Summary of 990218 Meeting with Us Enrichment Corp in Bethesda,Md Re Status of Activities at Gaseous Diffusion Plants.List of Attendees & Presentation Matl,Encl
ML20207D970
Person / Time
Site: Portsmouth Gaseous Diffusion Plant, 07007001
Issue date: 03/02/1999
From: Yawar Faraz
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Pierson R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 9903100109
Download: ML20207D970 (33)


Text

'

og .

C p q ool f

pq It UNITED STATEL y -]00$

jJW j NUCLEAR REGULATORY COMMISSION "f WASHINGTON, D C 20mAm

%, ' ,p5

.,,,, March 2, 1999 MEMORANDUM TO: Robert C. Pierson, Chief Special Projects Branch Division cf Fuel Cycle Safety and Safeguards

~

FROM: Yawar H. Faraz, Portsmouth Project Manager / g Enrichment Section Special Projects Branch Division of Fuel Cycle Safety and Safeguards

SUBJECT:

MEETING

SUMMARY

FOR FEBRUARY 18,1999, STATUS MEETING WITH UN'TED STATES ENRICHMENT l CORPORATION (USEC)

On February 18,1999, staff from the Office of Nuclear Material Safety and Safeguards and Region ill met with USEC staff in an open meeting to discuss the status of activities at the gaseous diffusion plants (GDPs). A list of attendees (Attachment 1) and the meetirg agenda (Attachment 2) are attached.

USEC introduced its new management. Mr. James Miller, Executive Vice President of Operations, and Mr. James Adkins, Vice President of Production. USEC also indicated that its  ;

6-month transition plan for transitioning GDP operations from Lockheed Martin Utility Services to USEC is on schedule and is expected to be completed by May 18,1999. USEC also indicated that it was in the process of implementing the second phase of its personnel cutbacks j at both GDPs by announcing a 250 voluntary reduction in force. l USEC discussed the status of re-opening of Compliance Plan issues. USEC indicated that it expects to submit its request to reopen Portsmouth Compliance Plan Issues 8,9 and 23 to the Department of Energy by February 25,1999. NRC staff pointed out that in an earlier meeting with USEC, it had asked USEC to consider the reopening of the Padur h and Po'tsmouth Compliance Plan Issue 2 in light of USEC's pending proposal to wa ldraw the Technical Safety Requirements proposed as part of the Safety Analysis Report Update amendmeni submittal.

USEC provided the status of Paducah's seismic modifications in light of NRC's request for additionalinformation (RAl) on USEC's amendment request. USEC indicated that its response to the RAI was submitted by letter dated February 17,1999.

USEC provided a status of the corrective actions it was undertaking as part of the Portsmouth )

December 9,1998, fire event (Attachment 3). USEC indicated that the plant was in the process 1 l

of taking several corrective actions, the cascade operations were back to normal, and all NRC 1 certification requirements were being met.

NRC discussed the status of Part 76 rulemaking involving the certificate amendment review process. NRC indicated that the public comment period has ended and it is in the process of resolving received comments. The rule is anticipated to be finalized by June 22,1999, as ,

originally scheduled.

%y 9903100109 990302 PDR ADOCK 07007001 WWJ J U]

t

t: _ .

s l :' ,. n .

har s. a

/

I i l

l .

! R. Pierson 2 l

l NRC staff provided USEC the results of its performance review for the last fiscal year, u Attachment 4 outlined the presentation.

- Attachments: As stated cc: Steve Toelle, USEC t

! Dockets 70-7001 and 70-7002

~!

i 1

l l

l <

i i

i l

i l

l-l l

DISTRIBUTION:

Dockets 70-7001,70-7002 ' NRC File Center PUBLIC NMSSrM KO'Brien, Rlli MHom l WTroskoski, FCOB PHiland, Rlli FCSSTM SPB rM KWinsberg. OGC DHartland, Rill YChen CCox I

OFC ~ i SPB - h [SPB h SPD SPD P NAME- rar DHoadley hen MG loway on DATE / [ 19 9 /l /99 3 / / /99 8/2 199 / 19 9 C e COVER E = COVER & ENCLOSURE N = NO COPY l

- AWTSMSRMGMNT.wpd OFFICIAL RECORD COPY j l

1 I

I i

. /VfC,- (LSEC Sbritor hagF Dafg - Nfyaa.ry /5' /999 hls sg. 0 % w q s y J_ fyaA panMA ,

f4WT f W. L5od Ric Q 2;oi-ilY 7R Me i:. Re dh ' L15E C 301-sc,4-Jafl P.17T. A uw- .

o sc3, (790)ss;-33,0

\ l

,t  : -

D- hY f& '

h" ~~

D

&ndleh5 /n &ce<. Vuc ut- sH- 3scry l h)4ut b91^j# 9pc Mr &ckl for-MT-2/ u 'T l

% - JL %,, k5mc 5m- S c-sh s- '

van d ft<At usNfc./ m ann 3ot<p p en3 3 fs% Gwl USAfclN:xca M - 415 '7t1!

