Monthly Operating Rept for Apr 1986
ML20207C506
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/30/1986
From: Barkdoll J, Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Scroggins R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ANPP-36586-EEVB, NUDOCS 8607210384
Download: ML20207C506 (5)


Text

_ _ _ _ - _ _ _ _ _ _ _

NRC MONTHLY OPERATING REPORT DOCKET NO.

30-gg9

)

UNIT NAME PMNgg-g i

DATE Ogl@@f@6 COMPLETED BY J. M BgnBdgil

_t TELEPHONE 60g-93g-g300 Estu @pg3 DeEgeIINg gIeIUS 1.

Unit Names Pglg Mende byglegt QEDECaliDR 61A1190s W011 @

2.

Reporting Periodsegril ig@@

3.

Licensed Thermal Power (MWt): 3@@0 4.

Nameplate Rat ing (Gross MWe) : 1403 5.

Design Electrical Rating (Net MWe):

iggi 6.

Maximum Dependable Capacity (Gross MWe) : Tg bg dgtgtmingd 7.

Maximum Dependable Capacity (Net MWe):

Ig bg ggigtmingd 8.

If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons __

DER WAS ADJUSTED TO REFLECT THE LICENSED THERMAL POWER 9.

Power Level To Which Restricted, If Any.(Net MWe): _NONE

10. Reasons For Restrictions, If Any:

__ Granted Full Power License April 23, 1986______________

This Month Yr.-to-Date Cumulativa

11. Hours In Reporting Period

__297.25__

__297.25_

_3945.25_

12. Number Of Hours Reactor Was Critical

___98.9___

__98.9___

__98.9___

13. Reactor Reserve Shutdown Hours

_____0____

____0_

_0____

14. Hours Generator On-Line

_____0____

____0____

____0____

15. Unit Reserve Shutdown Hours

_____0

____0____

____0____

16. Gross Thermal Energy Generated

_____0____

____0____

____0____

(MWH)

17. Gross Electrical Energy Generated

_____0____

_____0_

____0____

(MWH)

18. Net Electrical Energy Generated

__0____

_____0____

____0____

(MWH)

19. Unit Service Factor

____N/A___

____N/A___

___N/A___

20. Unit Availability Factor N/A___

____N/A___

___N/A___

21. Unit Capacity Factor (Using MDC

____N/A___

____N/A___

___N/A___

Net)

22. Unit Capacity Factor (Using DER

____N/A___

____N/A___

___N/A___

Net)

23. Unit Forced Outage Rate

____N/A___

____N/A___

___N/A___

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):__N2 EiDDif1EOD1 9Mieng glagngg gniil gfigt WRCraDAY CMG

=-

25. If Shutdown At End Of Report Period, Estimated Date of Startup _N/A__

j

26. Units In Test Status (Prior To Commercial Operation):

Forecast Achieved i

INITIAL CRITICALITY 3/86 4/18/86 INITIAL ELECTRICITY

___6/86_____

COMMERCIAL OPERATION

__11/86_____

8607210384 860430 PDR ADOCK 05000529

/h R

PDH l

~.

k 1

AVERAGE DAILY UNIT-POWER LEVEL-DOCKET NO.

5_0_ _-5 2_ _9_

UNIT ______P__VN_G__S-g________

D A T E_ ___ _ _0 5_ _/ 0 8_/ 8 %___ __ _ __

COMPLETED BY_J M Bathdgil t t TELEPHONE _60g--23g-5309

_' E_x t_r 6_293_____

MQNTH:

April 1986 DAY AVERAGE DAILY POWER LEVEL

' DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1

=

0--

1 7 _ _ _ = ---

- 0

- = - -

2

_ _0 _ _

18 ____-__

0 3

0=

- - - - = _ _

1 9 _ _ __ = _--

__0_____________

4

= _ _ _ - - -

20 0

= - _ _ _ _ - _ = - - -

_-0_

5 0___=

=__--

21

=-0_____________

6


_____0 22 _

_____0__-________-_

7

= - -

_=__-_0- -. _

23 ________--__0________

8

________0_____----=----

24 0

9

____________0___.

25 ____________0_____________

10

=

_0_______--____

26 0

e 11 - - -

= _____________

0 27 ____________0_____________

12 0

- =_=_-____

28 ____________0___________-_

1 i

13 --

-_______0-29 --________ _0_____________

14 0

30 0

.i i

I 15 __-__-____ _0_____________

16

___-___0____________-

4 a

a l

I

REFUELING INFORMATION DOCKET NO._g0-gg9__________

UNIT

___PVNG@-g_____

0 DATE

__..- __@540@l0@_____

COMPLETED BY_J M gathdoll t s TELEPHONE __@@@-2@@-5@@0

__Ent 652a_______

t 1.

Scheduled date for next refueling shutdown.

01/02/88 2.

Scheduled date for restart following refueling.

02/20/88 3.

Will refueling or resumption of operation thereafter require a Technical Specificatior change or other license amendment?

Not Yet Determined What will these be?

Not Yet Determined 4.

Schaduled date for submitting proposed licensing action and supporting information.

Not Yet Determined 5.

Important Licensing considerations associated with refueling,

e. g.

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operat ing procedures.

Not Yet Determined-6.

The number of fuel assemblies.

a) In the core._g41___________

b) In the spent - fuel storage pool._____0_______

7.

Licensed spent fuel storage capacity.____13g2______

Intended change in spent fuel storage capacity.__None______

8.

Projected date of last refueling that can be discharged to s pent fuel storage pool assuming present capacity.

2003 (w/ annual reloads and full core discharge capability).

I 1

1

1 Eummegy gE geEB8IING EXEggigNCE EQB ISE MQUIU DOCKET NO.___Q@-gg9 UNIT _________EMNQE-g_

DATE_________@Ml@@L@@_________

t COMPLETED BY_Jude @gthggil____

TELEPHONE __6@g-9]C-5}@@_______

__Ents ED2a__________

i 04/01 0000 Plant in Mode 3.

04/15 2045 Entered Mode 4 due to cooldown to repair #1 SG blowdown sample line leak.

04/16 0627 Entered Mode 5.

04/16 1732 Entered Mode 4.

04/17 1520 Entered Mode 3.

04/18 1445 Unit II reactor declared critical for first time Unit II in Mode 2.

04/18 1515 Stabilized reactor power at 10-4 % power for Low Power Physics Test Data.

04/22 0920 Raised reactor power to 3%.

04/22 1739 Entered Mode 3 to allow inspection on BOP /ESFAS modules.

04/30 0501 Entered Mode 4.

04/30 1642 Entered Mode 5.

Arizona Nuclear Power Project P.O. Box 52034

Scroggins, Director Office of Resource management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Docket No. STN 50-529 (License NPF-51)

April Monthly Operating Report File: 86-024-404

Dear Mr. Scroggins:

Attached please find the April,1986, Monthly Operating Report prepared and sub-mitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Unit 2 Operating License. By copy of this letter, we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V office.

If you have any questions, please contact me.

Very truly yours, i

9 9.

cm nJJ E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/PGN/rw Attachment cc:

J. B. Martin (all w/a)