Monthly Operating Rept for Aug 1986
ML20207D588
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 08/31/1986
From: Colville J, Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Scroggins R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ANPP-38246-JGH, NUDOCS 8612310096
Download: ML20207D588 (8)


Text

- _ _

k 7

K h

s p

NRC NONTHLY OPERATING REPORT DOCKET NO.

5g-529_

UNIT NAME PVNGj-2 DATE 99fppf!n COMPLETED BY J N_._Colville.

2 TELEPHONE

@p2-_932-5399 2_

l'-

E24 _9593 OPgRATIjdG_ STATUS 1.

Unit Name: P_glg _Yggdg _N_gglagt _G_gugtggiug _gtgt ign t _U_ g it _2 2.'

Reporting Period: Au_ gust _1986 3.

Licensed Therma 1 Power (MWt): 3399-4.

Nameplate Reting (Gross MWe): 1_493 5.

Design Electrical Rating (Met MWe):

1221 6.

Maximum Dependable Capacity (Gross MWe): Ig_b3_ggggggingd 7._

Maximum Dependable Capacity (Not NWe):

Tg_)3_dytyggiggd 8.

If Changes Occur In Capacity Ratinga (Items Number 3 Through 7)

Since Last' Report, Give Reasons: _

9.

Power Level to Which Restricted, If Any (Net NWe):_ _ _ _ _ _ _ _ __N_QNE_____

______=

10.

Reasons For Restrictions, If Any:.____

_=

==

This Month Yr.-to-Date Cumulative 11.

Hours in Reporting Period

__744_____

__324L 25__

_g15L 25 *_

12.

Number.of Hours Reactor Was Critical

__45g32___

__159@_____

_1_M

' 13.

Reactor Reserve Shutdown 14.

Nours Generator On-Line

__395_.9___

__1_189.9 _. _

_____g____

' Hours

_____Q____

_____O

_ 1_1,8 9_._ 9_ _ _ _

15.

. Unit Reserve Shutdown 16.

Gross Thermal Energy

_Q____

_____O

_ _ _ _ _O _

Hours Generated (NWH)

_Zgh,Zi6 ltqMtqq3___

ltqMtq53_

17.

Gross Electrical Energy

_54,7 Sg0___

Generated (NWH)

_251 ggg__

_547 599___

t t

t 18.

Net Electrical Energy Generated (NWH)

_29qt350

_412 @21___

_412 @21__

t t

19.

Unit Service Factor N{A___

__ _ _N LA,_ _ _ _

____N/A___

20.

Unit Availability Factor

_NLA___

N/A____

____N{A___

21.

Unit Capacity Factor (Uning NDC Net)

__ _ _N LA,_ _ _

_ ___N fA Ng 22.

Unit Capacity Factor

_ ___N_ / A__ _ _

p j$@

(Using DER Net)

____N/A

___ _N_/ A ___and Duration

_ _ __N_ / A_ __ _ _

____N/A_

g 23.

Unit Forced Outage Rate

_ _ __N_ LA_ _ _ _

___ _N_ fA___ _

24.

Shutdowns Schaculed Over Next 6 Nonths (Type, Date, yO of Each): No_s3ggificant_ outage _ planned _ugtil_after_ warranty _run_

g 25.

If Shutdoen At End of Report Period, Estimated Date of Startup:

