Forwards Insp Rept 50-333/86-10 on 860621-0808.No Violation Noted.Util Should Review List of safety-related Instrumentation & Determine Which Instruments Should Be Included in Periodic Calibr Program
ML20206S741
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/08/1986
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Radford Converse
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20206S747 List:
References
NUDOCS 8609220362
Download: ML20206S741 (2)


See also: IR 05000333/1986010

Text

i

.. .

.

O

o *

,

08 SEP 1966

Docket No. 50-333

Power Authority of the State of New York

James A. FitzPatrick Nuclear Power Plant

ATTN: Mr. Radford J. Converse

Resident Manager

P.O. Box 41

Lycoming, New York 13093

Subject: Inspection 50-333/86-10

This refers to the routine inspection conducted by Mr. A. Luptak of this office

on June 21 to August 8,1986, at the J.A. FitzPatrick Nuclear Power Plant,

Scriba, New York. Mr. Luptak discussed the inspection findings with you and

other members of your staff at the conclusion of the inspection.

Within the scope of this inspection, no violations were identified. However,

the staff is concerned with the lack of periodic calibration or appropriate

testing to verify that safety-related instruments, particularly those that can

directly affect the operability of Engineered Safety Features (ESF) equipment,

as noted by the examples contained in paragraph 6e of the attached report, are

functioning within their required ranges. These concerns were discussed with

you during the exit meeting at which time you agreed to review the list of

safety-related instrumentation and determine which instruments should be

included in the periodic calibration program. Our inspector will monitor your

progress during future inspections in accordance with the schedule indicated in

the attached report.

No response to this letter is required.

i Your cooperation with us is appreciated.

Sincerely,

@ Sigsod By:

! Robert M. Gallo, Chief

Projects Branch No. 2

Division of Reactor Projects

Enclosure:

l

NRC Region I Inspection Report No. 50-333/86-10

0FFICIAL RECORD COPY IR FITZ 86-10 - 0001.0.0

'

09/08/86

0609220362 860908 /

,

PDR

G

ADOCK OS000333

PDR

p p( O l l I

. .

. -

Power Authority of the 2

State of New York 08 SEP 1986

cc w/ encl:

L.W. Sinclair, President and Chief Operating Officer

J.P. Bayne, First Executive Vice President -

Chief Operations Officer

A. Klausmann, Vice President-Quality Assurance and

Reliability

R.L. Patch, Quality Assurance Superintendent

G.H. Wilverding, Chairman, Safety Review Committee

Gerald C. Goldstein, Assistant General Counsel

NRC Licensing Project Manager

Department of Public Service, State of New York

'

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encis)

Section Chief, DRP

RI:DRP .RI:DRP

"- sch-11/rbl Linville Gallo

Mi of

3

9/5 /86 9/$/86 9/h/86

0FFICIAL RECORD COPY IR FITZ 86-10 - 0002.0.0

09/05/86