ML20207D169
| ML20207D169 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point, 05000000 |
| Issue date: | 04/30/1986 |
| From: | Grant N FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20207D146 | List: |
| References | |
| NUDOCS 8607220031 | |
| Download: ML20207D169 (16) | |
Text
AVERAGE DAILY UNITPOWER LEVEL DOCKET NO.
50-?mn UNIT Turkey Point 3 DATE _Mav 15. 1986 COMPLETED BY fLW. Grant TELEPHONE (305)SS2-3675 MONTH April 1986 DAY AVER ACE DAILY POWER LEVEL (MWe Net) 4/ 1/86
-9 4/ 2/86
-11 4/ 3/86
-11 4/ 4/86
-18 4/ 5/86
-22 4/ 6/86
-22 4/ 7/86
-21 4/ S/86
-21 4/ 9/86 45 4/10/86 598 4/11/86 668 4/12/86 688 4/13/86 690 4/14/86 692 4/15/86 692 4/16/86 688 4/17/86 693 4/18/86 698 4/19/86 698 4/20/86 700 l
4/21/86 698 l
4/22/86 697 4/23/86 695 4/24/86 696 4/25/86 698 4/26/86 696 4/27/86 691 4/28/86 691 4/29/86 688 4/30/86 687 8607220031 860515 PDR ADOCK 05000250 R
d OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 5/13/86 COMPLETED BY N.
W.
GRANT TELEPHONE 305/552/3675 OPERATING STATUS 1.
UNIT NAr;E: TURKEY POINT UNIT 3 2.
REPORTING PERIOD:
APRIL 1986
- 3. LICENSED THERMAL POWER (MWT):
2200 4.
NAMEPLATE RATING (GROSS MWE):
760 5.
DESIGN ELECTRICAL RATING (NET MWE):
693 1
6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
700 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
~
666 8.
IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE i
I'
- 11. HOURS IN REPORT PERIOD:
719 2879 117488.6
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
531.9 1784.4 80862.1 i
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 844.4
- 14. HOURS GENERATOR ON-LINE _________________
508.0 1740.6 80147.4
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
121.8
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1108434 3737639 165943160
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 364320 1227970 53099515
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 343551 1156850 50266431
- 19. UNIT SERVICE FACTOR _____________________
70.7 60.5 68.2
- 20. UNIT AVAILABILITY FACTOR ________________
70.7 60.5 68.3
- 21. CAPACITY FACTOR (USING MDC NET) 71.7 60.3 65.8
- 22. CAPACITY FACTOR (USING DER NET) 68.9 58.0 61.7 i
I
- 23. UNIT FORCED OUTAGE RATE _________________
29.3 39.5 8.1 l
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
f
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
i I
l
50-250 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME Turkey Point L1 nit #3 DATE May 15, 1986 COBOLETED BY N. W. Grant REFORT MONTH Anril. 1986 TELEPHONE (1nsi ss?_167s i
E E
[E 3
j E5 Licensee gg
- t Cause & Corrective N...
Date
{
~g it
.;;; 5 E Event 3,7
^'N""'"
E
$E E
j 65 g Report 8 mV g'
Prevent Recurrence 6
04 860327 F
210.9 A
4 250-86-009 WG ZZZZZZ Continued the investigation and evaluation of potential concerns with diesel generator loading.
l 250-86-15 CF VALVEX T'c unit continued shutdown to 250-86-16 CJ ACCUMU repair LCV 460, CV2818 Solinoid WG PUMPXX Valve, for MOV Repairs and Tests, an accumulator nitrogen leak and the "A" Auxiliary Feedwater Pump.
Those items were repaired and the unit returned to power.
I 2
3 4
F Forced Reason:
Method:
Enhilpit G - Inst ructions S Scheduled A Equipment Failure (Explain) 1 Manual for Preparatiim of Dasa 8 Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event ReporI(LER) File INUREG-D-Regulatory Restriction
$ Other IEmplam) 01611 1.-Operator Training & Ixense Fuamination F Administrative Y ~ C * ** '* **
- 8" 5
G Operatiemal bror IF splaint 4.
