ML20207B652
| ML20207B652 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 07/20/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20207B657 | List: |
| References | |
| NUDOCS 8808030085 | |
| Download: ML20207B652 (3) | |
See also: IR 05000498/1988035
Text
_
_-
, , ,
l
,
y
.
'
!
.
?
l
JUL 2 01988
l
.
In Reply Refer To:
!
Dockets:
50-498/88-35
i
50-499/88-35
.!
Houston Lighting & Power Company
ATTN:
J. H. Goldberg, Group Vice
President, Nuclear
!
l
P.O. Box 1700
i
l
Houston, Texas 77001
l
l
\\
'
Gentlemen:
l
,
~
This refers to the inspection conducted by Messrs. L. E. E11ershaw, R. G.
Taylor, and E. P. Hildebrand of this office during the period May 16 through
June 24, 1988, of activities authorized by NRC Operating License NPF-76 and
L
Construction Permit CPPR-129 for the South Texas Project Units 1 and 2, and to
the discussion of our findings with Mr. J. T. Westermeier and other members of
f
your staff on May 20. June 10 and June 24, 1988.
i
Areas examined during the inspection included a review of the preoperational
testing quality assurance program, including the areas of document control,
j
control of records, audits, design control, and maintenance of equipment.
Preoperational test activities related to the emergency-standby power system
,
were examined including review of procedures, witnessing of tests, and review
of test records. Within these areas, the inspection consisted of selective
examination of procedures and representative records, interviews with
j
personnel, and observations by the NRC inspectors.
The inspection findings are
,
documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
!
identified,
j
F
Should you have any questions concerning this inspection, we will be pleased to
t
discuss them with you,
i
)
Sincerely.
.
delginal ,ignea By
bhu AL Watgome
L. J. Callan. Director
i
Division of Reactor Projects
I
Enclosure:
(see next page)
RIV:Rl*
Rl*
C:NQPS*
AC:PS$*
0:0R$*
!
RGiaylor:gb
LEEllershaw
!Barnes
RElreland JLMilhoan
!
/ /88
/ /88
/ /88
/ /88
/ /88
l
!
0:0RP*
i
LJCallan
l
/ /88
i
.
.
!
89060300S5 $807 o
k,
!
ADXg c500o499
[
hcl
.
e-em*yem7-T7----
+
r-ir e nemee'
-
er',w'r--=---'wsm'e"*=WWCw--****-*W-"9~N-'
" wt--9v-
--'n-w-e'Wvv+w-
Nye'NP1""**"**
- "*-"*-'*"*w*~
- 'e
-
_ _ _ _ _ _ _ _ _
__
__
___
_ _ _ _ _ _ _
_ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _
_ _ _ _
O
.
Houston Lighting and Power Company
-2-
,
Enclosure:
Appendix - NRC Inspection Report
,
50-498/88-35
50-499/88-35
,
cc w/ enclosure:
,
Houston Lighting & Power Company
Newman & Holtzinger, P.C.
'
ATTN:
M. A. McBurnett, Manager
ATTH:
J. R. Newman, Esquire
Operations Support Licensing
1615 L Street, N.W.
(
P.O. Box 289
Washington, D.C.
20036
<
Wadsworth, Texas 77483
Houston Lighting & Power Company
l
ATTN: Gerald E. Vaughn, Vice President
'
Nuclear Operations
t
P.O. Box 289
l
Houston, Texas 77001
Houston Lighting & Power Company
ATTN:
S. L. Rosen
j
P.O. Box 289
l
Wadsworth, Texas 77483
-
Houston Lighting & Power Company
'.
-
ATTN:
J. T. Westerreier, General Manager
South Texas Project
!
P.O. Box 289
'
Wadsworth. Texas 77483
l
,
l
Houston Lighting & Power Company
i
ATTN:
R. W. Chewning Chairinan
'
Nuclear Safety Peview Board
j
P.O. Box 289
Wadsworth, Texas 77483
Central Power & Light Company
j
ATTN:
R. L. Range /R. P. Verret
!
P.O. Box 2121
l
Corpus Christi, Texas 78403
j
City Public Service Board
ATTN:
R. J. Costello/M. T. Hardt
l
P.O. Box 1771
San Antonio, Texas 78296
!
i
I
l
i
.
l
-
-
- - -
- -
- - - - - - - -
-
.
!
- '
,
,
.
Houston Lighting and Power Company
3
.-
!
City of Austin Electric Utility
4
ATTN:
R. J. Miner. Chief Operating
i
Officer
-i
721 Barton Springs Road
-
l
.
Houston Lighting & Power Company
(
ATTN: Licensing Representative
j
Suite 610
'
Three Metro Center
i
Bethesda, Maryland 20814
'
\\
Texas Radiation Control Program Director
l
,
bectoDMB(IE01)
f
bec distrib. by RIV:
- DRP
- RRI-OPS
!
R. O. Martin, RA
- DRS
t
l
- $ection Chief (DRP/D)
- RPB-DRSS
'
- MIS System
- RIV File
l
Lisa Shea. RM/ALF
- RSTS Operator
i
R. Bachmann, OGC
- D. Hunnicutt
.
- P. Kadarbi. NRR Project Manager
- L. E11ershaw
G. F. Sanborn. E0
- R. Taylor
- E. Hildebrand
- I. Barnes
t
- R. Ireland
/l
- w/766
I
t
,
,
s
,
i
!
l