Forwards FEMA Rept for Partial Participation in 861015 Emergency Preparedness Exercise.No Deficiencies Identified & One Area Required Corrective Action
ML20206R491
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/06/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
References
NUDOCS 8704220172
Download: ML20206R491 (3)


Text

{{#Wiki_filter:-. IP i APR 6 1987 In Reply' Refer To: Docket: 50-382 Louisiana Power-& Light Company ATTN: J. G. Dewease, Senior Vice President Nuclear Operations

      'N-80 317 Baronne Street New Orleans, Louisiana      70160 Gentlemen:

Attached is a copy of the Federal Emergency Management Agency (FEMA) report for

      'the partial participation emergency preparedness exercise conducted at the Waterford 3 Steam Electric Station on October 15, 1986.

There were no deficiencies identified during this exercise and only one area requiring corrective action. The State reviewed the draft report and has included the corrective action schedule in this final report. Therefore, the offsite radiological emergency plans and preparedness are adequate to protect f the health and safety of the public in the event of an emergency at the } Waterford 3 Steam Electric Station. In addition, the 44 CFR 350 approval l granted the State on July 15, 1984, will remain in effect. It is requested that you coordinate with the State and Parish agencies to ensure that the area requiring corrective action is corrected in a timely manner. If you have any further questions please contact Mr. Charles Hackney (817/860-8188) of this office. Sincerely,

                                                      " Original Signed W R. E. Hall" .gd' J. E. Gagliarde, Chief Reactor Projects Branch v'

Louisiana Power & Light Company ATTN: G. E. Wuller, Onsite Licensing Coordinator P. O. Box B Killona, Louisiana 70066 RIV:EP&SPS " C:EP&SP C:R&SP C: BC C: AI 87-095 CAHackney LAYande WLFisher JP0audon agliard 3 /a3/87 3 p6/87

                            /            JP /1T/87     N/h/87 q Q /87 ew                                                                 p 7

y

1 7-' I J-Louisiana Power & Light Company - Louisiana Power & Light. Company ATTN: N. S. Carns, Plant Manager P. O. Box B K111ona, Louisiana 70066 Middle South Services ATTN: Mr. R. T. Lally P. O. Box 61000 New Orleans, Louisiana 70161 Louisiana Power & Light Company - ATTN: K. W. Cook, Nuclear Safety and Regulatory Affairs Manager 317 Baronne Street-P. O. Box 60340 New Orleans, Louisiana 70160 Louisiana Radiation Control Program Director cc w/o report: Regional Director FEMA, Region 6 Federal Center 800 North Loop 288 Denton, TX 76201-3698 bec to DMB (A045) bec distrib. by RIV w/ report: Resident Inspector Section Chief (RPB/C) Inspector RIV File bec w/o report: R. D. Martin R. L. Bangart W. L. Fisher L. A. Yandell l R. E. Hall RPB Project Inspector, RPB ORSP~ RSB R&SPB MIS System G. F. Sanborn D. B. Matthews, IE

p.w.u.a:w . :.a5.xn:. %K.= :u&.zix2:aL;T.L. W:a. . . . u:2M.:ll ..i.i M,6 . [ T (5 Federal Emergency Management Agency Washington, D.C. 20472 m, . . i FEB l 71987 il 5 A Ji *

       ~!
  '?;j MEMORANDUM FOR: Edward L. Jordan
 >Q
  .,                                 Director R                                   Division of Emergency Prepa mdness li}                                   and Engineering Response
 ,9                                 Office of Inspection and Enforcement
 'l                                  U. jS N cle r         tory Ccanission g                  -

FIOM: Ric3ard W. rimu Assistant Associate Director Office of Natural and Technological Hazards M SUaIECI: Exercise Report for the October 15, 1986, Exercise of 1 Offsite Radiological Emergency Preparedness Plans for g Waterford III Steam Electric Station ni j Attached is a copy of the Final Exercise Report for the October 15, 1986, exercise of the offsite radiological emergency preparedness plans for the

 ;Q]             Waterford III Steam Electric Station. This was the third offsite radio-

"!j logical emergency preparedness exercise at the Waterford III Steam Electric l1 Station, and was a partial-participation exercise for the State of Louisiana 3 and the Parishes of St. Charles, St. John the Baptist, and Jefferson. This exercise report was prepared by the FEMA Region VI office staff. [; There were no deficiencies identified during this exercise; and only one area Z requiring corrective action. The State reviewed the draf t report and has

,.               included the corrective action schedule in this final report. Therefore, the

,,4 offsite radiological emergency plans and preparedness are adequate to protect . [.} 3> the health and safety of the public in the event of an emergency at the Water-ford III Steam Electric Station. In addition, the 44 CFR 350 approval granted g on July 15, 1984, will remain in effect.