4,4. Aseve Eshibit 1 - Same Source l'8/77)
Il-Other ( E uptaml
r-
SUMMARY
OF OPERATINC EXPER.TENCE DOCKET NO.
50-250 UNIT Turkey Point Unit #3 l
DATE May 15, 1586 COMPLETED BY N. W. Grant l
TELEPHONE (305) 552-3675 i
l REPORT MONTH April, 1986 See the " unit shutdowns and power reductions" report.
4 I
1 i
i l
t
AVER AGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turkey Point 4 DATE May 15,1986 COMPLETED BY N.W. Grant (305)552-3675 TELEPHONE MONTH Anvil 19R6 DAY AVERACE DAILY POWER LEVEL (MWe Net) 4/ 1/86
-1 4/ 2/86 0
4/ 3/86 0
4/ 4/86 0
4/ 5/86 0
4/ 6/86 0
4/ 7/86 0
4/ 8/86 0
4/ 9/86 0
4/10/86
-1 4/11/86
-1 4/12/86
-1 4/13/86
-1 4/14/86
-1 4/15/86
-1 4/16/86
-1 4/17/86
-1 4/18/86
-1 4/19/86
-1 4/20/86
-1 4/21/86
-1 4/22/86 0
4/23/86 0
4/24/86 0
4/25/86 0
4/26/86 0
4/27/86 0
4/28/86 0
4/29/86
-1 4/30/86
-1
OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 5/13/86 COMPLETED BY N.
W.
GRANT TELEPHONE 305/552/3675 OPERATING STATUS 1.
UNIT NAME: TURKEY POINT UNIT 4
- 2. REPORTING PERIOD:
APRIL 1986
- 3. LICENSED THERMAL POWER (MWT):
2200 4.
NAMEPLATE RATING (GROSS MWE):
760
- 5. DESIGN ELECTRICAL RATING (NET MWE):
693 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWF):
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE).
700 666 8.
IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUM5JR 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) ________________________
- 10. REASONS FOR RESTRICTIONS, IF ANY:
610NTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
719 2879 111220.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
0.0 225.4 77860.6
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 166.6
- 14. HOURS GENERATOR ON-LINE _________________
0.0 225.1 75320.2
- 10. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
32.1
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 440167 159477896
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH)
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0 139235 50781807
-1013 127539 48088747
- 19. UNIT SERVICE FACTOR _____________________
0.0 7.8 67.7
- 20. UNIT AVAILABILITY FACTOR ________________
0.0 7.8 67.7
- 21. CAPACITY FACTOR (USING MDC NET) 0.0 6.7 66.5
- 22. CAPACITY FACTOR (USING DER NET) 0.0 6.4 62.4
- 23. UNIT FORCED OUTAGE RATE _________________
0 0
6.4 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
7/4/86 i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-791 UNIT NAME Turkey raint Unit #4 DATE May 15. 1986 REPORT MONTH AprM, 1966 COMPLETED BY E_u. crn_ne Tft.EPHONE (305) 552-3675 J
"i E
.{ E 3
h Ei Lice iste E,
vt Oswee A Corre five N. *.
Ihte h
5g 4
2iE Innt y
g 'I Acti<m so fE e
jgg Rywt 8 mO Prevent Recurrence 6
^
02 860110 S
719 C
4
' RC FUELXX Unit #4 remained shutdown for refueling and scheduled maintenance.
I.
i
~
i 1
2 3
4 F Forced Reason Method:
Exhibit G -Instructions 5
Scheduled A Equi i Failure (Explaint I Mantal for Preparatism of Data R. Maintenance of Test 2%nual Scism.
Entry Sheets for Licensee C Refueling 3 Autematic Scram.
Event Repint (LER) File (NUREG-l D-Regulainty Restricta,n
$.Other (Explael 0161)
I.Operato, Training & Urense f xaminatii.n F. Adminiserative Y - C '** * * **
5 G Operatomal bene IF uplaini s _ to a Asewe.,..,#
Exhibit I - Same Source (9/77) 110theriE uplain)
SUMMARY
OF OPERATINC EXPER.TENCE DOCKET NO.
