ML20207A736
| ML20207A736 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 11/03/1986 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20207A741 | List: |
| References | |
| NUDOCS 8611110245 | |
| Download: ML20207A736 (3) | |
See also: IR 05000424/1986084
Text
i7
l
\\ COOQ
v
g
9
4
h
.-
k
3
3
e
.
'
NOV 3
1906
1
Docket No. 50-424
(
License Nos. CPPR-108
t
'
orgia Power Company
ATTN: Mr. J. H. Miller, Jr.
.
s
President
j
P.-0. Box 4545
Atlanta,-GA 30302
Gentlemed:
SUBJECT: NRC INSPECTION REPORT NO. 50-424/86-84-
This refers to the Nuclear Regulatory Conunission (NRC) inspection conducted by
H. L. Whitener on August 23-29. -1986.
The inspection included a review of
activities authorized for your Vogtle facility.
At the conclusion of. the
'
inspection, the findings were discussed with those members of your staff
identified in the enclosed insgoction report.
Areas examined during the inspection are identified in the report.' Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
i
i
Withi.n the scope of the inspection, no violations or deviations were identified.-
In 'accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2
-Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
.;
\\S\\
c
Virgil L. Brownlee, Chief
,
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
NRC Inspection Report
I
cc'w/ enc 1:
(See page 2)
,
8611110245 861103
ADOCK 05000424
O
PDR j.
t \\ fI
'
(
.
t
,
,
. -
_.
.
s-
,-
i
.,
EV3
1986
Georgia Power Company
2
%
c
/ enc 1:
-
.P.'-0'Reilly, Senior Vice President.
- Nuclear Operations
-
R. E. Conway, Senior Vice President &
vd.ProjectDirector
O. Foster, Vice President, Project
' / Support
_
.
VP. D. Rice, Vice President, Project
f Engineering
- VI. H. Pinson,.Vice President, Project
yd. Construction
T. Beckham, Vice President &
.
.d.GeneralManager-Operations
A. Thomas, Vice President,
d. Licensing
. S. Read, General Manager,
vd.QualityAssurance
W. Hayes, Vogtle Quality
vh.AssuranceManager
C. Ramsey, Manager -
Readiness Review
/G. B. Bockhold, General Manager,
. / Nuclear Operations
vl. 'Gucwa, ~ Manager Nuclear _ Safety
M.andLicensing
H. Googe, Project
Construction Manager.
/E.D._ Groover, Quality-
Assurance Site Manager -
/ Construction
_ W. A. Bailey, Project Licensing
Manager,-
V'G.-F.Trowbridge,Esq.,Shaw,
V8.Pittman,PottsandTrewbridge
-
W.- Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
E. L. Blake', Jr. , Esq. , Shaw,
Pittman, Potts and Trowbridge
'/J.E. Joiner,Troutman, Sanders,
~/ Lockerman and Ashmore
-
'
VJ. G. Ledbetter, Commissioner,
/ Department of Human Resources
VC. H. Badger, Office of Planning
j and Budget
VD. Kirkland, III, Counsel,
Office of the' Consumer's Utility
Council
(cc w/ encl cont'd - see page 3)
i
.
.,
..s
,
-
.,
Georgia Power Company
3
M3
1986
_/cw/enci-cont'd
V D. Feig, Georgians Against
Nuclear Energy
VM. B. Margulies, Esq. , Chairman,
Atomic Safety and Licensing Board
Panel
Dr. O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
Panel
/G. A.' Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
.
Panel
..P.
Garde, Citizens Clinic, Director
Government Accountability Project
.
,pccw/ enc 1:
V . Reis, GS0
. M. Hill, IE
J4. Miller, NRR
v . Brach, GS0
. Sinkule, RII
E. Christnot, RII
VNRC Resident Inspector
Document Control Desk
State of Georgia
.
RII
RII
RI
RI!
W d /.d
N
/d
HWhitener:1b
FJapp/
AHerdt
MSinkule
-10/30/86
10/y//86
10/31/86
10/K/86
i