Notice of Violation from Insp on 860510-0611
ML20207D315
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 07/11/1986
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20207D295 List:
References
50-320-86-06, 50-320-86-6, NUDOCS 8607220073
Download: ML20207D315 (1)


Text

.

APPENDIX A NOTICE OF VIOLATION GPU Nuclear Corporation Docket No. 50-320 Three Mile Island Unit 2 License No. DPR-73 As a result of accordance the with inspection the conducted NRC Enforcement May(10 Policy - June 10 CFR 11, 1986, 2, Appendix C),and the in following violations were identified:

A. 10 CFR 20.311(d)(3), " Transfer for disposal and manifests" requires that a licensee who transfers radioactive waste to a land disposal facility conduct a quality control program to assure compliance with 10 CFR 61.56.

10 CFR 61.56 requires, in part, that freestanding and non-corrosive liquids not exceed one percent of the volume of solid wastes.

Contrary to the above, during 1985, the licensee transferred several radioactive waste shipments of dewatered resin to a land disposal facility in the State of Washington and the licensee did not conduct a quality control program to assure that the packages contained less than one percent by volume freestanding liquid.

This is a Severity Level IV violation (Supplement V).

B. Technical Specification 6.8, "Prccedures," requires that written procedures be established, implemented and maintained.

Procedure No. 4000-ADM-1218.02, Revision No. 6-00, Section 4.6.6.2, dated July 22, 1985, required, in part, that procedures, classified as Important to Safety, pertaining to final preparation for shipment of radioactive materials, including those for dewatering, be reviewed and concurred in by Quality Assurance as a part of the approval process.

Contrary to the above, Procedure No. 4215-0PS-3526.18, " Dewatering of EPICOR Liners at EPICOR II," Revision'No. 1-00, dated August 6, 1985 and Procedure No. 4215-0PS-3233.08, "EPICOR II 4x4 and 6x6 Liner Supplemental Dewatering,'" Revision 1-00, dated February 3,1986, procedures classified Important to Safety, did not receive Quality Assurance review as part of the approval process.

This is a Severity Level IV violation (Supplement V).

Pursuant to the provisions of 10 CFR 2.201, the GPU Nuclear Corporation is hereby required to submit to this office within thirty days of the date of the letter which transmitted this Notice, a written statement or explanation in reply, including: (1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending this response time.

0FFICIAL RECORD COPY 8607220073 860711 PDR ADOCK 05000320 l G PDR

__