ML20207C202
| ML20207C202 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 04/30/1986 |
| From: | Hutchison L, Powers C WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| NUDOCS 8607210289 | |
| Download: ML20207C202 (4) | |
Text
r V
OPERATING DATA REPORT l
WNP-2 01-May-86 1.
DOCKET: 50-397 2.
REPORTING PERIOD:
Apr-86 OUTAGE + ON-LINE HOURS 719 3.
UTILITY CONTACT:
LEONARD HUTCHISON (509) 377-2486 l
l 4.
LICENSED THERMAL POWER (MWt):
3320 l
5.
NAMEPLATE RATING (GROSS MWe):
1200.1 i
6.
DESIGN ELECTRICAL RATING (NET MWe):
1100 7.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1140 l
8.
MAXIMUM DEPENDABLE CAPACITY (NET MWe):
1O95 l
l 9.
IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE. REASONS.
l
--__-------_ _N_O_N E
_---__----------------------_-=___
= _ _ = _ - _ _
I
_-------_-___-----__________----------=_
---=
- - - _ = _ - - -
- 10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):
l
- 11. REASONS FOR RESTRICTIONS, IF ANY:
__l10NE________________________________
l
=___--
_= ___-_-__
MONTH YEAR CUMULATIVE
- 12. REPORT PERIOD HOURS 719 2879 12079.2
- 13. HOURS REACTOR CRITICAL O.O 1779.4 9095.5
- 14. RX RESERVE SHTDWN HRS 0.0 340.4 340.4 I
- 15. HRS GENERATOR ON LINE O.0 1738.1 8764.5
- 16. UNIT RESERVE SHUTDOWN HOURS O.0 381.7 381.7
- 17. GROSS THERMAL ENERGY (MWH)
O 3877530 21441810
- 18. GROSS ELECTRICAL ENERGY (MWH)
O 1275780 7099030
- 19. NET ELECTRICAL ENERGY (MWH) 0 1223978 6810751
- 20. UNIT SERVICE FACTOR O.0%
60.4%
72.6%
- 21. UNIT AVAILABILITY FACTOR O.0%
73.6%
75.7%
- 22. UNIT CAPACITY FACTOR (MDC NET) 0.0%
38.8%
51.5%
- 23. UNIT CAPACITY FACTOR (DER NET) 0.0%
38.6%
51.3%
l 24. UNIT FORCED OUTAGE RATE O.0%
0.9%
8.4%
l 25. FORCED OUTAGE HOURS O.0 16.2 801.2
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE,DATE, DURATION):
l
-- - _---- JHLNE _ --- ----- _ _ _ _ --- _ --- _
1 27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
__jl30]81__
l l
8607210289 960430 1b PDR ADOCK 050003?7
/
l ll/l U
1 PDH l
l
______________._______.____.__._J
i e*
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-397 UNIT WNP-2 DATE Sn/86 COMPLETED BY LB Hutchison TEMPHOE (509)277-2486 MONTH APRIL 1986 l
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
37 g
2 0
0 ja 3
0 19
)
4 0
0 3
5 0
0 3
6 0
a 0
7 0
0 3
1 8
0 24 0
g 0
o g
10 n
26 0
0 11 27 0
12 0
0 3
13 0
gg.
0 14 0
m n
15 0
16 0
INSTRUCTIONS On this form, list the awrage daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
These Sgures wdl be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the not electrical rating of the unit, there may be occasions when the dady average power level exceeds the 100% line (or the restricted power level line). In such cases, the average dady unit power output sheet should be footnoted to explam the apparent anomaly.
DOCKET NO.
50-397 tilIT NN1E WNP-2 DATE c; f1 f pr; li1IT SlHTDOWNS / REDUCTIONS COMPLETED BY LB Hutchison REIXRT PERIOD APRIL 19 86 TELEPIONE (509)377-2486
- month, yHr
. NO.
ITAT wit 110UltS REASON HETil00 LER nut 0ER SYSIEN C(t1PONENT CAUSE & COllRECTIVE ACTJON 10 filEVENI flECUllRENCE 86-03 3/31/86 C 720.0 C
9 REFUELING / MAINTENANCE OUTAGE CONTINUES
)
l I
l St#f!ARY l WNP-2 REMAINS SHUTDOWN FOR REFUELING AND MAINTENANCE TYPE REASON METHOD SYSTEM & ('OMP0 TENT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & il S-Sched 0-Maint or Test G-Oper Error 2-Manual Scram Instruction.s for i
C-Refueling Il-Other 3-Auto Scram Preparation of i
D-RcDulatory Restriction 4-Contirued Data Entry Sheet
[
E-Operator Training 5-Reduced Load Licensee Event Report j
& License Examination 9-Other (LER) File (NUREG-0161)
=
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968
- 3000 George \\Yashington \\ Yay
- Richland, \\Yasluington 99352 May 6, 1986 Docket No.
50-397 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
Subject:
NUCLEAR PLANT N0. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for April 1986 as required by our Technical Specifications 6.9.1.6.
Very truly yours, h?lhWww C. M. Powers (M/D 927M)
WNP-2 Plant Manager CMP /lc Enclosure cc: Mr. John B. Martin -
NRC, Region V NRC Site Representative Ms. Dottie Sherman -
ANI, Farmington CT Mr. J. T. Wheelock -
INP0 Ig'>N l
y
\\
l I
l