ML20207D709

From kanterella
Jump to navigation Jump to search
1998 Annual Occupational Exposure Repts for Nmp,Units 1 & 2
ML20207D709
Person / Time
Site: Nine Mile Point  
Issue date: 12/31/1998
From:
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17059C581 List:
References
NUDOCS 9903100052
Download: ML20207D709 (4)


Text

Attachment IA

~

Nine Mile Point Nuclear Station Unit # 1 DPR-63 1998 Annual Occupational Exposure Report Numbers of Persnnnel > 0 mrem Exposure Totals 4 mrem s Work & Job Funcnon 5tation Utility Contract Total statha Ltility Contract Total Empleces Empleces

& 0:hers Empigees Empleces Empleces

& Others Mili-rems Remeter Operations & Sury.

Maintenance Penonnel 40 0

50 140 3.774 0

337 4,110 Opraung Penannel 59 0

4 63 7.069 0

18 7,086 Health Phpics Perwnnel 42 0

4 46 2.829 0

22 2,851 Enyneenng Perwnnel H5 1

40 126 963 1

151 1,115 Supeniwry Perwnnel 27 0

4 31 375 0

6 3H2 Total 303 1

102 406 15,009 1

533 15,544 Routine Maintenance Maintenance Penonnel 59 0

33 92 5.820 0

2.259 H,079 Operanng Penannel 31 0

0 31 1.247 0

0 1,247 Heahh Physics Penonnel 24 0

2 26 1,736 0

23 1,759 Enoneenng Penonnel 20 0

10 30 677 0

226 903 Supervisory Perwnnel 13 0

2 15 414 0

59 472 Total 147 0

47 194 9,893 0

2,566 12.460 IFhersice inspection Maintenance Perwnnel 2

0 0

2 92 0

0 92 Operaung Perwnnel 0

0 0

0 0

0 0

0 Health Physics Penonnel 2

0 0

2 34 0

0 34 Enpneenny Penonnel 2

0 0

2 51 0

0 51 i

Supermory Penonnel 0

0 0

0 0

0 0

0 Total 6

0 0

6 177 0

0 177 Special Maintenance Maintenance Penonnel 2

0 2

4 7

0 14 21 Operaung Personnel 0

0 0

0 0

0 0

0 Heahh Physics Penonnel 0

0 0

0 0

0 0

0

)

Enpneenng Penonnel 0

0 l

I O

O 2

2 Superviwry Personnel 0

0 0

0 0

0 0

0 Total 2

0 3

5 7

0 16 23 Waste Processing Maintenance Perwnnel lx 0

1 14 670 0

13 683 Operaung Perwnnel 18 0

7 25 2,474 0

1,455 3,929 Heahh Phyucs Penonnel 23 0

0 23 1.380 0

0 1,380 Enpreenng Penannel 1

0 1

2 21 0

354 375 Surentwry Perwnnel 4

0 0

4 100 0

0 100 l

Total 64 0

9 73 4,645 0

1.b22 6,467 Reffel5g 1

Mainienance Penonnel 3

0 0

3 48 0

0 48 Operanng Personnel 0

0 0

0 0

0 0

0 Itcatth Phpies Personnel 3

0 0

3 2.$.

0

'O 22 Engincenng Penonnel 0

0 0

0 0

0 0

0 Supemsory Perwnnel 1

0 0

1 2

0 0

2 Total 7

0 0

7 72 0

0 72 Summary by Job Functmn Maintenance Penonnel 174 0

ob 260 10.410 0

2,623 13.032 Operanny Perwnnel 108 0

1I II9 10,789 0

1.473 12.262 Heahh Phpics Perwnnel 94 0

6 100 6,001 0

45 6,045 Enpneenny Penannet 108 1

52 161 1,71I i

733 2,445 Supenwry Personnel 45 0

6 51 892 0

65 957 Grand Total 529 1

161 691 29.803 1

4.93N 34,742 9903100052 990225 ~

PDR ADOCK 05000220 R

PDRg

Attachment IB 1998 Nine Mile Point - Unit 1 Description of Special Maintenance Activities J:b Description Post Accident Sampling Sink Over-Pressurization Modification

L Attachment'2A N;'e Mile Point Nuclear Station Unit # 2 NPF-69 1998 Annual Occupational Exposure Report Numbers of Personnel > 0 mrem Exposure Totals amreme Work & Jeb Functon Station UtSisy. Centract Tesal Station Utuity Contract Tetal Employees Employees

& Others Empicyees Employees Employees

& Others Mai-rems bacter operations a serv.

Maintnance Personnel 94 0

173 267 3.204 0

6.611 9,815 Operring Penonnel 94 1

1-15.078 3

2 15.083 Health Physics Personnel

.101' O.