Pst kl)nn NAC 7thChia. Qlc 00- 12.4- Ho3 l G<l(Qe<;Ie nac ouc s , w s>

i 3l,rn Dye.c MC, RR- REE U0-9a9-TT00 l Keu 0 'B <ie <v Nil i

SRI ro.t - vsx-7 u 3 l Pnn. Atlo-// a'cc i 5Ar 79 a n-sy/ y

{\r he. Ga%s - Alte- -

301- +s- q u c k e.Pkco-e cisDRc . caob q.is-ws

<1&t AMus usec w su so v kowuo 9va+y ims/vsce. 5.a- w- s so i L% a k ,a ,vo-av,-w I 4a YM:lfv i_-/wv ose q 3 0 t -sc y 3301

\

STevt losu E usEc._ 30) - 54y - Azso Attachment 1

I NRC/USEC SENIOR MANAGEMENT MEETING February 18,1999,9:00 am USEC Headquarters, Bethesda, MD Conference Room 10A e USEC Reorganization USEC l

l l

e Status of Re-Opening Compliance Plan Issues USEC  !

  • Status of PGDP C-331/C-335 Seismic Modifications USEC l

e Corrective Actions Following PORTS X-326 Fire USEC l e Part 76 Rulemaking Status NRC l

e Report to Congress on GDPs/ Plant Performance Review NRC

[(USEC A Global Energy Company Attachment 2

~

Planned Corrective Actions -

i

. Emergency Planning .

. Pre-Fire Planning and Emergency Packets

. Incident Command and Control i i

. Firefighter Training  ;

i

. Operator Training

. Initiating Event E

E w ]  !

i f

l

Emergency Planning ,

. Implernentation of the Revised Emergency Response Procedure Which Addresses Classification of Fires and Other Natural Phenomena Events as an Alert Will Occur ,

in the Near-Term

. Key Emergency Response Organization Personnel,  ;

Including t:3e Plant Shift Superintendent / Incident Commander and Crisis Manager, Will Be Trained on the i Revised Emergency Response Procedure

. Capabilities of, and Staffing Needs for, the Alternate EOC Location Are Being Re-evaluated i

2  !

I

Pre-Fire Planning and Emergency Packets .

. U~sability .of Facility Emergency Packet Content Will Be Assessed .

b

. Building Recall Plans Are Under Evaluation to Determine Whether ACRs Are Appropriate Assembly Points  ;

[

i y

i 3

f I

T-

~

Incident Command and Control . .

h

. Response Safety Officer Training Enhancements Will Be Made

. Self-Assessment of the Incident Command System Is in i Progress and Enhancements Will Be Made  ;

. Drills for Evaluation and Training of Command and  !

Control Are in Progress  ;

l l

l i

i

Firefighter Training .~

. Detailed Firefighting NCS Job-Specific Criteria Are Being Upgraded and Will Bc Provided to Firefighters Upon Completion h

b 5

Operator Training a

. Cascade Operating Procedures Are Undergoing Revision and Alarm Response Procedures Are Being Developed, With Appropriate Training to Follow

. Guidance and Training Are Being Developed for Operations Personnel Which Identifies Causes of Motor i

Amp Changes i

i

Initiating Event ,-l t

. A Metallurgical Analysis of The Expansion Joints and Compressor Vanes Will Be Completed t

. A Program Will Be Developed for Determining the Cause of Compressor Failures -

Administrative Controls Require Insaection of Failed Compressors Prior to  !

Restarting Compressor or During Compressor Replacement

. Procedures Will Be Improved to Address Vibration Issues  ;

3

. Temperature Monitoring Will Be Improved i

to Plans to Enhance Side Purge i Capacity .

. Currently Bypassing Side Purge

. Certification Requirements Are Being Met

. Current Method Causes Productivity Losses  !