         '       If you have any questions, please contact Mr. Robert S. Wilkerson, Chief, Technological Hazards Division, at 646-2860.
   ,"            Attachment

'9 r l *b y& h 7 -g-7p2.-2Gpi73-n

x, a i + y a ; g,4:. m x3,. ; q Aapcp: u

                                                                        =                   .
                                                                                                                                                                                                                                                                                                             .                  qq              x w~4.tw     ,.
                                                                                                                                                                                                                                                                                                                                                                                                                                       ~.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 .,,py q~

s

                                                                                                                                                                                                                                                                                                                                                      ^ .

J <,~ v .. ~. . : . ;*, d

  • t : _ ,, .,,

g- ':. . . N .

6. :

g* g lt3g-s. .. o . ., .-

                                                           }-. ;;; .. , _p .9.

3 ( **. _ p,. .

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      . <                                        'f;.p                N.
                                         . .y
x. ..

(4t. _ . *f

                                                                                                                                                                                                                                                                '" {t[Fy%;, g.{ yAj ..5 [ .,.64                                                                                                             } p . , . - ..
                         .;: , k +                                                   g*                                                                               .. 2 . , '                                                                                                                                                                  .b,                                                                                                                                            4 ej
                                                                                                                                                                                                                            'd.js
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ,i.                          ,,c,
                      .-;+,l;{.g[,.%.;:T*ig.                                                                    l't                       v           v.                                                                     ;-                -.             .Q[                                                                                                                                                                                       ...t                                                                                            {;4
                      . ' g' p s.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ] .). .

gn ,,....,. m ' rm cy, y' g . 7 w u. . ~. 4 c .

.+ ,. m
                                                                                                                                                                                                                                                                                  ' (q y ..;                                                                            v                             . -
                                                                . ' . ' . .-                                         .!                    '.                        . ; .                                                             , 34                                                               3.~..                      .           's                                                                         i-                            ;*                          4,,,

{, . - .. 7 r; y1 .. .;, , ( . ( 5ET e ., .. (. t r.

                                                                                                                                                                                                                                     ;f                                                                      .                       .
y. - .-
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           , .                              .; 4. . ,                          ,.
. lf . X -,c' . ,
                                                                                            '                                                                                                                                                                                                                                                                                                                                                                           '                    ~

4

                                                                                                                                                                                                                                   ,, b ., ,
                                                                                                                                                                                                                                                                                                             .y. - ,,,k
                  .                .f y .                                h j-                                                                         -
                                                                                                                                                                                                                       .                   ..,,s e p i                  Y -,j,.4                                                                                       ,
                                                                                                                                                                                                                                                                                                                                                                                        ~
                                                                                                                                                                                                                                                                                                                                                                                                                                                                            , , , . 4r . 3. ,                                ,.,p.                     _
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ,.4
                                                                                                                                                                                                                                                                                                                            .,f.}'t h
                                                                                                                                                                                                                                         ~

_ - C ., of I Y'

%,*d. L
                                                                                                                                                                    ' j                         -                   .
                                                                                                                                                                                                                                                                                           '.          ,7                    l                                                                       .
                                . eey t-
                                                                                                                                              ., e .,
                                                                                                                                                                                                                                                                                                                                                                                                                        *4,;;1'j(9%'43'
                                                                                                                                                                                           ..                               ...                                    s                          .                                                        ..                                                 .

Q .' n f. ~.vfA_,.

                             .e                                                                            2
                                                                                                                     ..: Y t*                                                                                                                                              .,               . . . .                          ,s                                                                                              .
                                                                                                                                                                                                                                                                        ...v..                                                                          A.                            . .

p y;,<f.ys.f.f. . 5 x :1.y e 3 L . .. , 4*, . g :;_ L w* +

                                                                                                                                                                                                                                                                                          . 7
                                                                                                                                                                                                                                                                                                                    . .~
                                                                                                                                                                                                                                                                                                                                                                             *c
                                                                                                                                                                                                                                                                                                                                                                                                                               *e                                                                                                       . .

y'

k. .
                                                                                                                                                                                                                         . 'Y..'
                                                                                                                                                                                                                                                                                  'e                                                          [
                                                                                                                                                                                                                                                                                                                                                                ~
,:: .) & ' !  ;
                                                                                                                                                                                                                                                      .; c'_ ,t 2.                                                  f.
 ......41                                                         c m<rs .. .w..                                                                                                                                 -                                                                                                                     . .                                                   -
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    .w <
                                                                                                                                                                                                                                                                                                                                                                                                                     . .. x -~: n Mg, s                                                                         o ..
                                                                                                                                                                                                                                                           - .                                                                                                                                                                                         . . , ,.                                                                                                  g -
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ~.; s &.

