SEABROOK STATION Enginraring Office 8)b-"
y p_ --
b
'\\;
September 18, 1986 Put2c Service of New Hampshire SBN-1197 T.F.
B7.1.2 NEW HAMPSHIRE YANKEE DIVISION United States Nuclear Regulatory Commission Washington, DC 20555 Attention:
Mr. Vincent S. Noonan, Project Director PWR Project Directorate No. 5
References:
(a) Construction Permits CPPR-135 and CPPR-136, Docket Nos. 50-443 and 50-444 (b) PSNH Letter (SBN-1141), dated June 25, 1986,
" Auxiliary Feedwater System Technical Specifications",
J. DeVincentis to V. S. Noonan (c) USNRC Letter, dated August 19, 1986, "Seabrook Emergency and Startup Feedwater Pumps", V. Nerses to R. J. Harrison
Subject:
Emergency and Startup Feedwater Pumps
Dear Sir:
In response to Reference (c), we confirmed that the information pro-vided in Reference (b) is correct and the Staff's understanding of the situation is correct.
In order to further clarify the situation, we will update the FSAR Figure 6.8-2 with the results of the Emergency Feedwater Pump field test curves and a certified Startup Pump curve. These curves have been previously provided to the Staff by Reference (b). We will also modif y Table 6.8-1 ( Attachment 1) for further clarity.
Our verbal commitment to verify the full flow capability via the steam generator path is assured by the Technical Specifications. The final draft of the Auxiliary Feedwater Surveillance Requirement 4.7.1.2.2 which requires the design flow to each steam generator from both the Emergency and Startup Feedwater Pumps to be verified periodically.
This periodic verification is in addition to the surveillance testing via the recirculation paths while the plant is in operation.
\\
8609220354 860918 PDR ADOCK 05000443.
A PINT I
)
Seabrook Station Construction Field Office. P.O. Box 700. Seabrook. NH O3874
3 so. '
')
United States Nuclear Regulatory Commission SBN-1197
-Attention:
Mr. Vincent S. Noonan '
Page 2 We believe your request for testing the Startup Feedwater Pump via the emergency flow path is accomplished by the Technical Specification surveillance testing requirements discussed above.
The revision to FSAR Figure 6.8-2 and Table 6.8-1 will be included in a future amendment to the Seabrook FSAR.
Very truly yours, P*
John DeVincentis Director of Engineering Attachments cc: Atomic Safety and Licensing Board Service List
Diane Curran, Esquire Peter J. Matnews, Mayor,-
i
~
Herocn_& Waion City Hall-y 2001 S. Street, N.W.
Nawburyport, MA 01950 Suite 430 Washington, D.C.
20009
' Judith H. Mizner Silvergate, Gertner, Baker, Sherwin E.. Turk, Esq.
Fine, Good 6.Mizner Office of the Executive Legal Director 88 Broad Street "U.S. Nuclear Regulatory Commission Boston, MA 02110 Tenth Floor Washington, DC 20555 Calvin A. Canney City Manager Robert A. Backus, Esquire City Hall 4
116 Lowell Street 126 Daniel Street P.O. Box 516 Portsmouth, NH 03801 Manchester, NH 03105 Stephen E. Merrill, Esquire Philip Ahrens, Esquire Attorney General Assistant Attorney General George Dana Bisbee, Esquire i-Department of The Attorney General Assistant Attorney General i
Statehouse Station #6 Office of the Attorney General Augusta, ME 04333 25 Capitol Street Concord, NH 03301-6397 4
I Mrs. Sandra Gavutis Chairman, Board of Selectmen Mr. J. P. Nadeau RFD 1 - Box 1154 Selectmen's Office Kenosington,' NH 03827 10 Central Road Rye, NH 03870 Carol S. Sneider, Esquire Assistant Attorney General Mr. Angie Machiros Department of the Attorney General Chairman of the Board of Selectmen One Ashburton Place,19th Floor Town of Newbury Boston, MA 02108 Newbury, MA 01950 4
Senator Gordon J. Humphrey Mr. William S. Lord U.S. Senate Board of Selectmen
. ashington, DC 20510 Town Hall - Friend Street W
(ATTN: Tom Burack)
Amesbury, MA 01913 Richard A. Hampe, Eng.
Senator Gordon J. Humphrey Hampe and McNicholas 1 Pillsbury Street 35 Pleasant Street Concord, NH 03301 Concord, NH 03301 (ATTN: Herb Boynton)
Thomas F. Powers, III H. Joseph Flynn, Esquire Town Manager Office of General Counsel Town of Exeter Federal Emergency Management Agency 10 Front Street 500 C Street, SW Exeter, NH 03833 Washington, DC 20472 Brentwood Board of Selectmen Paul McEachern, Esquire RFD Dalton Road Matthew T. Brock, Esquire J
Brentwood, NH 03833 Shaines & McEachern 25 Maplewood Avenue Gary W. Holmes, Esq.
P.O. Box 360 Holmes & Ells Portsmouth, NH 03801 47 Winnacunnet Ro'ed Hampton, NH 03842 Robert Carrigg Town Office Mr. Ed Thomas Atlantic Avenue FEMA Region I North Hampton, NH 03862 442 John W. McCormack PO & Courthouse Boston, MA 02109
y Attachy.nt 1 to'SBN-1197
'SB.I & 2 FSAR s'Il TABLE 6.8-1 EMERGENCY FEEDWATER PUMP DATA'.
Total Number rer Unit 2
Electric Motor Driven 1
Turbine Driven
'l Design Flow (each)
-710 gpm-A 7
i Design Head 3050 ft. (1320 psi)~
l Feedwater. Design Temperature 50-1000F~
l Required BHP 770 Motor' Size, HP 900 Turbine Rating, HP 900 L
Design Basis Flow (each) 2 650 gpm h