Forwards SALP Rept 50-409/86-01 for Jan 1985 - June 1986,for Review Prior to 861009 Meeting
ML20206T713
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 09/30/1986
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Taylor J
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20206T719 List:
References
NUDOCS 8610070156
Download: ML20206T713 (3)


See also: IR 05000409/1986001

Text

- _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ - _ _

$

JE40

'

I

\\

t

SEP 3 01986

'

Docket No. 50-409

Dairyland Power Cooperative

ATTN:

Mr. J. W. Taylor

General Manager

2615 East Avenue - South

Lacrosse, WI 54601

Gentlemen:

Enclosed for your review, prior to our scheduled meeting of October 9,1986,

is the SALP 6 Board Report for the Lacrosse Boiling Water Reactor (LACBWR)

covering the period January 1, 1985 through June 30, 1986.

In accordance with NRC policy, I have reviewed the SALP Board assessment and

concur with the assigned ratings.

It is my view that Dairyland Power Coo

tive's conduct of nuclear activities in connection with the LACBWR Plant'pera-

continues to demonstrate a high level of concern for nuclear safety.

Specific

areas I would like to highlight are:

,

1.

A Category 1 rating was maintained for Surveillance and Inservice Testing,

and Licensing Activities.

2.

Category 2 ratings were maintained for Plant Operations, Radiological

Controls, Emergency Preparedness, Security, and Quality Programs and

Administrative Controls Affecting Quality.

The new SALP 6 functional

area, Training and Qualification Effectiveness, was also rated at a

Category 2 level..

3.

Performance in the area of Fire Protection was rated as Category 2 during

this period.

This represents a decrease from the Category 1 rating

during our last assessment.

The performance decrease in this area was

due to the concerns identified during the Appendix R inspection.

4.

Performance in the new functional area of Outages is given a Category 3

rating this period.

This rating reflects the number of problems

encountered during the 1986 refueling outage.

5.

Performance in the area of Maintenance / Modifications declined from a

Category 2 to a Category 3 rating this period.

This is a reflection of

the high number of equipment failures which have resulted in scrams and

other reportable events.

While you will have sufficient opportunity to present your comments at the

meeting on October 9, 1986, we also solicit written comments within 30 days

after the meeting to enable us to evaluate your comments and provide you with

our conclusions relative to them.

8610070156 860'730

PDR

ADOCK 0D000909

G

PDR

__._

j

1

3

Dairyland Power Cooperative

3

SEP 3 01986

Continued

L. W. Zech, Chairman

J. K. Asselstine, Comissioner

F. M. Bernthal, Comissioner

T. M. Roberts, Comissioner

K. M. Carr, Comissioner

H. L. Thompson, NRR

J. Axelrad, IE

M. R. Johnson, IE SALP Coordinator

RIII PRR

RIII SGA

INP0

l

l

,

.

.

w

-

- -

---,-o,

e

w

,

w

e-

w

e---,--e

e- ,

-,.v.,

- , -- - - , - - - - -~-m--wr

r-r

-e-,v~~

-v,

--

--r-r,-

- , ee ,,

ewa

s

.

Dairyland Power Cooperative

2

SEP 3 01986

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the SALP

Report will be placed in the NRC Public Document Room.

No reply to this letter is required at this time; however, should you have any

questions concerning this SALP Report, we would be pleased to discuss them with

you.

Sincerely,

Original signed 67

A, Ucrt Davi-

/

James G. Keppler

Regional Administrator

Enclosure: SALP 6 Board

Report No. 50-409/86001

cc w/ enclosure:

J. Parkyn, Plant Superintendent

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

J. A. Zwolinski, BWR Project

Directorate No. 1

John Stang, Licensing Project Manager

John J. Duffy, Chief

Boiler Section

Mary Lou Munts, Chairperson

Wisconsin Public Service

Commission

Spark Burmaster, Coulee

Region Energy Loalition

State Liaison Officer, State

of Wisconsin

J. M._ Taylor, Director, IE

H. R. Denton, Director, NRR

Regional Administrators

RI, RII, RIV, RV

,

Distribution Continued

RIII

RII

RII

RII

RII

RIIJ

RII

,

'T

G

/

P}a\\f

hn/bls

Sc

ibinz Bo d G de

d N

us

Lan

periello

nd

R

RIII

kDvis

p1(e

1er

,q

-