3 ...: a a ; .+ '

z. f.. .
e. .... .1;f;g$3y};f'"y:)b , % . ' [,;, .['? 3 ,... ~q. . Q l ; . /
                 .-                                                              :Q Yj.N y :                                                                                                                                                                                                                                                                                                            '~'                                   '
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   . f , $. '

ff' _ N . f.~ (:'  ;

                                                                                                                                                                                                                                            '.                  l ' "_ ff                                                                        }.l.

s

                                                                                                                                                                                                                                                                                                                                                                                                                                                                      . f                                .

A. ,

                                                                                                                                                                                                                                                                                                            . o                                                                                                                                                                                                                             ;

j

     .         , .                  '*5,'I 4 , '.
                                                                                                                                                                                                                                                                                                                                           -        s 7, 7                                                      .;                                 , ,

r... .,....c.. . .

                                                                                                                                                                                                                                             ,'g
                                                                                                                                                                                                                                                                                       .' ^ ',
                                                                                                                                                                                                                                                                                                                               .M
                                                      ' 4 [ '. '
                                                                                                                          -e       6
f. ' JP ' ' .-

y ,

                                                                                                                                                                                   '                                                                                                                                                                                     e                                                                                                                                             e                                    .<
  -E,-                                                                                                                                                                                                                                                                                                                                                                                                                                                                      g4
                                                                                                                                                   ,.,,1
                                                                                                                                                                                                                                                                        ^
                                                                                    ,,it.'                                                       :                             e                g -                                                                                                                                     S                                                                                                                                                                                                                  d       -
  • 7.1 . '/,.
                                       .......L                                                                                                                                                               - -
                                                                                                                               ,                    ,         .                                                                                                         6 ,: '                  ,.                                                                                                               .
 .'                                      '?:

g q, y '" - A ,fy .. . , >

                                                                                                                                                                                                                                                                                                                                    ,s, f
                           - J;.[f. . 3. . ys
                                                                                                                                                                      '? :                                                                                                                                                                                                                                                                                                                                                  *
                                                                                                                                                                                                                                                  &qy .

[ q,,e

                                                                                                                                                                                                                                         .:                                                                                                                                                                                                            l.                                                                                             .,
w. . . . .. , .o b* ',
                                                     .S           ,j;-[.

[' . ; - e.

                                                                                                                                                                                                                                                                                                                                                                                                                                                                   *. g t
                                =_                                          ,,              . *                                                            'g                                                                                                                                                                                ,_ , ,,
                                                                                                                                                                                                                             # Y[                                                                                                           ', g yZ                                                                                                                                                                                                    .- -                                                                          #. ~

E; . 4... @dy y: V U [% - ~. .g.y' . .g.g; ,. . ... .. .> . ,e ..

                         -l.,...                        :

4; y %p@b. .

                                                                                                              ,y                                                                                                                                                                                .t..                                         % A.,                                  s                                 ; . . 3. . .                                                   -/y                                                              ?r b
                                                                                                                                                                                                                          .                                                                                                                                                                         J                                                            .
y. $ ~
                             .; <f              "g ,1.Q.g                                       4:Q                                  3, - i. .f -

li.  %.  : .' j . . n ..,;4m,,.g , , ,',4 ; .. ' ('. , ~ .. ,']c

                                . ..                          ;.                           , , , . .                                . . . . . ~._                                                                                                                                 . . . . , . . .                                                                                                                                                                    .
                                                                                                                                                                                                              . g. ,
                                                                                                                                                                                                                                                                                                                                                  -   '^g

_._ii',s ,

                                                                                                                                                                       ' . * ; ',$ . , d ' l
                                                                                                                                                                                                . _                       A*

4 ** .. i' s

                                                                         .a-                                                                   ,                  ,
                                                                                                                          , i                                                                                                                     _
                                                                                                                                                                                                                                                                                                                                     -C      a*

E j.)J'.'.

