| Site: | Cooper |
| Issue date: | 07/10/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20207B586 | List: |
| References | |
| NUDOCS 8607180120 | |
| Download: ML20207B581 (2) | |
See also: IR 05000298/1986016
Text
,
- - - - - - - - - - - - - - - -
_ _ _ _ _
__
_
,
JLL i 0191E
f
-
,
In Reply Refer To:
Docket:
50-298/86-16
l
Nebraska Public Power District
ATTN:
J. M. Pilant, Manager, Technical
Staff-Nuclear Power Group
P. O. Box 499
Columbus, Nebraska 68601
Gentlemen:
This refers to the inspection conducted by Mr.
I.'. A. Caldwell of this office
during the period April 21-25, 1986, of activities authorized by NRC Operating
License DPR-46 for Cooper Nuclear Station, and to the discussion of our
findings with members of your staff at the conclusion of the inspection.
Areas examined during the inspection included physical barriers
vital area,
access control
personnel, detection aids - vital area, alarm stations,
security system power supply, and communications. Within these areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspector.
The
inspection findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
The material enclosed herewith contains Safeguards Information as defined by
10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
by Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, the
material, with the exception of the report cover page which is an inspection
summary, will not be placed in the Public Document Room.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
=
L
h
RIV:EP) L1/1w
C:EP&S S
D:[
C: LP5
A
C:RPB
RACaldw
LAYand
ngart
JPJat don
JEGagl<
do
4 /gb/8ts
h/0/86
({/o(/86
i /\\ /86
7// M
3
I
'
N00W1'ATMs
n[
8607100120 860710
'AFEGUARDS I!TFORMATION
DR
ADOCK 0000
8
W SEPARATION THIS
. AGE IS DE00'Troe m
.
Nebraska Public Power District
-2-
i
Should you have any questions concerning this inspection, we will be pleased to
i
discuss them with you.
Sincerely,
Or@nal Signed by;"
.
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-298/86-16
cc with summary page only:
Guy Horn, Division Manager
of Nuclear Operations
Cooper Nuclear Station
P. O. Box 98
Brownville, Nebraska 68321
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bec:
Copy of entire report maintained in RIV Security File and sent to:
G. McCorkle, NMSS
J. Gibson, SSPD/NRR
IE File
Resident Inspector (w/766)
R. Martin
Security Inspector
Chief. EPSPS
D. A. Powers, EO
bec:
RIV - Lette.r and Inspection Summary only w/766:
RPB
D. Weiss, LFMB (AR-2015)
Section Chief (RPSA)
RIV File
MIS
RSTS Operator
R&SPB
bpc:
RIV - Letter and Inspection Summary only w/out 766:
+0MB IE-04
R. L. Bangart, DRS&S
E. H. Johnson, DRS&P
ERI48tstE 00ETAtas
SAFEGUARDS INF0lufATIOff.
-
UPOIl SEPARATI0It THIS
'
FAGE IS D3000fTHOGJD.
.