. Review of Alternatives Ongoing I

. A Number of Altematives Have Been Identified

. Selected Alternative Is a Business Decision 8

y . _. y -

d r Side Purge Alternatives '

. Continue Current Operation j

. Operate With Four Side Purge Cells - Excludes Damaged Cell

. Full Restoration to Pre-Fire Conditions

. Modify Standby Cell to Substitute for Damaged Cell i

9 i

j 4 ;;y .

lf l i-GASEOUS DIFFUSION PLANT PERFORMANCE REVIEW 1 FEBRUARY 18,1999 REVIEW PERIOD i

OCTOBER 1,1997, TO SEPTEMBER 30,1998+

PURPOSE PROVIDE NRC SENIOR MANAGEMENT A " PANORAMIC" OR " BIG PICTURE" ASSESSMENT OF PERFORMANCE AND PROVIDE FEE iBACK TO USEC REGARDING HOW NRC PERCEIVES PE ORMANCE.

l l

t I

e R

Attachment 4 l

l

FUNCTIONAL AREAS

1. SAFETY OPERATIONS I MANAGEMENT ORGANIZATION AND CONTROL, SAFETY-RELATED OPERATIONS, NUCLEAR CRITICALITY AND CHEMICAL SAFETY (NO UF6) IMPLEMENTATION .

I

2. MAINTENANCE AND SURVEILLANCE i

SAFETY-RELATED AND CHEMICAL SAFETY PROGRAM i MAINTENANCE, AND TECHNICAL SAFETY REQUIREMENT-RELATED SURVEILLANCES 1

l

3. ENGINEERING l l

GENERAL, NUCLEAR CRITICALITY, AND CHEMICAL SAFETY-RELATED ENGINEERING, AND PLANT SAI MTY ANALYSIS REPORT l CHANGE (10 CFR 76.68) EVALUATIONS i

4. SAFEGUARDS MATERIAL CONTROL AND ACCOUNTING, AND PHYSICAL PROTECTION I

l;-

\

l

! 5. RADIOLOGICAL CONTROLS l

l l RADIATION PROTECTION, ENVIRONMENTAL PROTECTION, WASTE MANAGEMENT, AND TRANSPORTATION

6. FACILITY SUPPORT

^

OPERATOR TRAINING, EMERGENCY PREPAREDNESS, AND FIRE PROTECTION

7. SPECIAL TOPICS .

CERTIFICATE AMENDMENT SUBMITTALS AND RESPONSE TO i NRC'S REQUEST FOR ADDITIONAL INFORMATION AND SAFETY ANALYSIS REPORT UPGRADE SUBMITTALS l

l l

(

l i

n -

I FUNCTIONAL AREAS PRESENTED IN TERMS OF  !

I l l l e STRENGTHS  !

e AREA NEEDING IMPROVEMENT l ,

!

  • PROJECTED CHALLENGES TO PERFORMANCE I l

l l

i i

e 4

i 4

I

bh ' .

PADUCAH PERFORMANCE

SUMMARY

ASSESSMENT

. OVERALL PERFORMANCE ADEQUATE AND IMPROVING l

. IMPROVED PROCEDURES ENHANCED PERFORMANCE l

. OPERATIONS AND ENGINEERING TECHNICAL EVALUATIONS IMPROVED

. STAFF TRAINING NEEDS IMPROVEMENT

~

  • MAINTENANCE AND SURVEILLANCE ACTIVITIES GENERALLY ADEQUATE l

. ENGINEERING CHALLENGED BY DESIGN BASES

. IMPROVED CRITICAL ASSESSMENT OF KNOWN ISSUES AND INCREASED ABILITY TO SELF-IDENTIFY PROBLEMS i

i

,. ;i .

~

1 l

SAFETY OPERATIONS STRENGTHS e ASSESSMENTS OF SAFETY SYSTEM ACTUATIONS AND EQUIPMENT FAILURES e IMPLEMENTATION OF NEW PROBLEM REPORTING PROCESS e FOLLOW-UP TO PORTSMOUTH CRITICALITY SAFETY ISSUES AREAS NEEDING IMPROVEMENT e OPERATING PROCEDURAL DETAIL AND REVIEW QUALITY e BREADTH AND DEPTH OF SELF-ASSESSMENTS AND ASSOCIATED CORRECTIVE ACTIONS e WORKER UNDERSTANDING OF BASIS FOR NUCLEAR CRITICALITY SAFETY CONTROLS

  • COMMUNICATIONS BETWEEN OPERATIONS STAFF AND OTHER PLANT STAFF PROJECTED CHALLENGES TO PERFORMANCE e NONE PADUCAH

. - . .- - - _ - - . . - - . . . . . - - . . . . . . --.-- ~.- _

i >:

MAINTENANCE AND SURVEILLANCE ACTIVITIES STRENGTHS o RIGOROUS DEVELOPMENT, REVIEW, AND IMPLEMENTATION OF l MAINTENANCE PROCEDURES

e OUTAGE PLANNING FOR SIGNIFICANT POWER REDUCTION -

! SUMMER 1998 AREAS NEEDING IMPROVEMENT e APPLICATION OF PREVENTIVE AND CORRECTIVE MAINTENANCE PROGRAMS TO NON-SAFETY SYSTEMS AFFECTING SAFETY- l RELATED COMPONENTS )

4 PROJECTED CHALLENGES TO PERFORMANCE e NONE 1

1 i

PADUCAH i

i i

.. Ly ' .