50-251 UNIT Turkey Point Unit #4 DATE May 15, 1986 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REP RT HONTH April, 1986 Unit #4 remained out of service for refueling and schedule maintenance.
)
e 1
AVER AGE DAILY UNIT P3CE A LE. VEL DOCKET NO. 3w UNIT St. Lucie Unit 1 DATE Lv 19-fora COMPLETED BY N.W. Grant TELEPHONE -(305)S52-3675 MONTH April, 1986 DAY AVERACE DAILY POWER LEVEL (MWe Net) 4/ 1/86 863 4/ 2/86 864 4/ 3/86 862 4/ 4/86 860 4/ 5/86 860 4/ 6/86 861 4/ 7/86 861 4/ 8/86 861 4/ 9/86 864 4/10/86 863 4/11/86 864 4/12/86 227 4/13/86 401 4/14/86 854 4/15/86 856 4/16/86 858 4/17/86 353 4/18/86 859 4/19/86 860 4/20/86 859 4/21/86 860 l
4/22/86 861 l
4/23/86 861 4/24/86 860 4/25/86 861 4/26/86 860 4/27/86 860 4/28/86 859 l
4/29/86 858 4/30/86 857 l
OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 5/13/86 COMPLETED BY N.
W.
GRANT TELEPHONE 305/552/3675 OPERATING STATUS 1.
UNIT NAME:
ST. LUCIE UNIT 1 2.
REPORTING PERIOD:
APRIL 1986
- 3. LICENSED THERMAL POWER (MWT):
2700 4.
NAMEPLATE RATING (GROSS MWE):
850 5.
DESIGN ELECTRICAL RATING (NET MWE):
830 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
872 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
827 8.
IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
i MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
719 2879 82031.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
714.2 2865.8 59021.8
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 205.3 14 HOURS GENERATOR ON-LINE _________________
693.3 2840.9 58643.0
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
39.3
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1862951 7604307 148496574
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH)
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 623410 2557740 48614245 592207 2431052 45864844 i
- 19. UNIT SERVICE FACTOR _____________________
96.4 98.7 71.5
- 20. UNIT AVAILABILITY FACTOR ________________
96.4 98.7 71.5
- 21. CAPt. CITY FACTOR (USING MDC NET) 99.6 102.1 70.1
- 22. CAPACITY FACTOR (USING DER NET) 99.2 101.7 68.6 2
S U DOW S L
DULED OVER OEkT 6 MOUTES i~
~
~ ~
~
(
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
UNIT SHUTDOWNS AND POWER REDUCTIONS NT NO.
50-335 UNIT NAME St. Lucie Unit #1 DATE May 15. 1986 REFORT MONTH April, 1986 N EY M-U-
U"""
TELEPHONE (305) 552-3675 i
n.
=
Licensee
{%
b.
Cause & Corrective
.I E 3
h Ek No.
Date
{
3$
25E Event
[?
Acthe to f'
$E E
~ fi g RePorI
- v5 O Prevent Recurrence
- i 6
i 02 860412 S
17.5 A
1 HC HTEXCH Unit shutdown to repair a condenser tube leak.
03 860413 F
8.25 G
3 LER-50-335 HB HTEXCH While returning the unit to service, 86-04 (at 17 % power) from the condenser j
tube leak repair, the unit auto-matically scrammed due to High Steam Generator level caused by a cognitive personnel error.
.i l'
F: Forced Reasim:
Method:
Exhibit G - Instructions l
2 3
4 S Scheduled A Equipenent Failure (Emplain) l-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatoc Scram.
Event Repori ILER) File (NUREG-D-Regulatory Restriction
$-Osher (Emplam) 0161) 1 EOperator Training & Ucense Fxaminatism I
i F Adrninistrative M ~ 0 **"* **
- 8*
5 I
Goperatismal Frror (Fsplaini
.s. 4 4.