                                                                                                                                                                  '.7<       ,
t. -

i  % -

            .c . .                 .
                                                                                                                                                                                                                                                                                                                                                                                                                                                                          +                       '

g

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 ,9 k

5' i

                                                     .*h'.' . _.'
                                                                                                                           '. __l
                                                                                                                                                                                   - g g
                                                                                                                                                                                                                                                               ~,
                                                                                                                                                                                                                                                                 *g 4 .                       , .

d 4 - . s * . p8h - -

         .a.u                                                                                                                                                                                                                                     -e                                                              :                                                                                                                     ~~

T(, ,? Q3.y } {:j,._ n } _f w fw4}f.y.;} _;[.3:l nQ .; f.,.;. ,,'.( ,p..f J -QQ.' .gy,,a

Qg p.. _

c ;g n ,, ,Q :

.p , gg -  ; _
                                                                                                                                                                                                                                                                                      $7f % Q g p f .: f t                                                                                                                                                                                                                                       $ d.
 ) , 9fs.f;k f'
m. .. v%.
y. +4,, W. 9VM .m. mw .% _
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              @.mMe A

w y, .

                                                  .m                                                                                                                                                                                                                                                                                                                                                                                                                                        <                             _.

y,;p. ~,i ', wm/xg r.4 g L . .~ .. n ym ? z y .n.

          + . : v7 [4 fd                                           s.y\:3.;4                  ?,y 9(.,                                                                 Q- Q . s ,. . ,. -h.:,;                                                                                                                                                                                . ; ,                                               : . . y.%. ; ;                                                 . s );:: ,} g :Q
                                                                                                                                                                                                                                                                                                       ,. y} ; .. ,ng,,.

r .. ,. ..  ; . ., . ., . - og . , . y .. ; _ y ... . .; :

                 , _ , _ . .        m.a.                 _ . . . . _ . . , .          ,                    __                                                       ,
   ,y * ; e J

1: - , yt%

  .r G                                                                     CONTENTS g                                                                                                                                                       iv re          AB B R EVIATIO N S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

L. INTRODUCTION AND AUTHO RITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v

p. .

C 1 EX E R CISE B AC KG ROU N D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Fr 1.1 Exercise Su m m ary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 s* m 1.2 Federal Evaluators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1.3 Exercise Objec tives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 1.3.1 Louisiana Power and Light Company Objectives . . . . . . . . . . . . . . . . . . . 3 r 1.3.2 State of Louisiana Objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 2- 1.3.3 Parish Obj ec tives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 ,i 1.4 Exercise G uidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 l 1.5 Exercise Scenario Sum mary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

     . d.               1.6 Evaluation C riteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 2 E XE R CISE EVALU ATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

[7,., .

       ~

2.1 Louisiana State Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 g., 2.1.1 State EOC (LOEP/LNED) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 2.1.2 Emergency Operations Facility (EOF) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 b, 2.1.3 M edia Relations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 ' 2.2 Local EOCs and Support Organizations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 [ 2.2.1 St. C harles Parish . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 L[ 2.2.2 St. John the Baptist Parish . . . . . . . . , . . . . . . . . . . . . . . . . . . . . . . . . . . . . ' 25

  • 2.2.3 Je ff erso n P arish . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 g 2. 3 U tility Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 f .;. ',

3 TRACKING SCHEDULE FOR STATE / LOCAL GOVERNMENT ACTION TO CORRECT DEFICIENCIES OR AREAS REQUIRING CORRECTIVE ACTION..... 33 m b 4 EVALU ATIO N O F OBJ E CTIVES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 4.1 Summary of FEMA Objectives Remaining to be Met . . . . . . . . . . . . . . . . . . . . . . 35 ((, 4.2 FEMA Objectives Tracking - Waterford 3 Steam Electric Station . . . . . . . . . . 35 r-TABLES [ s. . IC 1 Corrective Actions for the Waterford 3 Exercise . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34 I c.i. 2 Summary,of Objectives Remaining to be Met at the Waterford 3 Steam I w., Electric Station as of October 15, 19 8 6 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36 i 3 FEMA Objectives Tracking Chart Waterford 3 Steam Electric Station .......... 37 l

7. . .

l ':, a i* t III - r.

