ML20207D184

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Mar 1986
ML20207D184
Person / Time
Site: Turkey Point, 05000000
Issue date: 03/31/1986
From: Grant N
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20207D146 List:
References
NUDOCS 8607220035
Download: ML20207D184 (1)


Text

i l

REVISED COPY OF MARCH REPORT l

UNIT SIIUTDOWN5 AND POWER REDUCTIONS DOCKET NO.

50-250 Ufei nab 8E Turkey Po in t. Unit a? 3 DATE May 15, 1986 RE70RT h00ffill !! rch,1986 CORELETED RY N.

W.

C rran t TER.EF900NE 305/552-3675 r

~~m 1e "s

}gEIIi teceawe P.

a ca== a cweeui.e No.

lhese I,

3s g

j Evene 3 1F Adenn so 5$

5 jdig Repaws *

  • E 0 g

Prevene Recweente d

04 860305 F

646.2 A

1 250-86-009 WG ZZZZZZ Unit 3 shut down to resolve potential concerns with the component cooling water (CCW) system which arose during a FPL initiated in depth review of select plant systems. Following testing and flow balancing of the CCW system and investigation and evaluation of potential concerns with diesel generator loading, the unit prepared to commence heat up to support returning to power operation in early April.

1 2

3 4

F-F wced Reassm:

teethod.

Entdhes G -Inssnescskus 5 Sstwdeded AE;

- Fadwe(Emplaint I-Menesi for Pteparatiews of Desa 8 h.* w Tese 2-Manuel Scram.

Emery $1seess fw ljcensee C Refuehns 3 Amecenatic Scsaen.

Event Re,ewilLERIFdeINUREG.

D Regulasswy Resasictam

$Olmer (Emplass) 01611 I Alperse w Tsaining & IAenw F mananatum F-AJannestrasive I" OWh*#

5 G Opeeaemmel bein IhpleenI c. g,, a m,..d E slubs: I Sauw Sinsree rei D l 11 3 herIEaplam l 8607220035 860515 PDR ADOCK 05000250 PDR R