i
..
.
.
O
o
,
08 SEP 1966
Docket No. 50-333
Power Authority of the State of New York
James A. FitzPatrick Nuclear Power Plant
ATTN: Mr. Radford J. Converse
Resident Manager
P.O. Box 41
Lycoming, New York 13093
Subject:
Inspection 50-333/86-10
This refers to the routine inspection conducted by Mr. A. Luptak of this office
on June 21 to August 8,1986, at the J.A. FitzPatrick Nuclear Power Plant,
Scriba, New York. Mr. Luptak discussed the inspection findings with you and
other members of your staff at the conclusion of the inspection.
Within the scope of this inspection, no violations were identified.
However,
the staff is concerned with the lack of periodic calibration or appropriate
testing to verify that safety-related instruments, particularly those that can
directly affect the operability of Engineered Safety Features (ESF) equipment,
as noted by the examples contained in paragraph 6e of the attached report, are
functioning within their required ranges. These concerns were discussed with
you during the exit meeting at which time you agreed to review the list of
safety-related instrumentation and determine which instruments should be
included in the periodic calibration program. Our inspector will monitor your
progress during future inspections in accordance with the schedule indicated in
the attached report.
No response to this letter is required.
i
Your cooperation with us is appreciated.
Sincerely,
@ Sigsod By:
!
Robert M. Gallo, Chief
Projects Branch No. 2
Division of Reactor Projects
Enclosure:
l
NRC Region I Inspection Report No. 50-333/86-10
0FFICIAL RECORD COPY
IR FITZ 86-10 - 0001.0.0
09/08/86
'
0609220362 860908
p p( O l
/
ADOCK OS000333
,
l
I
G
.
.
.
-
Power Authority of the
2
State of New York
08 SEP 1986
cc w/ encl:
L.W. Sinclair, President and Chief Operating Officer
J.P. Bayne, First Executive Vice President -
Chief Operations Officer
A. Klausmann, Vice President-Quality Assurance and
Reliability
R.L. Patch, Quality Assurance Superintendent
G.H. Wilverding, Chairman, Safety Review Committee
Gerald C. Goldstein, Assistant General Counsel
NRC Licensing Project Manager
'
Department of Public Service, State of New York
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New York
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encis)
Section Chief, DRP
RI:DRP
.RI:DRP
"- sch-11/rbl
Linville
Gallo
Mi of
3
9/5 /86
9/$/86
9/h/86
0FFICIAL RECORD COPY
IR FITZ 86-10 - 0002.0.0
09/05/86