      .5.1 u:% M*m Nv=N;,             m ,f.-      ;+--     - -
. m ._ . 3.y g ., . , , . - . . . , . , , , , , , . , _ _ , , _ _ _

hpu..  ; ' 2 L a-.= u n a:cu.:. W.::m 1.&;::. Y, - ' i,~m zy\. a'c,~.wu:.w v; .-- y&. z., , yn.sd, cw.uu

                          .=.~.,c.~                                    . . ~ , ; : 1.         :
                                                                                                     - i r-                                                   '

7.-:n > w- ..

                                                                                                                                                                . :uc'
y. .

(t

  .4                                                                                                                                                                                     ,

b . ;- ABBREVIATIONS $.

  .b                                                                                                                                                                                   . . _

t Argonne National Laboratory k ANL _

  ;:)                            DOE                        -

Department of Energy

                                                                                                                                                                                       ?.

j DOT '- Department of Transportation gj EBS - Emergency Broadcast System

   '.i.N
 !,A EOC                         - Emergency ' Operations Center                                                                                         U
                                                                                                                                                                                      'E d                               EOF                         -          Emergency Operations Facility EPA                         -         Environmental Protection Agency
 .!j                             EPZ                         -         Emergency Planning Zone                                                                                       ;?
 .c                                                                                                                                                                                      f y
   ,                              FEMA                       -          Federal Emergency Management Agency
  %                              HHS                         -

Health and Human Services [

  .-                             JIC                         - Joint Information Center                                                                                               .:

R KI - Potassium Iodide

     ;                                                                                                                                                                                  *:]
         ^

LNED - Loulslana Nuclear Energy Division .a

  /                               LOCA                       -

Loss-of-Coolant Accident LOEP - Loulslana Office of Emergency Preparedness [ LP&L' - Loulslana Power & Light Company

).  ;;',-

wz mR/h - MillirerAs per hour M NRC - Nuclear Regulatory Commission , 2 PAG - P'rotective Action Guide ' PAR - Protective Action Recommendation ,,~

       ,                          PAS                         -

Protective Action Section

       ,                          PIO                         -

Public Information Officer S o RAC - Regional Assistance Committee l ', RADEF - Radiological Defense .,.

  ..a RCS                        -          Reactor Coolant System RDO                        -

Radiological Defense Officer REP - Radiologleal Emergency Preparedness ,

                               ~ SOP                          -          Standacd Operating Procedure
                                                                                                                                                                                          ~'

a USDA - United States Department of Agriculture l l i 's S!. l-Lv

                                                                                                                                                                                            .1
             , - . .        . - . . -, , , , - - , , . - . . , . . , _ , , -,. ..                         - N,. N.,- -. E , - .                    , A _ _ ,l:n.,..,,-,,,LL.

r w. --

                                - . ~ .          . .x -    -.                        .   .                      . : .a c       .     . . . -
     .f. a  .

8 1 L^- INTRODUCTION AND AUTHORITY

    .7 On December 7, 1979, the President directed the Federal Emergency Management Agency (FEMA) to assume the lead role responsibility for 'all off-site i

nuclear power facility planning and response. , {L. FEMA's immediate basic responsibilities in Fixed Nuclear Facility Radiological

      '7                      Emergency Response Planning include:

N

  • Taking the lead in o'ff-site emergency response planning and in the
   - ??                                   review and evaluation of State and local government emergency h                                    plans, and ensuring that the plans meet the Federal criteria set forth in NUREG-0654 FEMA REP-1, Rev.1 (November 1980).

r, h>

  • Determining whether the State and local emergency response plans '

can be implemented on the basis of observation and evaluation of an

      %                                    exercise conducted by the appropriate emergency response jurisdictions.

E

  • Coordination of the activities of volunteer organizations and other
     ;.                                    Involved Federal agencies. Representatives of these agencies serve as members of the Regional Assistance Committee (RAC), which is
chaired by FEMA. .
                                           - U.S. Nuclear Regulatory Commission (NRC)                                                                        '
                                           - U.S. Environmental Protection Agency (EPA)
                                           - U.S. Department of Energy (DOE)
                                           - U.S. Department of Health and Human Services (DHHS)
        "      -                           - U.S. Department of Transportation (DOT)
        - -                                - U.S. Department of Agriculture (USDA)
                                           - U.S. Department of the Interior (DOI)
                                           - U.S. Food and Drug Administration t

p *ee 4 e. l^ g i ' ,a. e,,- i {~ t.. I ( f " *y f i K'K*v'C t 'y~,m*-.' ' "jM " ':P?-, ' ' ~~" *~P-~ ~ * ^l ( W "?? ' ' ,T'[** % 's_* ,,~~*#

