ML20206U146
| ML20206U146 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 02/04/1999 |
| From: | Tapia J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Cottle W HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20206U150 | List: |
| References | |
| 50-498-98-11, 50-499-98-11, NUDOCS 9902120216 | |
| Download: ML20206U146 (5) | |
See also: IR 05000498/1998011
Text
i
.
D*%
UNITED STATES
p
L*
y
(
NUCLEAR REGULATORY COMMISSION
$
,E
REGloN IV
k
611 RYAN PLAZA DRIVE, SUITE 400
g*
l
ARLINGTON, TEXAS 76011-8064
y,g
FEB - 41999
'
William T. Cottle, President and
Chief Executive Officer-
STP Nuclear Operating Company
P.O. Box 289
Wadsworth, Texas 77483
SUBJECT: NRC INSPECTION REPORT NO. 50-498/98-11; 50-499/98-11
Dear Mr. Cottle:
l
This refers to the inspection conducted on November 29,1998, through January 9,1999, at the
South Texas Project Electric Generating Station, Units 1 and 2 facilities. The enclosed report
presents the results of this inspection.
During the 6-week period covered by this inspection, your conduct of activities at the South
Texas Project facility was generally characterized by safety-conscious operations, sound
- engineering and maintenance practices, and careful radiological work controls.
in accordance with 10 CFR 2.790 of the NRC's ' Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely
l
C
oseph I. Tapia, hief
Projects Branch A
Division of Reactor Projects
ii.
' Docket Nos.: 50-498
50-499
License Nos.: NPF-76
NPF-80
Enclosure:
NRC Inspection Report No.
50-498/98 11;50-499/98-11
7
9902120216 990204
,
ADOCK 05000498
1
l
0
L
1
.s,
,
l
.:.-
,
'STP Nuclear Operating Company
. .-2-
.
cc w/ enclosure:
T. H. Cloninger, Vice' President
- Engineering & Technical Services'
'
STP Nuclear Operating Company.
~ P.O.' Box 289
Wadsworth; Texas'.77483
A. Ramirez/C. M. Canady
' City of Austin '
. Electric Utility Department
~ 721 Barton Springs Road-
, . .
Mr. M. T. Hardt/Mr. W. C. Gunst
i
City Public Service Board-
,
P.O. Box 1771
San Antonio,' Texas 78296
~ D. G. Tees /R. L. Balcom
Houston Lighting & Power Company .
' P.O. Box 1700'
,
Houston, Texas 77251
~Jon C. Wood .
Matthews & Branscomb
One Alamo Center-
- 106 S. St. Mary's Street, Suite 700
San Antonio, Texas' 78205-3692
Jack R. Newman, Esq.
F
1800 M. Street, N.W.
- Washington, D.C. ' 20036-5869
- Mr. G. E. Vaughn/Mr. C. A. Johnson
'
,
. Central Power & Light Company
P.O. Box 289
MailCodei N5012.
.Wadsworth, Texas 77483
j
INPO '
Records Center
i
1700 Galleria Parkway -
Atlanta' Georgia 30339-5957
,
a
j.,
r
.
'STP Nuclear Operating' Company
-3 .
I
1
Bureau of Radiation Control-
' State of Texas
- 1100 West 49th Street ..
.
Mr.~ Jim Calloway
,
. Texas Public Utility Commission--
William B. Travis Building'
.
1701 North Congress Avenue
P.O. Box 13326
- John Howard, Director
.' Environmental and Natural Resources Policy -
Office of the Govemor
. P.O. Box 12428 -
- Judge, Matagorda County
Matagorda County Courthouse
1700 Seventh Street
Bay City, Texas .77414
_
4
h
1
'
,
-)
l
l
>
i
. , -
,
.
I
.
l'
,
1
1
L-
' STP Nuclear Operating Company
-4-
FEB - 41999
'l
!
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
l
!
- E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
<
i
' bec to DCD (IE01)
l
bec distrib. by RIV:
l.
Regional Administrator-
Resident inspector
i-
DRP Director
DRS-PSB
DRS Directo. -
MIS System
,
Branch Chief (DRP/A)
RIV File
Project Engineer (DRP/A)
R. Bachmann, OGC (MS: 15-B-18)
Branch Chief (DRP/TSS)
l
DOCUMENT NAME: R:\\_STP\\ST811RP.NFO
,
To receive copy of document, indicete in box: "C" = copy without enclosures *E" = Copy with enclosures "N" = No copy
i
RIV: SRI
RI
RI
C:DRP/A_/l y
'
NFO'Keefe &A
, WCSifre 02A
GLGuerra h
JITapia W/Mh
'
02A/199
4E N 02$99 M 02/f/99 M 024/99 /JlV
OFFICIAL RECORD COPY
V V
f
M
-
lH
.
STP Nuclear Operating Company
-4 -
FB - 4 m
- 5-Mail report to T. Frye (TJF)
E-Mail report to D.' Lange (DJL)
.
E-Mail report to NRR Event Tracking' System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
!
E-Mail report to Richard Correia (RPC)
E Mail report to Frank Talbot (FXT) -
w bcc to DCD (IE01)
bec distrib. by RIV:
Regional Administrator-
Resident inspector
DRP Director -
DRS-PSB
i
DRS Director
MIS System
Branch Chief (DRP/A)
RIV File
Project Engineer (DRP/A)
R. Bachmann, OGC (MS: 15 B-18)
Branch Chief (DRP/TSS)
I
i
'
' DOCUMENT NAME: R:\\_STP\\ST811RP.NFO
E To receive copy of document, Indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures *N* = No copy
RIV: SRI-
RI
RI
C:DRP/A_/ ) /
NFO'Keefe tyn
, WCSifre Et
GLGuerra h
JITapia Wh
02#199--
4L M
02/4199 dved 02Nf99 f) HCL 02/4/99 @V
OFFICIAL RECORD COPY
V V
l
,
u
12033.0
!
k
a