AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-245 UNIT Millstone 1 _
DATE 860506 COMPLETED BY G. Newburgh I
TELEPHONE (203)447-1791 Ext. 4400 MONTH April 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 2 1
599 17 659 2
658 18 658 3
659 19 585 i
4 658 20 658 5
629 21 659 i
6 659 22 659 7
660 23 659 8
658 24 659 9
659 25 659 10 658 26 659 11 659 27 660 12 543 28 659 13 659 29 659 14 659 30 638 15 658 31 N/A 16 659 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
B607210387 860430
\\,
PDR ADOCK 05000245
/
4 R
PDR y
OPERATING DATA REPORT ggg DOCKET NO.
50-245 DATE 860506 COMPLETED BY G. Newburgh TELEPHONE (203)447-1791 Ext. 4400 OPERATING STATUS 1.
Unit Name: Millstone Unit 1 Notes 2.
Reporting Period: April 1986 3.
Licensed Thermal Power (MWt): 2011 4.
Nameplate Rating (Gross MWe): 662 5.
Design Electrical Rating (Net MWe): 660 6.
Maximum Dependable Capacity (Gross MWe): 684 7.
Maximum Dependable Capacity (Net MWe): 654 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe): N/A 10.
Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 720 2880 135168 12.
Number Of Hours Reactor Was Critical 720 2845.3 103924.1 13.
Reactor Reserve Shutdown Hours 0
0 2834.5 14.
Hours Generator On-Line 720 2838.7 101027.9 15.
Unit Reserve Shutdown Hours 0
0 93.7 16.
Gross Thermal Energy Generated (MWH) 1423115 5636653 186250851 17.
Gross Elec. Energy Generated (MWH) 487300 1932500 62633796 18.
Net Electrical Energy Generated (MWH) 466371 1849019 59738791 19.
Unit Service Factor 100 98.6 74.7 20.
Unit Availability Factor 100 98.6 74.8
- 21. Unit Capacity Factor (Using MDC Net) 99.0 98.2 67.6 22.
Unit Capacity Factor (Using DER Net) 98.1 97.3 67.0 23.
Unit Forced Outage Rate 0
- 1. 4 12.1 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A 25.
If Shut Down At End Of Report Period, Estimated Date of Startup: N/A 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION 1
DOCKET NO.
50-245 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT'NAME Millstone 1 DATE 860506 COMPLETED BY G. Newburgh REPORT MONTH April 1986 TELEPHONE (203)447-1791 Ext. 4400 l
2 No.
Date Type Duration Reason Method of Licensee Systeg Compogent Cause & Corrective (Hours)
Shutting Event Code Code Action to 3
Down Reactor Report #
Prevent Recurrence
+-------------------------------------------------------N/A------------------------------------------------------+
1 2
3 4
F:
Forced Reason:
Method:
Exhibit G - Instructions S:
Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or-Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event neport (LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161)
E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction 5
G-Operational Error (Explain)
(Duration = 0)
Exhibit 1 - Same Source H-Other (Explain) 6-Other (Explain)
REFUELING INFORMATION REQUEST 1.
Name of facility:
Millstone 1
-2.
Scheduled date for next refueling shutdown:
May 1987 3.
Schedule date for restart following refueling: August 1987 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes, Technical Specification Changes Regarding:
(1) Maximum Average Planar Linear Heat Generating Rate (2) Maximum Critical Power Ratio 5.
Scheduled date(s) for submitting licensing action and supporting information:
Spring 1987 6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
200 GE8B Fuel Assemblies 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) In Core: (a) 580 (b) 1536 8.
The present licensed spent fuel pool storage capacity and th? size of any increase in licensed storage capacity that has been requested
'~
or is planned, in number of fuel assemblies:
2184 Assemblies 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1987, Spent Fuel Pool Full Core Off Load Capability is Reached.
1991, Core Full, Spent Fuel Pool Contains 2146 Bundles.
O
- NdRTHEAST t#TILITIES "ic'" S*'* S""' 8""a coaaaa' x ca.ecTen to.e wo== w" P.O. BOX 270 E,$
s'7 ~~
HARTFORD. CONNECTICUT 06141-0270 (203) 666-69 M
%Z' *
""Z,",*j j
L L
J May 13, 1986 MP-9057 Director, Office of Resource Management 1
U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Reference:
Provisional License DPR-21 Docket No. 50-245
Dear Sir:
In accordance with Millstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating data report for Millstone Unit 1 is enclosed.
One additional copy of the report is enclosed.
i Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY l
/d 0,&
W. D. Romb rg Station Superintendent Millstone Nuclear Power Station WDR/GSN:jlm
Enclosures:
(
)