NRC MONTHLY OPERATING REPORT DOCKET NO.
30-gg9
)
UNIT NAME PMNgg-g i
DATE Ogl@@f@6 COMPLETED BY J. M BgnBdgil
_t TELEPHONE 60g-93g-g300 Estu @pg3 DeEgeIINg gIeIUS 1.
Unit Names Pglg Mende byglegt QEDECaliDR 61A1190s W011 @
2.
Reporting Periodsegril ig@@
3.
Licensed Thermal Power (MWt): 3@@0 4.
Nameplate Rat ing (Gross MWe) : 1403 5.
Design Electrical Rating (Net MWe):
iggi 6.
Maximum Dependable Capacity (Gross MWe) : Tg bg dgtgtmingd 7.
Maximum Dependable Capacity (Net MWe):
Ig bg ggigtmingd 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons __
DER WAS ADJUSTED TO REFLECT THE LICENSED THERMAL POWER 9.
Power Level To Which Restricted, If Any.(Net MWe): _NONE
- 10. Reasons For Restrictions, If Any:
__ Granted Full Power License April 23, 1986______________
This Month Yr.-to-Date Cumulativa
- 11. Hours In Reporting Period
__297.25__
__297.25_
_3945.25_
- 12. Number Of Hours Reactor Was Critical
___98.9___
__98.9___
__98.9___
- 13. Reactor Reserve Shutdown Hours
_____0____
____0_
_0____
- 14. Hours Generator On-Line
_____0____
____0____
____0____
- 15. Unit Reserve Shutdown Hours
_____0
____0____
____0____
- 16. Gross Thermal Energy Generated
_____0____
____0____
____0____
(MWH)
- 17. Gross Electrical Energy Generated
_____0____
_____0_
____0____
(MWH)
- 18. Net Electrical Energy Generated
__0____
_____0____
____0____
(MWH)
- 19. Unit Service Factor
____N/A___
____N/A___
___N/A___
- 20. Unit Availability Factor N/A___
____N/A___
___N/A___
- 21. Unit Capacity Factor (Using MDC
____N/A___
____N/A___
___N/A___
Net)
- 22. Unit Capacity Factor (Using DER
____N/A___
____N/A___
___N/A___
Net)
- 23. Unit Forced Outage Rate
____N/A___
____N/A___
___N/A___
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):__N2 EiDDif1EOD1 9Mieng glagngg gniil gfigt WRCraDAY CMG
=-
- 25. If Shutdown At End Of Report Period, Estimated Date of Startup _N/A__
j
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved i
INITIAL CRITICALITY 3/86 4/18/86 INITIAL ELECTRICITY
___6/86_____
COMMERCIAL OPERATION
__11/86_____
8607210384 860430 PDR ADOCK 05000529
/h R
PDH l
~.
k 1
AVERAGE DAILY UNIT-POWER LEVEL-DOCKET NO.
5_0_ _-5 2_ _9_
UNIT ______P__VN_G__S-g________
D A T E_ ___ _ _0 5_ _/ 0 8_/ 8 %___ __ _ __
COMPLETED BY_J M Bathdgil t t TELEPHONE _60g--23g-5309
_' E_x t_r 6_293_____
MQNTH:
April 1986 DAY AVERAGE DAILY POWER LEVEL
' DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
=
0--
1 7 _ _ _ = ---
- 0
- = - -
2
_ _0 _ _
18 ____-__
0 3
0=
- - - - = _ _
1 9 _ _ __ = _--
__0_____________
4
= _ _ _ - - -
20 0
= - _ _ _ _ - _ = - - -
_-0_
5 0___=
=__--
21
=-0_____________
6
_____0 22 _
_____0__-________-_
7
= - -
_=__-_0- -. _
23 ________--__0________
8
________0_____----=----
24 0
9
____________0___.
25 ____________0_____________
10
=
_0_______--____
26 0
e 11 - - -
= _____________
0 27 ____________0_____________
12 0
- =_=_-____
28 ____________0___________-_
1 i
13 --
-_______0-29 --________ _0_____________
14 0
30 0
.i i
I 15 __-__-____ _0_____________
16
___-___0____________-
4 a
a l
I
REFUELING INFORMATION DOCKET NO._g0-gg9__________
UNIT
___PVNG@-g_____
0 DATE
__..- __@540@l0@_____
COMPLETED BY_J M gathdoll t s TELEPHONE __@@@-2@@-5@@0
__Ent 652a_______
t 1.
Scheduled date for next refueling shutdown.
01/02/88 2.
Scheduled date for restart following refueling.
02/20/88 3.
Will refueling or resumption of operation thereafter require a Technical Specificatior change or other license amendment?
Not Yet Determined What will these be?
Not Yet Determined 4.
Schaduled date for submitting proposed licensing action and supporting information.
Not Yet Determined 5.
Important Licensing considerations associated with refueling,
- e. g.
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operat ing procedures.
Not Yet Determined-6.
The number of fuel assemblies.
a) In the core._g41___________
b) In the spent - fuel storage pool._____0_______
7.
Licensed spent fuel storage capacity.____13g2______
Intended change in spent fuel storage capacity.__None______
8.
Projected date of last refueling that can be discharged to s pent fuel storage pool assuming present capacity.
2003 (w/ annual reloads and full core discharge capability).
I 1
1
1 Eummegy gE geEB8IING EXEggigNCE EQB ISE MQUIU DOCKET NO.___Q@-gg9 UNIT _________EMNQE-g_
DATE_________@Ml@@L@@_________
t COMPLETED BY_Jude @gthggil____
TELEPHONE __6@g-9]C-5}@@_______
__Ents ED2a__________
i 04/01 0000 Plant in Mode 3.
04/15 2045 Entered Mode 4 due to cooldown to repair #1 SG blowdown sample line leak.
04/16 0627 Entered Mode 5.
04/16 1732 Entered Mode 4.
04/17 1520 Entered Mode 3.
04/18 1445 Unit II reactor declared critical for first time Unit II in Mode 2.
04/18 1515 Stabilized reactor power at 10-4 % power for Low Power Physics Test Data.
04/22 0920 Raised reactor power to 3%.
04/22 1739 Entered Mode 3 to allow inspection on BOP /ESFAS modules.
04/30 0501 Entered Mode 4.
04/30 1642 Entered Mode 5.
Arizona Nuclear Power Project P.O. Box 52034
- PHOENIX, ARIZONA 85072-2034 May 14, 1986 ANPP-36586-EEVB/PGN/98.05 Mr. Ronald M.
Scroggins, Director Office of Resource management U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 2 Docket No. STN 50-529 (License NPF-51)
April Monthly Operating Report File: 86-024-404
Dear Mr. Scroggins:
Attached please find the April,1986, Monthly Operating Report prepared and sub-mitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Unit 2 Operating License. By copy of this letter, we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V office.
If you have any questions, please contact me.
Very truly yours, i
9 9.
cm nJJ E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/PGN/rw Attachment cc:
J. B. Martin (all w/a)
R. P. Zimmerman E. A. Licitra A. C. Gehr INPO Records Center r f D 'I lh
-