ML20206S391
| ML20206S391 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 09/17/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| References | |
| NUDOCS 8609220195 | |
| Download: ML20206S391 (4) | |
Text
-
+
I h.a.
SEP 171986 o
1
-In Reply Refer To:-
~"
Dockets: 50-313 50-368 s -
s Arkansas Power & Light Company w
f
' ATTN: Mr. Gene Campbell i
-S.
' t
-Vice President, Nuclear
-Operations
=
P. O. Box 551 Little Rock, Arkansas 72203
/
j Gent 1emen:
n This refers to the Enforcement Conference conducted'in the NRC Region IV. "
office on July 11.-1986, with M. Pendergrass and other members of your staff; The Enforcement Conference was held to discuss the findings of-the NRC Safety System Functional Inspection conducted during the period of January 6-31, 1986, and ' documented in our inspection report dated March 31, 1986.
The subjects discussed at this meeting are described in the encloseN Meeting Sumary. Enforcement action, if appropriate, will be addressed in separate correspondence.
It is our opinion that this meeting was beneficial and has provided for a better understanding of the concerns identified during the inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.
Should you have any questions concerning this matter, we will be pleased to discuss them.
Sincerely.
Original Signed Dy J. E. Gagliardo J. E. Gagliardo, Chief Reactor Projects Branch
Enclosure:
Meeting Sumary O
C/RP C/RPB EO DRHu r:cnm JEGag g/rdo DAPowers
/lb 9//l / U 9//6 /86 m
l 8609220195 860917
LW l
- w. ~.. a
\\
Arkansas Power & Light Company cc:.
J. M. Levine, Director Site Nuclear Operations Arkansas Nuclear One P. O. Box 608 Russellville, Arkansas 72801 Arkansas Radiation Control Program Director bec to DMB (IE45) bec distrib. by RIV:
'RPB Resident Inspector R. D. Martin, RA.,
's R&SPB SectionChief(RPB/B)
D. Weiss,~LR1B(AR-2015)~
RIV File DRSP RSB
~
MIS SYSTEM RSTS Operator D.'A. Powers, RIV,
4
'. (
t
.-e
.c-
,--.-.-.---..-----,---.,.,em..,.
,~.
._.._,,.m.-.
m
.-,-.--._r--
t
- . " > a
~
Arkansas Power & Light Co.
Attachment A
-MEETING
SUMMARY
Licensee:
Arkansas Power and Light Co.
Facility:
ANO-1 License No.:
DPR-51 Docket No.:
50-313
Subject:
Enforcement Conference Concerning the NRC Safety System Functional Inspection (SSFI) Findings (NRC IR No.
50-313/86-01)
On July 11, 1986, representatives of Arkansas Power & Light Company, met in Arlington, Texas, with NRC personnel from IE and Region IV, to discuss the SSFI findings, including the May 23, 1986, response to the SSFI report, dated March 31, 1986. The attendance list is attached as Appendix B to this Summary.
The meeting was held at the request of NRC Region IV.
The NRC presented the concerns resulting from the SSFI inspection, including safety evaluations, design control, equipment testing, maintenance procedure accuracy, and document control activities. The licensee discussed the emergency feedwater upgrade program, safety evaluations, design and engineering, equipment testing programs, and QA program improvements.
Attachment:
Attendance List
- 1
.e f:
I w?
APPENDIX B ENFORCEMENT CONFERENCE ATTENDANCE LIST NRC REGION IV ARKANSAS POWER AND LIGHT COMPANY /ANO-1 NRC ATTENDEES:
J. G. Partlow, D/ DIP, IE R. E. Hall, DD/DRSP J. E. Gagliardo, C/RPB D. R. Hunter, C/RPS/B W. D. Johnson, SRI M. E. Murphy, PI T. O. Martin, Team Leader, PAS, IE D. A. Powers, E0 J. Sharkey, IS, PAS G. Sioblom, IE LICENSEE ATTENDEES:
M. Pendergrass, VP, Engineering 4
J. M. Levine, D, Site Nuclear Operatins T. H. Cogburn, General Manager, Nuclear Services L. W. Humphrey, General Manager, Nuclear Quality D. R. Howard, Manager, Special Projects R. O. Lane, Manager, Engineering F. J. McWilliams, Manager, Maintenance A. J. Wrape, Manager, Nuclear Services