ML20207D063

From kanterella
Jump to navigation Jump to search
Partially Withheld Notice of Violation from Insp on 880517-20 & 880526-0601.Violation Noted:Degradations of Vital Area Barriers
ML20207D063
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 08/02/1988
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20207D053 List:
References
50-213-88-12, EA-88-175, NUDOCS 8808150233
Download: ML20207D063 (2)


Text

.

NOTICE OF VIOLATION Connecticut Yankee Atomic Power Company Docket No. 50-213 Haddam Neck License No. OPR-61 EA 88-175 During an NRC special inspection conducted on May 17-20 and May 26 - June 1, 1988, NRC inspectors reviewed the circumstances associated with two examples of a violation of NRC requirements identified by the licensee. The violation involved degradations of vital area barrier:. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, (Enforcement Policy) (1988), the violation is set forth below:

License Condition 2.C(2)(7) to Facility Operating License DPR-61 requires the licensee to implement fully and maintain all provisions of the NRC-approved physical security; T115Pt.MGM plan ?!NS SMEGliAtM H CONF WFO:::! AT:Dt; ?.4315 f;37 FOR PUBLIC DISCLOSU EE, li lS illiElil'MI.MlY LEfi5!.fdiK.

10 CFR 73.2 defines building walls as pnysical carriers when openings in such walls are secured by grates, covers, or doors of sufficient strength such that the integrity of the wall is not lessened by the opening.

Contrary to the above, 1.

THIS Pfd'4"DT,?H MIlT?,iF5 SM.F.CUARDS WF0::"3.iK TA:15 iiOT FG9 PilBLIC 0!Sr.l.05UnE. IT is INTENT:0NM LY LEf T BLT,UK.

2.

This is a Severity level IV violation. (Supplernent IV)

Pursuant to the provisions of 10 CFR 2.201, Connecticut Yankee Atomic Power Company is hereby required to submit a written statement or explanation to this of fice, with a copy to the Director of Enforcement, the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555, within 30 days of the date of the letter transmitting this Notice. This reply should be clearly marked as a "Reply to a Notice of Violation" and should 8808150233 080803 PDR ADOCK 05000213 G PNU

+ 2 s

include for each violation: (1) the reason (s)' for the violation if admitted, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid furthar violations, and (4) the date when full compliance will be achieved. Consideration may be given to extending the response time for good cause shown.

FOR THE NUCLEAR REGULATORY COMMISSION Ori Binal Signed Byg William F. Kane, Director  ;

Division of Reactor Projects '

Dated at King of Prussia, Pennsylvania this gZe%# day of August 1988 l l

1 l

l OFFICIAL RECORD COPY PfJP L4 HN - 0007.0.0 08/02/88

. . -.- . - . . . , ... . , - . -