Monthly Operating Rept for Apr 1986
ML20207C214
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/30/1986
From: Barkdoll J, Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Scroggins R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ANPP-36585-EEVB, NUDOCS 8607210294
Download: ML20207C214 (5)


Text

_ _ _

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-g@@

UNIT NAME PMNE@-1 DATE Og40@l@@

COMPLETED BY JuM t @achdoll TELEPHONE 60@-@33-9300

, Estu 6:23 OEER911NE SIBIU@

1. Unit Name Palo Mgede Nyg1 gat Ggngrating Statignu Unit 1
2. Reporting Period:9oril 19@6
3. Licensed Thermal Power (MWt): .3@00
4. Nameplate Rat ing (Gross MWe) : 1403
5. Design Electrical Rating (Net MWe): 1221
6. Maximum Decendable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe) : 12@l
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:__ _____________

DER WAS ADJUSTED TO REFLECT THE LICENSED THERMAL POWER

9. Power Level To Which Restricted, If Any (Net MWe):_NONE_ _ _ _ _
10. Reasons For Restrictions, If Any: ____ _ __

______ _ _ _ - - - - - - - - - - - - - - - == ------ _- _-------

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period ____720___ __1848___ __1848___
12. Number Of Hours Reactor Was i Critical _ _ __0____ ___547___ ___547___
13. Reactor Reserve Shutdown Hours _____0 ____0 _ ____0____
14. Hours Generator On-Line _____0____ ___547___ ___547___
15. Unit Reserve Shutdown Hours _____0____ ____0____ ____0____
16. Gross Thermal Energy Generated ____0.0___ 2,012,800 2,012,803 (MWH)
17. Gross Electrical Energy Generated _____0____ __689,400_ _689,400_

(MWH)

18. Net Electrical Energy Generated _____0____ __642,752_ _642,752_

(MWH)

19. Unit Service Factor .0.00%__ ___29.60__ __29.60__
20. Unit Availability Factor ___0.00%__ ___29.60__ __29.60__
21. Unit Capacity Factor (Using MDC ___0.00%__ ___28.49__ __28.49__

Net)

22. Unit Capacity Factor (Using DER ___0.00%__ ___28.49__ __28.49__

Net)

23. Unit Forced Outage Rate _____0____ _____0____ _ _ _ _0 __
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): __@grygillangg Igst Ogiggg : 34Q@t d@ days ______
25. If Shutdown At End Of Report Period, Estimated Date of Startup _5/86_
26. Units In Test Status (Prior To Commercial Doeration):

Forecast Achieved INITIAL CRITICALITY ___5/85_____ ___5/25/85___

INITIAL ELECTRICITY ___6/85_____ ___6/10/85___

COMMERCIAL OPERATION __11/85_ ___2/13/86___ l l

i D D  !

hhhhhh28 )EG PDH l i

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50_-528 __----

PVNGS-UNIT --_-_-------_1----_---

DATE ----_ - _5_0_/ 0 8_ _/ _8 6_ _-- _ ---

COMPLETED BY - J__.M.-- -- _Bar

_k d_- o_l _l TELEPHONE -_02_ 6_ _ _932_ - _-5_3_00__

--_xt.

E --

6

__5_93_----

MONT_H:

Aoril 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 -_--------- --------___--- 0 17 --___0___-_-_-------

2 ------_---- -____----____-0 18 -______---_0 - _____-_------

3 ---- -_- --

0 --_----__ 19 ---_-----__0 ---__-------__

4 ___0 --------__---- 20 ----------- _______----___ 0 5 0

_---___- ____-_____---_ 21 --_-___---_0________-_____

6 _-_-- 0_------__----- 22 __------__ 0_------_----__

7 --_---_____0 --_---______-- 23 __--____-- 0 _-_-_-_ - _--

8 -_-----___- _-___---_--___

0 24 ____-_-_-__0 --_-----____-_

9 ___--_--___0== --_______ 25 _----__--- 0 ----_--_-_----

10 ____0 - ___---------_ 26 - _ _ . --__0 ---___--------

11 --_----___- ---------_---_0 27 ----------- -----__--___--

0 12 ==

0

-- --------__---- 28 ------__--- ---------_---- 0 13 _ 0


----------_--- 29 --------___0 ---__-------__

14 _=__0 - __-- __---- 30 _----_----_0 ----_---------

15 ----___---- ___--. 0 ____-_-

16 ____----___0 - _-__-_-_---__

l l

I l

REFUELING INFORMATION DOCKET NO._50-gg@__________

UNIT _______PyNGS-1_____

DATE_______0@l0@l@@_____

COMPLETED BY_JtMt Bathdgli i

TELEPHONE __60@-232-5300____

__Entu 6g23_______

1. Scheduled date for next refueling shutdown.

< 03/13/87

2. Scheduled date for restart following refueling.

04/19/87

3. Will refueling or resumotion of operation thereafter require a Technical Soecification change or other license amendment?

Not Yet Determined What will these be?

I Not Yet Determined

4. Scheduled date for submitting proposed licensing action and 2

supporting information.

} Not Yet Determined

5. Important Licensing considerations associated with refueling,
e. g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

f Not Yet Determined

6. The number of fuel assemblies.

a) In the core._g41_ _ _____

b) In the spent fuel storage pool.___ O_______

7. Licensed spent fuel storage capacity.____13g9_ . _ _

Intended change in spent fuel storage capacity.__Ngne __

4

8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2002 (w/ annual reloads and full core discharge capability).

I 1

4 k

..,,.,..m._,,. , , , _ . , . _ , , . . . , , . , , _ , , . . . , _ , . . , , , _ ,

l

'o l

\

1 1

SU_MM A_RY_ O_F QPE__R_AT__I _NG_ E_X P_E_R_I

_ ___ _ _ _ E_NC_E_ __ F_O__R TbE MONT__H D O C K E T N O . _ _ _ 5 0_ - 5 _2 8_ _ _ _ _ _ _ _ _ _ _ _

UN I T__ _ _ ___ _ _P__VN_G_ S __ _1_____ __ ___

D AT E_ _ __ _ ____0_5_/ 0_8_/ g 6___ _ _ _ _ _ _

COMPLETED BY_JtM u garhgoll____

TELEPHONE __60g-2]g-gge0_______

__Ent t 552g__________

04/01 0000 Plant in Mode 5 - Continuing Plant Outage.

l l

\

1 l 1 I I 1

i t

i

(

n Arizona Nuclear Power Project P.o. BOX 52034 e PHOENIX, ARIZONA 85072-2034 May 14, 1986 ANPP-36585-EEVB/PGN/98.05 Mr. Ronald M. Scroggins, Director Office of Resource Management U.S. Nuclear Regulatory Commission k'ashington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No. STN 50-528 (License NPF-41)

April Monthly Operating Report File: 86-024-404

Dear Mr. Scroggins:

Attached please find the April,1986, Monthly Operating Report prepared and sub-mitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Unit 1 Operating License. By copy of this letter, we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V office.

If you have any questions, please contact me.

Very truly yours,

/

-~

Q L C( M %LL p E. E. Van Brunt, Jr Executive Vice President Project Director EEVB/PGN/rw Attachments cc: J. B. Martin (all w/a)

R. P. Zimmerman E. A. Licitra A. C. Gehr INP0 Records Center hgY y

- -