FM JUL 11 B86 Docket Nos. 50-266 and 50-301 Mr. C. W. Fay, Vice President Nuclear Power Department Wisconsin Electric Power Company 231 W. Michigan Street, Room 308 Milwaukee, Wisconsin 53201
Dear Mr. Fay:
SUBJECT:
CONFORMANCE TO REGULATORY GUIDE 1.97 FOR THE POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 Generic Letter 82-33 requested that licensee's provide a report to the NRC describing how the post-accident monitoring instrumentation meets the guidelines of Regulatory Guide 1.97 Revision 2 as applied to emergency response facilities. You responded to this request by letters dated September 1, 1983, August 30, 1985 and November 27, 1985.
We have completed our review ot your responses, the details of which are included in the enclosed staff Safety Evaluation (SE) and attached Technical Evaluation Report (TER) prepared by our contractor EG&G of Idaho.
Based on our review, we find that the Point Beach Nuclear Plant Units 1 and 2 design acceptably conforms to, or has provided acceptable justification for deviation from, Regulatory Guide 1.97 Revision 2.
However, as stated in the SE, because the neutron flux instrumentation will only have one environmentally and seismically qualified channel, the staff will require more frequent surveillance intervals as Technical Specifications for this instrumentation than it would for a qualified two channel system. This has 8607220151 e60711 PDR ADOCK 05000266 P
s been d-:scussed with members of your staff.
If you have any questions, please contact me at (301) 482-9787.
Sincerely, 4/
Timothy G. Colburn, Project Manager Project Directorate #1 j
Division of PWR Licensing-A
Enclosure:
Safety Evaluation with attached Technical Evaluation Report cc's: See Next Page i
b i
i i
i i
i l
i i
l l
Office:
PM/ PAD #171 PD/ PAD #1 Surname: TColburn/tg Glear Date:
07/7/86 07/f/86
Mr. C. W. Fay Point Beach Nuclear Plant Wisconsin Electric Power Company Units 1 and 2 cc:
Mr. Bruce Churchill, Esq.
Shaw, Pittman, Potts and Trowbridge i
1800 M Street, N.W.
Washington, DC 20036 Mr. James J. Zach, Manager Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Gordon Blaha Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 Chairman Public Service Commission of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137 Resident Inspector's Office U.S. Nuclear Regulatory Conmission 6612 Nuclear Road Two Rivers, Wisconsin 54241