A se w.w.,#
E shibit I - Same Source l'#f 77 )
II-Other (EaplainI l
~,
SU21 MARY OF OPERATING EXPER.TENCE DOCKET NO.
sn_,,s UNIT st. Lucie Unit #1 DATE May 15, 1986 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH Anril. 1986 See the " unit shutdowns and power reductions" report.
In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to PORV or safety valves during the report month.
AVERATE DAILY UNIT POWER LEVEL DOCKET NO. 50-389 UNIT St. Lucia finit 2 DATE Mav 15-1986 N.W. Grant COMPLETED BY (305)552-3676 TELEPHONE MONTH April, 1986 DAY AVER AGE DAILY POWER LEVEL (MWe Net) 4/ 1/86 833 4/ 2/86 333 4/ 3/86 315 4/ 4/86 803 4/ 5/86 683 4/ 6/86
_24 4/ 7/86 o
4/ 8/86
_3 4/ 9/86
-3 4/10/86
-3 4/11/86
-3 4/12/86
-3 4/13/86
_3 4/14/86
-3 4/15/86
-3 4/16/86
-3 4/17/86
-3 l
4/18/86
_3 4/19/86
_3 4/20/86
-3 4/21/86
_3 4/22/86
_3 4/23/86
-3 4/24/86
-3 4/25/86 o
4/26/86 o
4/27/86 o
4/28/86 o
4/29/86 o
4/30/86
-2
OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 5/13/86 COMPLETED BY N.
W.
GRANT TELEPHONE 305/552/3675 OPERATING STATUS h
- 1. UNIT NAME:
ST. LUCIE UNIT 2
- 2. REPORTING PERIOD:
APRIL 1986 3.
LICENSED THERMAL POWER (MWT):
2700 4.
NAMEPLATE RATING (GROSS MWE):
850
- 5. DESIGN ELECTRICAL RATING (NET MWE):
830
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
882
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
037 8.
IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
719 2879 23928.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
118.2 2244.1 20293.0
^
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE _________________
117.9 2224.7 19797.0
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
0
(
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 310321 5950433 50596966
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH)
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 100740 1988760 16895440 i
92881 1882830 15953873
- 19. UNIT SERVICE FACTOR _____________________
16.4 77.3 82.7
- 20. UNIT AVAILABILITY FACTOR ________________
16.4 77.3 82.7
- 21. CAPACITY FACTOR (USING MDC NET) 15.4 78.1 82.7
- 22. CAPACITY FACTOR (USING DER NET) 15.6 78.8 81.9 l
- 23. UNIT FORCED OUTAGE RATE _________________
0 2.3 9.9 i
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
5/24/86 l
i UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
mm UNIT NAME St. Lucie Uni _t #2 DATE Mav 15. 1956 COM EY 5 W Crne REPORT MONTH Anr41. ],9,86 TELEPHONE (305) 552-3675 l
E c
l
!?
3 E3 Licensee Eg g*.
Cause & Correceive j'&
N" Date
{
3g g
fy jg Event 1?
Ac+= to l
$E E
jdig Repist 8 mO Prevent Recurrence d
l 04 860405 S
602.1 C
1 RC FUELXX The unit shutdown for refueling and scheduled maintenance.
i l
i I
1 l
l j
I 1
}
I 2
3
'4 F Forced Reasem:
Method:
Exhibit G Instructions
% Stheduled A Equipment Failure (Explain) 1-Manual for Preparatitm of Data B-Maintenance or Test 2 Manuel Scram.
Entry Sheces for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restrictiim
%Other (Explain 1 0161) 1.-Operator Training & IAense Fuaminatiim F Administrative Y~ C'd""""
5 G Operatumal Ireur IFsplaini
- 4. 4.a. 4 sow
.el Eshibit I Same Source l
l'8/77) llother IE splaini 1
1 I
I
[
SUMMARY
OF OPERATINC EXPERIEMCE
+
DOCKET NO.
50-389 UNIT st. Lucie Unit #2 DATE May 15, 1986 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT HONTH April, 1986 Unit #2 was shutdown for refueling and scheduled maintenance.
In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to PORV or safety valves during the report month.
9 Y
t c
/
/
_ _ _ - -