Forwards Safety Evaluation & SALP Input Accepting Util Response to Generic Ltr 83-28,Items 3.2.1 & 3.2.2.TAC 59167 May Be Closed
ML20206U943
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/03/1986
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Miraglia F
Office of Nuclear Reactor Regulation
Shared Package
ML20206U946 List:
References
GL-83-28, TAC-59167, NUDOCS 8607110262
Download: ML20206U943 (3)


Text

'

. JUL 3 1986 MEMORANDUM FOR: Frank J. Miraglia, Jr., Director Division of Pressurized Water Reactor Licensing-B FROM: Dennis E. Kirsch, Director Division of Reactor Safety and Projects

SUBJECT:

REGION V SAFETY EVALUATION REPORT FOR PALO VERDE NUCLEAR GENERATING STATION GENERIC I.ETTER 83-28, ITEMS 3.2.1 AND 3.2.2 TAC NO. 59167 Plant Name: Palo Verde Units 1, 2, & 3 Docket Number: 50-528, 529 & 530 Responsible Directorate: PWR Project Directorate No. 7 Project Manager: M. Licitra Review Status: Complete Enclosed is the Region V Safety Evaluation Report addressing the subject licensing action. Inasmuch as this action has been completed, TAC Number 59167 may be closed.

We have also enclosed the SALP input requested by NRR Office Letter humber 44.

If you have any questions regarding this SER, please contact Jerry Zwetzig at FTS 463-3749.

/6/

Dennis F. Kirsch, Director Division of Reactor Safety and Projects

Enclosures:

As Stated cc w/ enclosures:

M. Licitra, NRR G. Knighton, NRR R. Emch, NRR A. Toalston, NRR R. Zimmerman, RV L. Miller, RV 8607110262 860703 A. Hon, RV ADOCK 0500 8 hDR R. Pate, RV G. Zwetzig, RV via 5520: Division of PWR Licensing-B, NRR, Attn: M. Licitra ID: Palo Verde TAC No. 59167 bec w/ enclosures: J. Martin, B. Faulkenberry, RSB/ Document Control Desk (RIDS)

RV/jk ZWETZIG KIRSCH l $

PATE) 6/)f/86 -4P/8tr M86 hhf 7/2/fc vfj /yc

,,'s s@ Mk UNITE 3 ETATES 4 NUCLEAR REGULATORY COMMISSION

[ g g j , REGION V

  1. 1450 MARIA LANE, SUITE 210 4 pd WALNUT CREEK, CALIFORNIA 94596 g ***** ,o JUL 3 1986 MEMORANDUM FOR: Frank J. Miraglia, Jr., Director Division of Pressurized Water Reactor Licensing-B FROM: Dennis F. Kirsch, Director Division of Reactor Safety and Projects

SUBJECT:

REGION V SAFETY EVALUATION REPORT FOR PALO VERDE NUCLEAR GENERATING STATION GENERIC LETTER 83-28, ITEMS 3.2.1 AND 3.2.2 TAC NO. 59167 Plant Nace: Palo Verde Units 1, 2, & 3 Docket Number: 50-528, 529 & 530 Responsible Directorate:  ?WR Project Directorate No. 7 Project Manager: M. Licitra Review Status: Complete Enclosed is the Region V Safety Evaluation Report addressing the subject licensing action. Inasmuch as this action has been completed, TAC Number 59167 may be closed.

We have also enclosed the SALP input requested by NRR Office Letter Number 44.

If you have any questions regarding this SER, please contact Jerry Zwetzig at FTS 463-3749.

r 32' '

cLO Dennis F. Kirsch, Director Division of Reactor Safety and Projects

Enclosures:

As Stated cc w/ enclosures:

M. Licitra, NRR G. Knighton, NRR R. Emch, NRR A. Toalston, NRR R. Zimmerman, RV L. Miller, RV A. Hon, RV R. Pate, RV G. Zwetzig, RV via 5520: Division of PWR Licensing-B, NRR, Attn: M. Licitra ID: Palo Verde TAC No. 59167

SALP INPUT FOR COMPLETED SER Organization Preparing SALP Input: Region V Facility: Palo Verde Docket Nos.: 50-528, 50-529 & 50-530 Phase: Operating SER

Subject:

Generic Letter 83-28, Items 3.2.1 and 3.2.2 TAC No.: 59167 FUNCTIONAL AREA: Licensing Activities Evaluation Criteria:

1. Management Involvement in Assuring Quality The licensee's submittal reflected a management program where activities affecting quality were adequately controlled.

Rating: Category 2

2. Approach to Resolution of Technical Issues from a Safety Standpoint The licensee's approach to this issue appeared to be based primarily on the safety .asues involved. The licensee did, however, commit to a rather extended period of time to complete implementation of this item.

Rating: Category 2 i

3. Responsiveness to NRC Initiatives i

As noted above, the licensee was responsive to the issue, but selected a protracted schedule to complete implementation.

Rating: Category 2

4. Reporting and Analysis of Reportable Events -

Not observed Rating: None

5. Staffing (Including Management)

The protracted schedule proposed by the licensee for completion of this item suggests the possibility of inadequate staffing in this technical area.

kating: 2

6. Training and Qualification Effectiveness 1

Based on the discussions of this issue with the licensee's representatives, l the training and qualifications of the representatives appeared to be l above average, l I

Rating: Category 1 i 1 i i