ML20206R944

From kanterella
Jump to navigation Jump to search
Informs of Delay in Completion of Comparative Analysis of Waste Gas Tank Samples,Per Util Revised Response to Insp Repts 50-413/86-23 & 50-414/86-23.Analysis & Calibrs Described in Original Response Will Be Completed by 860915
ML20206R944
Person / Time
Site: Catawba  
Issue date: 09/08/1986
From: Tucker H
DUKE POWER CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8609190283
Download: ML20206R944 (1)


Text

_

DM6 DUKE POWER GOMPANY P.O. BOX 33180 CHARLOTTE, N.C. 28242

"$".55.".

86 SEP 15 P l l l4 September 8,1986 Dr. J. Nelson Grace, Regional Administrator U.S. Nuclear Regulatory Commission - Region II 101 Marietta St, NW, Suite 2900 Atlanta, GA 30323 Re:

RII:GBZ 50-413/86-23 50-414/86-25 Catawba Nuclear Station

Dear Dr. Grace:

Our revised response to Violation 413/86-23-01, 414/86-26-01, transmitted by my letter of September 2,1986, contained additional corrective action we intended to complete by September 6, 1986. We have been delayed in the completion of the i:omparative analysis of Waste Gas Tank samples.

This analysis, along with the calibrations described in our original response, will be accomplished by September 15, 1986.

Very truly yours.

lh Hal B. Tucker LTP/10/jgm xc: NRC Resident Inspector Catawba Nuclear Station khk9190283860?os ADocg o30oo433 O

l'DR I

ll0 gn\\

t