O t
~0 8 JUL W86 4
j Docket Nos. 50-277 l
50-278 1
Philadelphia Electric Company ATTN: Mr. S. L. Daltroff Vice President Electric Production 2301 Market Street Philadelphia, PA 19101 Gentlemen:
Subject:
Inspection Report No. 50-278/86-09 i
By letter dated July 8, 1986, the law offices of Conner and Wetterhahn requested, on your behalf, an extension of two weeks from July 9,1986 to respond to oer Notice of Violation and Proposed Imposition of Civil Penalties, dated June 9,1986. An extension of two weeks is hereby granted. Your i
response is now due no later than July 23, 1986.
i Sincerely, 4
j Orf gfnal 31gned by Thor.:a3 E. Murley, Thomas E. Murley Regional Administrator I
cc:
R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station John S. Kemper, Vice President, Engineering and Research W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric G. Leitch, Superintendent, Nuclear Generation Division Troy B. Conner, Jr., Esquire Raymond L. Hovis, Esquire i
Thomas Magette, Power Plant Siting, Nuclear Evaluations W. M. Alden, Engineer in Charge, Licensing Section Public Document Room (PDR)
Local Public Document Room (LPDR) i Nuclear Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth of Pennsylvania
.1 bcc:
Region I Docket Room (with concurrences)
DRP Section Chief J. Ta "or, IE r
3/
/
RI:D A
VI:RA f
Mur{ey l
Star cki/grm A
r 7/8/86 4
1 1
l FS
- So$k $$838).,.7 M
F PDR '
\\\\\\