00 N/A~

~

(Prlo~r~To Commercial bperationE

~~~

U~its in Test Status O,$

26.

n n

' N. e Forecast Achieved

$@g INITIAL CRITICALITY

__3ff9__

_4f13/93_

INITIAL ELECTRICITY

__92_8p__

_5/292_89_

COMMERCIAL OPERATION 11/86

=-

q

  • See attached page p

?.

l l

AVERAGE DAILY UNIT POWER LEVEL 1

l DOCKET NO.

50-529

~~E G52 ~~~~~~~~

UNIT

--2 --------

DATE ------------

09/08/86 COMPLETED BY J.M.-----Colville TELEPHONE 602-932-5300

_=

gg------

MOMTH:

August 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 0

17 581 1

- = -.

___=-----------------

2

_ - _ =

0 18 577

=---.

567 3

- _ _109------_

19 =

364 20

- - _567 4

5

--473-------__

21 __

=------__

_=

591 535 6

--=

- _ = =

0----

22 =-

=-----------

747 7

= -.

0 2 3 _ _.

__=----------------

977 8

0 24 -


=

9

= - - _ - _ - - -

25 409 0

10

---==_

26 _ = -

0 0

---------=

0 507 11 ---

27 0

427 12 ---

28 -_-

0 13 0=--

29 -_

14 - - -

= _ - - - -

30 -

125 0

773 15 --

=--605-------------

31

- - - - - - - - - - = - - - - -

16 - -_ _

462

j r

t REFUELING INFORNATION DOCKET NO.

59-529_______

UNIT PVNGS-2______

DATE 09/98f_89_____

CONPLETED BY L N.__Cplyllle TELEPHONE 302-932-5300_

2 0

Eyt_.__65____ 1. Scheduled date.for next refueling shutdown. 01/02/88 2. Scheduled date for restart following refueling. 02/20/88 3. Will refueling or resumption or operation thereafter require a Technical Specification change or other license amendment? Not Yet Determined What will these be? Not Yet Determined 4. Scheduled date for submitting proposed licensing action and supporting information. Not Yet Determined 5. Important Licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures. Not Yet Determined 6. The number of fuel assemblies. a) In the core. ____241 b) In the spent fuel storage pool. ______0______ 7. Licensed spent fuel storage capacity. ___1322___ Intended change in spent fuel storage capacity. ___Ngge___ 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity. I 2003 (w/ annual reloads and full core discharge capability).

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 59-}29 UNIT PVNgS-2______ DATE 99/98_/_86 COMPLETED BY J ]!_. C _o _1 v i l l e 2 TELEPHONE 902-932-}30g_ _Egh _6993____ 9 c 08/01 0000 Plant in Mode 3. 08/02 0603 Reactor Critical - Entered Mode 2. 08/03 0215 Entered Mode 1. 08/03 1046 Synchronized Main Generator to-Grid. 08/03 1641 Reactor power et 404. 08/05 2344 Received spurious ** Reactor trip ** signal resulting in Main Turbine Trip. 08/06 0000 Reactor power reduced to 62 08/06 0412 Reactor Trip due to loss of offsite power source when Startup Transtormer MAN-XO3 relayed out - Entered Mode 3. 08/13 1022 Reactor Critical - Entered Mode 2. 08/13 1258 Entered Mode 1. 08/13 1627 Synchronized Maire Generator to Grid. 08/14 1904 Reactor Power at 504. 08/24 0210 Reactor Power at 804. 08/25 1009 Main Generator lockout occurred initiating Turbine Trip - Reactor Trip on Hi Pressurizer Pressure Entered Mode 3. 08/26 2111 Reactor Critical - Entered Mode 2. 08/27 0215 Entered Mode 1. 08/27 0528 Synchronized Main Generator to Grid. 08/27 0645 Reactor Power at 224 I 1 08/27 1830 Reactor Power at Sox.

em

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-529_- t UNIT PVMGS-2______ j DATE 99/08/8@_____ l COMPLETED BY J M.__Cojvj}}e 2 i TELEPHONE $92-932-5_399_ E & _@5N____ 08/28 1055 Generator was overexcited which caused Turbine Trip - Reactor Trip on Hi Pressurizer Pressure - Entered Mode 3. 08/30 1723 Reactor Critical - Entered Mode 2. 08/30 1837 Entered Mode 1. 08/31 0014 Synchronized Main Generator to Grid. 08/31 0411 Reactor Power at Sox. 08/31 1117 Reactor Power at 804.

e ' UNIT SHUTDOWNS AN3 POWER REDUCTIONS DOCKET NO. J 0 4 79 3 UNIT NAHC P V MCS-2 1 ~ COMPLETE olville ~' TELEP180NC _9 U-5100 re no3 Hethod or

  • Shutting Down System Component Cause & Corrective 1

Dt:ra t ion 2 3 f.CR 4 Action to No. Date Type litours) ltesson Rosctor No. Codo Code ~ Prevont Recurrence 14 8/5/86 F 0 A N/A N/A TA 94 Received spurious "R'eactor trip" signal ~ ~ resulting in Main Turbine trip. 15 8/6/86 F 184.7 A 3' 2-86-003 EA XCT'.' Reactor trip due to loss of offsite power "so'urce clien Startup Transformer l, NAN-XO3 relayed out. ~ 16 8/25/86 F O A N/A' N/A. EL XCT Main gen rator lockout occurred initiating Turbine trip. i 17 8/25/86 F 43.3 H 3 2-86-026 JI Reactor trip on Hi Pressurizer Pressure due to Reactor Power Cutback being out of service because both CEAC's were inoperable and Tech. Specs. require RPCS to be out of service. l 18 8/28/86 F 0 A I N/A N/A EX XCT Generator was overexcited which caused i Turbire trip. 19 8/28/86 F 61.3 A 3 2-86-033 JI PDT Reactor t' rip on Hi Pressurizer. Pressure. a r 1 2 T-rorced Pt re* : 3 4 Hethod: S-Schoduled A-fouipment falloro (Expla in) 1-Hanual [whlblt F - Instructions D-flaintenance or Test for rrnparation or Data C-l(c ruc t ing 2-ttanua l Sc ram, intry Sticcts for Licensoo 0-negulatory ncstriction 3-Aistoma tic Scram. E-Opera tor Tra ining h I.lcense Examina tion 4-continuation from-Event Report (LCR) TI,1c (nun [c 0161) rrnvious Nonth f-Administrativn 2 c-Oporational Error (Explain) 5-Reduction or 20% 5 or creator in the Exhibit H-Some Source Il-Otifer (Expla in) g,gt 28a flours,

  • An error was discovered in the cumulative hours for the reporting period in the February, 1986, Monthly Operating Report. The cumulative hours for the report-ing period for August reflect the correction made to the February data.

y Arizona Nuclear Power Project P.O. BOX 52034 e PHOENIX, ARIZONA 85072-2034 ' September 15, 1986 ANPP-38246-JGH/PGN/98.05 Mr. Ronald M. Scroggins, Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS) Unit 2 Docket No. STN 50-529 (License NPF-51) August Monthly Operating Report File: 86-024-404

Dear Mr. Scroggins:

Attached please find the August, 1986, Monthly Operating Report prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifica-tions) to the Palo Verde Nuclear Generating Station, Unit 2 Operar.ing License. By copy of this letter we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V office. If you have any questions, please contact me. Very truly yours, AA W J.G.Haynles Vice President Nuclear Production JGH/PGN/rw Attacliment cc:

0. M. De Michele (all w/a)

E. E. Van Brunt, Jr. J. B. Martin R. P. Zimmerman E. A. Licitra A. C. Gehr INPO Records Center TE2-4 @}}