esteese NRC 0FERATIN6 STATUS REPORT COMPLETED BV REACTOR ENGINEERING HeHee
- 1. DCCKET.... 50-423 OPERATING STATUS
- 2. REPORTIN6 PERIOD...AU6UST 1986 0UTAGE + DNLINE HOURS... 406.7 + 337.3 = 744
- 3. UTILITY CONTACT.................A. L. ELMS 203-444-5388 eeHHesseees
- 4. LICENSED THERMAL P0WER.........................................
3411 e MILLST0hE e
- 5. NAMEPLATE R AT ING (6RO SS MWE)....,.............................. 1,253 M e UNIT 3 e
- 6. DESIGN ELECTRICAL RATING (NET MWE)..............................
1153.61 HHHeHeHe
- 7. MA!! MUM DEPENDABLE CAPACITY (6ROSS MEl........................
1897
- 8. MAIIMUM DEPENDABLE CAPACITY (NET ME)........................... !!49.35 9.
IF CHANGES DCCUR ABOVE SINCE LAST REPORT, REASONS ARE...........
N/A
- 10. POWER LEVEL TO NHICH RESTRICTED, IF ANY (NET ME)...............N/A
!!. REASON FOR RESTRICT!DN, IF ANY....N/A MONTH YEAR TO DATE CUMULATIVE TO DATE ESERS S33333333333 E33583EE3333333333
- 12. HOURS IN REPORTING PERIOD 744.0 3143.0 3143.0
- 13. NUMBER OF HOURS THE REACTOR NAS CRITICAL 367.5 2502.8 2502.6
- 14. REACTOR RESERVE SHUTDONN HOURS 0.0 83.2 B3.2
- 15. HOURS 6ENERATOR ONLINE 337.3 2456.5 2456.5
- 16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 17. BROSS THERMAL ENER6Y GENERATED (MH) 969533.0 B029366.7 8029366.7 18, 6ROSS ELECTRICAL ENERBY BENERATED (MWH) 326800.5 2776713.0 2776713.0
- 19. NET ELECTRICAL ENER6Y BENERATED (M H) 302680.8 2645200.9 2645200.9
- 20. UNIT SERVICE FACTOR 45.3 78.2 78.2 21.UNITAVAILABILITYFACTOR 45.3 78.2 78.2
- 22. UNIT CAPACITY FACTOR (USIN6 MDC NET) 35.4 73.2 73.2
- 23. UNIT CAPACITY FACTOR (USIN6 DER NET) 35.3 73.0 73.0
- 24. UNIT FORCED DUTAGE RATE 54.7 21.8 21.8
- 25. UNIT FORCED OUTABE HOURS 406.7 686.5 686.5 SHUTDOWNS SCHEDULEJ OVER NEIT SII MONTHS (TYPE, DATE, AND DURAT10N OF EACH)..............
N/A IF CURRENTLY SHUTDCWN, ESTIMATED STARTUP DATE......N/A 8612310149 860831 PDR ADOCK 05000423 R
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-423 UNIT Millstone Unit No. 3 DATE September 8, 1986 COMPLETED BY A. Elms TELEPHONE (203) 444-5388 MONTH August DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 257 3
0 19 269 4
0 20 365 5
0 21 849 6
0 22 1116 7
0 23 1127 8
0 24 1119 9
0 25 1115 10 0
26 1124 11-0 27 1116 12 0
28 1116 13 0
29 1134 14 0
30 1103 15 0
31 1136 16 0
l
[
l i
"i
~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-423 UNIT Millstone Unit No. 3 DATE September 8, 1986 COMPLETED BY A. Elms TELEPHONE (203) 444-5388 REPORT MONTH AUGUST 1986 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.
Date Type (1)
(Hours)
Reason (2)
Down Reactor (3)
Report #
Code Code Prevent Recurrence B6-05 8-1-86 F
383.8 A
3 86-041 SJ TC Continuation from previous month.
Trip during shutdown to repair Main Generator Stator Coolant leak and valve in letdown system.
B6-06 8-17-86 F
12.8 G
3 86-048 JB N/A Low Steam Generator Water Level B6-07 8-17-86 F
10.1 G
3 86-049 JB N/A Low Steam Generator Water Level 1
2 3
4
-F:
Forced
-Reason:
-Method:
-Exhibit G - Instructions S:
Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets for C - Refueling 3 - Automatic Scram Licensed Event Report D - Regulatory Restriction 4 - Continued from (LER) File (NUREG-0161)
E - Operator Training & License previous month Examination 5 - Power Reduction 5 F - Administrative (Duration = 0)
Exhibit 1 - Same Source G - Operational Error (Explain) 9 - Other (Explain)
H - Other (Explain)
j EM General Offices e Selden Street, Berlin. Connecticut vYUsac viIsNcNa~w P.O. BOX 270
== ama ama cwaa"'
HARTFORD. CONNECTICUT 06141-0270 L
L J [,((, C',",72,"j"j' (203) 665-5000 September 11, 1986 MP-9478 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Reference:
Facility Operating License No. NPF-49 Docket No. 50-423
Dear Sir:
In accordance with reporting requirements of Technical Specifications Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Report 86-9 covering operations for the month of August is hereby forwarded.
Yours truly',
NORTHEAST NUCLEAR ENERGY COMPANY h a9 D !
Wayne D. Romberg Station Superintendent Hillstone Nuclear Power Station WDR/ ALE:sb Attachment cc:
Regional Administrator, Office of Inspection and Enforcement, Region I Director, Office of Inspection and Enforcement, Washington, D.C. (10)
U. S. Nuclear Regulatory Commission, c/o Document Management Branch, Washington, D. C. 20555 JEM il \\