53 154 9,081 0

2.561 11442 Engineenng Penonnel 131 0

50

'181 1,655 0

403 2,058 Srpervisory Personnel 33

.0 12 45 350 0

167 517 Tesal

.453 1

289 743 29.369 3

9,743 39 !!5 Rautine Maintenance Maintenance Personnel 291 0

637 928 59,794 0

81.134 140,928 -

Operating Personnel

' 66 0

3 69 2.125 0

46 2,171 Heahh Physics Personnel 60 0-

'48 108 5,996 0

9.153

.15,149 Engineenng Personnel 86 2

82 170 3.470 to 4,826 8,305 Supervisory Personnel 43 0

23 66 2,779 0

1,260 4,038 Tesat 546 2

793 1,341 74,164 10 96,418 170J91 In service inspection Wnsenance Personnel 1

0 153 154 8

0 16,932 16,940 Operating Personnel 0

0 0

0 0

0 0

0 Heahh Physics Personnel 9

0 4

13 59 0

39 98 Engineenng Personnel 8

0 53 61 143 0

10.241 10.383 Supervisory Personnel 1

0 4

5 12 0

263 275 Total 19 0

214 233 222

0 27,474 27497 Special Maintenance

. hmenance Personnel 90 0

392 482 8,016 0

- 41,130 49,146 Operating Personnel 20 0

1 21 97 0

.112 289 Health Physics Personnel 18 0

13 31 260 0

545 805 Engineenng Penonnel 23 1

26 50 895 9

2.269 3,173 Supervisory Personnel 15 0

8 23 186 0

278 464 Tesai 166 1

440 607 9,454 9

44J34 53,797 waste Processing Maintenance Penannel 0

0 0

0 0

0 0

0 Operaung Personnel 19 0

5

- 24 1,759 0

851 2,610 Heahh Physics Personnel 6

0 2

8 58 0

6 64

. Engineenng Personnel 0

0 1

1 0

0 3

3 SIpervisory Personnel 3

.0 0

3 26 0

0 26 Tesel 28 0

8 36 1,842 0

360 A702 Rehesing Mairmenance Personnel.

70 0

222 292 2,129 0

25,166 27,295 Operaung Personnel 43 0

0 43 2,165 0

0 L165 -

Heahh Physics Personnel 19 0

13 32 1,179 0

1,381 2,560

~.

- i Penonnel 20 0

46 66 356 0

3,454 3,810 Supervisory Personnel 11 0

8 19 374 0

76 450 Total 163 0

289 452 6,203 0

30,077 36,280 Sumi.r-y by Job Function Mas -

,V 546 0

1,577 2,123 73.151 0

170,973 244,124

.Operaung Personnel 242 1

10 253 21.224 3

1.010 22.237 Heal 2 Physics Personnel 213 0

133 346 16.633 0

13,685 30,318 Engineenng Personnel 268

.3 258 529 6,520 19 21,194 27,733 Srpervisory Personnel 106 0:

55 161 3,727 0

2,043 5,770 Grand Total 1,37.5 4

2,033 3.412 121,254 22 200,906 330,182 l

~

Attechm:nt 2B 1998 Nine Mlle Point - Unit 2 Description of Special Maintenance Activities Job Description RB353 REMOVE BOOM FROM DECON BRIDGE RB175 INSTALL EMERGENCY LIGHTS RB353 REMOVE BOOM FROM DECON BRIDGE RB353 REFUEL & DECON BRIDGE WORK TB277 REPAIR / MODIFY 2CND-AOV6C RB289 TO 175 PMT FOR LIGHTING MOD l

RB175 RB196 MODIFY ICS SYSTEM l

RB196 SNUBBER REDUCTION S. VLV. PIT TB HWC MOD INSTALL CABLE / TRAYS /CONDUlT RB261 & 289 SNUBBER REDUCTION WORK RB175 NAB CSL*P1 A RM SNUBBER REDUCTION i

RB175 & 196 NAB SNUBBER REDUCTION WORK RB175 & 196 SNUBBER REDUCTION ACTIVITIES RB289 AZ315 MEZZ REPLACE VALVE 2RHS*V235 RB175-289 SNUBBER REDUCTION ACTIVITIES RB215 PRE-OUTAGE SUCTION STRAINER WORK TB306 REPAIR 2 MSS-E1 A AND SUPPORT TB306 REPAIR 2 MSS-E1D AND SUPPORT TB250 REBUILD 2HDL-P1C RB/TB RFO-6 SNUBBER / STRUT ACTIVITIES RB175 INSTALL PIPE, REPLACE O-RING j

SP SUCTION STRAINERS, DIVING, CLEANING i

RB240 TEST /PM ACTUATOR /REPAlR MS!V RB289 REPAIR 2CSL*MOV104 VOTES /LLRT 4

i TB250 REMOVE / REPLACE ZINC INJECTION SYS RX318 WCS HX REPAIR / REPLACE 2WCS-FV135 l

DW249 REPLACE 19 RCS FLEX HOSES DW SNUBBER AND STRUT ACTIVITIES RB261 REPLACE VALVE 2RCS*SOV105 DW261 REPLACE VALVE 2RCS*SOV104 i

RB175 REPAIR OR MODIFY 2lCS*MOV120/159 DW261-306 FLEX HOSE REMOVAL / REPLACEMENT RB215 ECCS SUCTION STRAINER DEMOB WORK RW291 REROUTE THERMAY 40SES TB277 REB.UILD 2CND-AOV6A & 2CND-AOV6G DW RCS WORK,2RCS*HYV17A/B ACTUATOR, ETC

!