  • 1 ENGINEERING AND NUCLEAR CRITICALITY SAFETY l

STRENGTHS e IDENTIFICATION, ASSESSMENT, AND TIMELY RESOLUTION OF SAFETY-RELATED EQUIPMENT ISSUES

! AREAS NEEDING IMPROVEMENT e EVALUATION AND TIMELY REPORTING OF CRITICALITY SAFETY IMPLEMENTATION ANOMALIES l

l-e RIGOR APPLIED TO SAFETY EVALUATIONS FOR AS-FOUND CONDITIONS OR PLANT CHANGES e DEVELOPMENT AND INCORPORATION OF CRITICALITY SAFETY REQUIREMENTS INTO PLANT PROCEDURES PROJECTED CHALLENGES TO PERFORMANCE e . INCORPORATION OF CURRENT SAFETY AND REGULATORY i REQUIREMENTS INTO ENGINEERING EVALUATIONS AND PLANT DESIGN BASES l

i PADUCAH r

[ . r. ' .

l SAFEGUARDS ACTIVITIES

?

l STRENGTHS e TIMELY, COMPREHENSIVE RESOLUTION OF SECURITY AND CLASSIFIED MATTER DEFICIENCIES i

AREAS NEEDING IMPROVEMENT e MATERIAL CONTROL AND ACCOUNTING FOR WASTE ITEMS AND EQUIPMENT e WORKER TRAINING ON SCENARIOS FOR INDICATIONS OF UNAUTHORIZED ACTIVITIES OR PRODUCTION f

PROJECTED CHALLENGES TO PERFORMANCE )

o RECENT (12/98) APPARENT VIOLATION OF CLASSIFIED MATTER i SECURITY PLAN AND OTHER INFRACTIONS INDICATE NEED FOR l CONTINUED EMPHASIS AND TRAINING l 1

i i

l l 1 PADUCAH

r, .

RADIOLOGICAL CONTROLS PROGRAMS i

, STRENGTHS l

e EFFECTIVE ALARA, TRANSPORTATION, ENVIRONMENTAL l l MONITORING, AND EFFLUENT MONITORING PROGRAMS  :

AREAS NEEDING IMPROVEMENT e DOCUMENTATION OF RADIOLOGICAL CONTROLS VIOLATIONS IN t l PROBLEM REPORTS FOR TREND ANALYSIS PROJECTED CHALLENGES TO PERFORMANCE e NONE I

i l

i f PADUCAH l

l I

l

t, - .

~

FACILITY SUPPORT i

' STRENGTHS- ,

e MAINTENANCE AND IMPLEMENTATION OF THE EMERGENCY {

PREPAREDNESS PROGRAM 4

e MAINTENANCE OF AUTOMATIC FIRE SPRINKLER SYSTEM AND ONSITE FIRE DEPARTMENT AREAS NEEDING IMPROVEMENT e V!ORKER TRAINING TO ENSURE UNDERSTANDING OF OPERATIONS, CRITICALITY SAFETY, RESPIRAiURY PROTECTION, l' AND OTHER PLANT POLICIES AND PROTOCOLS i

i

. PROJECTED CHALLENGES TO PERFORMANCE

  • NONE l l

i 1

i PADUCAH y .w. h --y --

g -- y- -- -- -,

.. z. v .

l

{3 c( i l~

SPECIAL TOPICS l STRENGTHS \

e NONE j 1

l-AREAS NEEDING IMPROVEMENT l 4 l

e QUALITY.OF CERTIFICATE AMENDMENT REQUEST SUBMITTALS ENSURE SUFFICIENT INFORMATION TO ALLOW TIMELY PROCESSING '

t PROJECTED CHALLENGES TO PERFORMANCE e NONE l l l

i l

l l

! PADUCAH l

... . :. c PORTSMOUTH l PERFORMANCE

SUMMARY

ASSESSMENT

  • OVERALL PERFORMANCE ADEQUATE l
  • IMPROVED UNDERSTANDING OF CRITICALITY CONTROLS
  • IMPROVEMENT NEEDED FOR ADHERENCE TO TECHNICAL SAFETY REQUIREMENTS AND PROCEDURES i

l

  • IMPROVEMENT NEEDED IN COMMUNICATIONS
  • SOME MAINTENANCE & SURVEILLANCE PROGRAMS NEED IMPROVEMENT l l i
  • - MAINTENANCE ACTIVITIES IMPACTED BY MATERIAL CONDITION
  • ENGINEERING CHALLENGED BY DESIGN BASES AND NUCLEAR 4

, CRITICALITY SAFETY PROGRAM

  • SIGNIFICANT DEFICIENCIES IN NUCLEAR CRITICALITY SAFETY PROGRAM i

s4 .

