ML20207B731
| ML20207B731 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 07/25/1988 |
| From: | Greenman E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Sylvia B DETROIT EDISON CO. |
| Shared Package | |
| ML20207B736 | List: |
| References | |
| EA-88-196, NUDOCS 8808040119 | |
| Download: ML20207B731 (2) | |
See also: IR 05000341/1988012
Text
_
- _ _ _ _ _ - _ _ _ _ _ _
'
f) L
'
3
e
JUL25 Iggg
Docket No. 50-341
EA 88-196
The Detroit Edison Company
1
ATTN:
B. Ralph Sylvia
Senior Vice President
Nuclear Operations
6400 North Dixie Highway
Newport, MI 48166
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. W. Rogers,
M. Parker, P. Pelke, S. Stasek, T. Silko and J. House of this office on
April 1 through May 27,.1988, of activities at Fermi 2 authorized by Facility
Operating License No. NPF-43 and to the discussion of our findings with
Mr. W. Orser at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During the ,spection, certain of your activities appeared to be in violation
of NRC requ ements, as specified in the enclosed Notice.
A written response
is required. . Violation 4 in the enclosed Notice occurred during the general
timeframe and had the same root cause as the violations cited in the escalated
enforcement action issued on May 14, 1987
Additionally, implementation of
your Technical Specification Improvement Program should prevent recurrence.
Consequently, this violation was categorized as Severity Level IV and no
further response is required.
The apparent violation in Paragraph 2.b is being reviewed for potential
enforcement action in conjur.ction with other surveillance program concerns
previously identified in Inspection Reports No. 30-341/88006(DRP) and
No. 50-341/87048(DRP).
You will be notified by separate correspondence
' of our decision regarding enforcement action for this issue.
No written
'
response is required until you are notified of any enforcement action.
l
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
I
this letter, the enclosures, and your response to this letter will be placed
in the Public Document Room.
l
8808040119 880725
ADOCK 05000341
p$
\\
o
,
O
_ _ .
E
...
,
1
-
The Detroit Edison Company-
'2
'
We will gladly ~ discuss any questions you have concerning this inspection.
Sincerely,
"Original Sfaned by E.G. Cred5n"
Edward G. Greenman, Director
Division of Reactor Projects
Enclosures:
1. ~ Notice of Violation
2.
Inspection Report
No. 50-341/88012(DRP)
cc w/ enclosures:
Patricia Anthony, Licensing
P. A. Marquardt, Corporate
Legal Department
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Ronald Callen, Michigai
Public Service Commission
Harry H. Voight, Esq.
.
Michigan Department of
Public Health
Monroe County Office of
Civil Preparedness
J. Lieberman,. OE
L. Chandler, 0GC
F. Miraglia, NRR
t)
'
4il
II
1
RIII*)
R I
l
r
.pc
we[egn
p ,64
Gro
Gre
ike/ims
er
Schumacher
Kno
1
1 a^~
1x
Av
7/9
?- =
1
l