2300 N Street, N.W.

Washington, D. C.

20037

.r Mr. G. Bockhold, Jr.

Vogtle Plant Manager Georgia Power Company Route 2. Box 299-A Waynesboro, Georgia 30830 Regional Administrator, Region II U.S. Nuclear Regulatory Coreission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Mr. R. E. Conway Senior Vice President and Project Director Georgia Power Company q-Rt. 2, P. O. Box 299A Waynesboro, Georgia 30830