.m L SAFETY OPERATIONS  ;

1 l

j STRENGTHS

  • WONE AREAS NEEDING IMPROVEMENT
  • CORRECTIVE ACTIONS TO PREVENT RECURRENCE OF PROBLEMS e DEPTH OF AUDITS AND SELF-ASSESSMENTS e ADHERENCE TO TECHNICAL SAFETY REQUIREMENTS (TSRs) AND NUCLEAR CRITICALITY SAFETY (NCS) REQUIREMENTS i

e PROCEDURE ADHERENCE AND EFFECTIVE COMMUNICATIONS PROJECTED CHALLENGES TO PERFORMANCE e IMPLEMENTATION OF REVISED NCS REQUIREMENTS l

. l I PORTSMOUTH j l

l

z,<

l..

P MAINTENANCE AND SURVEILLANCE ACTIVITIES STRENGTHS e NONE AREAS NEEDING IMPROVEMENT e USE AND ADHERENCE TO PROCEDURES e SURVEILLANCE TESTING PROJECTED CHALLENGE 3 TO PERFORMANCE e PROCED: ilE REVIEW PROCESS e PREVENTIVE / PREDICTIVE MAINTENANCE PROGRAM l

1 PORTSMOUTH

l..

q< .

i I

l ENGINEERING AND NUCLEAR CRITICALITY SAFETY I l

STRENGTHS 1

e MECHANICAL INTEGRITY PROGRAM AREAS NEEDING IMPROVEMENT 1

e RECOGNITION OF COMPONENTS RELIED UPON FOR SAFETY e NUCLEAR CRITICALITY SAFETY PROGRAM CORRECTIVE ACTIONS e RIGOR OF OPERABILITY DETERMINATIONS AND SAFETY EVALUATIONS PROJECTED CHALLENGES TO PERFORMANCE l

e FAILURE AND TREND ANALYSIS )

e UNDERSTANDING OF PLANT DESIGN BASIS l

l-i PORTSMOUTH

. v 'n i

SAFEGUARDS ACTIVITIES STRENGTHS l

)

e COMPETENT SECURITY FORCE j

)

e IDENTIFICATION AND RESOLUTION OF SAFEGUARDS ISSUES AREAS NEEDING IMPROVEMENT  !

e RESOLUTION OF MEASUREMENT BIAS AND OTHER l 0 SCREPANCIES PROJECTED CHALLENGES TO PERFORMANCE i

e NONE l

l t

PORTSMOUTH

u. q- ~

i.;

RADIOLOGICAL CONTROL PROGRAMS i

i STRENGTHS i e EFFECTIVE ALARA AND TRANSPORTATION PROGRAMS AREAS NEEDING IMPROVEMENT e NONE PROJECTED CHALLENGES TO PERFORMANCE e NONE l

l i l

l i

PORTSMOUTH

. . - . . . - . . - - - - . .. - . _ - .. . . . - . ~. - . .- .

,. . L_0

'w -

g-FACILITY SUPPORT l

STRENGTHS e- ONSITE FIRE DEPARTMENT

  • RELIABILITY OF AUTOMATIC SPRINKLER PROTECTION SYSTEMS AREAS NEEDING IMPROVEMENT e PLANT TRAINING PROGRAM 1

PROJECTED CHALLENGES TO PERFORMANCE l e IMPLEMENTATION OF PLAN TO CORRECT TRAINING DEFICIENCIES i

I l

)

1 I

l l

PORTSMOUTH I

i

.~

t,,

t 3 - '. .

l I SPECIAL TOPICS l

l STRENGTHS i.

e- NONE AREAS NEEDING IMPROVEMENT l

  • ' QUALITY OF INITIAL AMENDMENT SUBMITTALS .

i PROJECTED CHALLENGES TO PERFORMANCE

  • RESOLUTION OF COMPLIANCE PLAN ISSUES i
  • IMPROVED COMMUNICATIONS WITH REGULATOR ,