NARRATIVE
SUMMARY
OF MONTHLY OPERATING EXPERIENCE APRIL 1986 April 1 The Station was in Operational Mode 1 with reactor through power at a nominal 100 percent with the Reactor April 8 Coolant System at a normal operating pressure and temperature.
April 9 A power reduction to approximately 27 percent began through at 0655 hours0.00758 days <br />0.182 hours <br />0.00108 weeks <br />2.492275e-4 months <br /> on the 9th to perform maintenance on April 11 the."B" Main Feedwater Regulating Valve. Maintenance completed at 1410 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.36505e-4 months <br /> on the 10th.
A power acension to 45 percent began at 1445 hours0.0167 days <br />0.401 hours <br />0.00239 weeks <br />5.498225e-4 months <br /> on the 10th. Power level was held steady at 45 percent to clear penalty minutes accumulated for being out of the Delta Flux Target Band. The penalty minutes were cleared at 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> on the lith and power level was subsequently returned to a nominal 100 percent.
April 12 The Station was in Operational Mode 1 with reactor through power at a nominal 100 percent with the Reactor Coolant April 21 System at normal operating pressure and temperature.
April 22 At 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> on the 22nd, the reactor reached its through nominal end-of-life.
Power production will April 30 continue, by a gradual power coastdown, until the Station is shutdown for refueling.
The Station was in Operational fiode 1 with reactor coolant system at normal operating pressure and temperature.
I 8607210306 860430 S E94 PDR ADOCK 05000334 1
H PDR I II l
OPERATING DATA REPORT DOCKET NO.:
50-334 REPORT DATE:
05/05/86 COMPLETED BY: R.N. Boyle TELEPHONE:
(412) 643-1825 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY FOWEP. STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: APRIL 1986
- 3. LICENSED THERMAL POWER (MWe):
2660
- 4. NAMEPIATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): '
810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD:
719.0 2879.0 87647.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
719.0 2835.6 48436.6
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
719.0 2834.3 46969.1
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1776190.0 7224588.0 110248019.1
- 17. GROSS ELECT. ENERGY GEN. (MWH):
578940.0 2364120.0 35145520.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
545300.0 2232190.0 32758493.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 98.4 56.1
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 98.4 56.1
- 22. UNIT CAPACITY FACTOR (DER): PCT 90.8 92.9 48.3
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 1.6 22.8
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
Fifth Refueline. May 16. 1986. Scheduled 93 Days
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
\\
AVERAGE DAILY UNIT POWER LEVEL DOCXZT NO.30-334 UNIT 3*'? S 'J:'.1 i '.
5/7/86 DATE CDMP!.ETED SY R. N. Boyle TELEPHONE GI.2) 543 1825 APRIL MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL iMWe Net) iMWe-NetI 808 800 g
17 813 813 gg 813 808 3
19 813 4
20 800 813 g
21 817 817 817 3
22 813 796 7
23 817 800 3
- 4 9
442 23 788 10 208 775 26 500 738 y
800 g
23 754 13 808 763
- 9 808 750 g4 30 808 i
I$
31 825 16 I
1 INSTRUCTIONS On this rurmat.!ist the avenge d:ily unit puwer Ic.d in MWe. Net Or each day in the repocrine monrh. Compute to the nestest whole megawatt.
19./77)
UNIT SHUIDOWNS AND POWER REDUCTIONS DOCKET NO.
50-314 UNIT NAME BVPS Unit #1 DATE May 6, 1986 APRIL REPOR T MONlli COMPLETED BY R. N.
Boyle TELErt10NE (412) 643-1825 m
h cn
- +4 60 0 0,
0t Licensee 4
a ei 0
Cause, & Corrective g
4 No.
Date "o
y8 3U2 Event 0m 5$
Action to R
6 $"
Report #
$3 f0 Prevent Recurrence H
a M
QwG NU u
o A
5 860409 F
0 B
5 N/A CH VALVEX Power level was reduced so that maintenance could be performed on Main Feedwater Flow Control Valve (FCV-FW-488).
Repairs complete at 1410 on the 10th.
Power level returned to a nominal 100 percent on the lith.
4 i
I 1
2 3
4 F: F.u ed Reasim:
Hethod:
1.shabi1 G - Inss ens sii.ns S' Stheslu!cd A Equipment Failueell uplJini 1-Manual l'un Psepasasi.m os Data B Maintenance ei Test 2-Manual Scree 1 nas) Sheels I.n I Acuscc C-Refueling 3-Automatic Scras Fsens Regwus e t i NII de iNilHI G D Regulatin) Resssicti'*
4-Continued From Frevious Month Olbli 1 Opesains Tsainseig A 1.itense I sansenati'*
5-Iteouc tion
- 1. Adensnisleasive 9-Other 5
G Opetaliensal I seus ll mplain t I sinhH I SJmr'Nunse l'8/771 11 Oshes flNplaint s.
MAJOR MAINTENANCE 1.
Maintenance of Main Feedwater Regulating Valve (FW-FCV-488)
?
s
'Ab5 Telephone (412) 393-6000 Nuclear Group P.O. Box 4 Shippingport, PA 15077-0004 May 7, 1986 Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Monthly Operating Report U. S. Nuclear Regulatory Commission Director, Office of Management Information & Program Control Washington, D. C. 20555 Gentlemen:
In accorda nce with Appendix A,
Technical Specifications, the Monthly Operating Report is submitted for the month of April,1986.
Very truly yours,
/
J. J. Carey Vice President Nuclear Group TW Enclosures cc: NRC Regional Office King of Prussia, PA 4 >$