                                                                                                                   *"Y'  ~ * * " ~ ' " ' '   ** :***'
.=m e                     ..      .. . - , , . -..          ;        _            ,          ,           .,       __. . _ ~ -

s.- g g n C 1 EXERCISE BACEGROUND b The third Radiological Emergency Preparedness exercise for the Waterford 11 Steam Electric Station (W-Ill) was conducted on October 15, 1986. The State of f,' Louisiana and three local jurisdictions partially participated in this exercise. The initial O' qualifying Radiological Emergency Preparedness (REP) exercise was conducted February '

                - 8,1984 and all jurisdictions participated on a full-participation basis. The Federal O.             Emergency Management Agency (FEMA) evaluated the off-site radiological emergency                              ,
  ,,,            response capabilities in all three of these exercises.

mg On October 16, 1986, three meetings were held - a 9:00 a.m. meeting of the 11-member Federal evaluation team'to present their preliminary findings to the Acting RAC (". . Chairman, a 1:00 p.m. critique for the State, local and utility officials to present a short overview of the preliminary results of the exercise, and a 5:00 p.m. Public Critique at the St. Charles Parish Courthouse, Hahnville, Loulslana.

      }/
g. Section 2 of this document provides narratives, Deficiencies, Areas Requiring Corrective Action, and Areas Recommended for Improvement for each of the

- {- . participating jurisdictions and field activities tested in the exercise. Section 3 provides a summary listing of Deficiencies that would lead to a negative finding and Areas E Requiring Corrective Action, including those needing priority attention. This summary is k in tabular format and provides space for State and local jurisdiction responses and schedule for corrective actions. There were no Deficiencies found during the evaluation g,

n. of this exercise.

c :. . Section 4 compiles, in tabular format, all FEMA Objectives Met or yet to Be ( Achieved, developed from NUREG-0654/ FEMA REP-1, as well as a summary sheet of those FEMA Objectives which have not been satisfactorily met or tested to date. The findings presented in this report were reviewed by the Acting RAC Chairman [ ie of FEMA Region VI. FEMA suggests that State and local jurisdictions take remedial actions in response to each of the problems indicated in the report and that the State ' ( submit a schedule for addressing.these problems. The Regional Director of FEMA is responsible for certifying to the FEMA Associate Director of State and Local Programs and Support, Washington, D.C., that all Defielencies and Areas Requiring Corrective ,

         ;        Action have been corrected and that such corrections have been incorporated into State                            ,
      ._          and local plans, as appropriate.                            -

[, The following provides a brief narrative overview of the exercise performances  ? R. of the State of Loulslana and the Parish governments. More detailed discussions of , performances by individual agencies are provided under the appropriate location in t- Section 2. - i' i e p S P

  • e O

l*

. , .e ,~ . ._. .g. ,..   .y .; . .g . 3.,., y.7    ,

N _m:[ 3 22.AUN;.N 31S N .C.$25E M S 27:.$2J_:.c A ss $ hd45.9 N sI F [t , .. S t:, 2 ,. , M

        ' 1.1 EXERCISE 

SUMMARY

State of Louisiana Operations .q r The Loulslana State Office of Emergency Preparedness (LOEP) and the Loulslana

  ';      Nuclear Energy Division (LNED), both located for the exercise at the LOEP Emergency             _
   -      Operating Center (EOC), in Baton Rouge, Loulslana, participated in the Waterford 3 I-i      exercise. Both agencies demonstrated an adequate level of readiness for dealing with a radiological emergency. Due to the limited nature of the partial exercise, only the                      ,

staffing required to demonstrate the objectives designated for the exercise was present - at the EOC. Operations were well managed by the LOEP and LNED personnel present, and the entire (limited) staff was effectively involved in decision making. , Physical aspects of the EOC are adequate to support cesivaous operations and message boards, maps and other displays were posted and effectively used to facilitate

  • 2 the State's response function. Communications facilities, equipment and procedures, in general, functioned in an appropriate manner throughout the exercise. 1
                                                                                                              .l1 Local Government Operations                                                             I.$

Local governments participating in the exercise were the two Parish j governments located within the 10-mile EFZ, St. Charles Parish and St. John the Baptist ,, Parish, and, to a very limited extent, Jefferson Parish in a support role. These local , participants very capably demonstrated the resources, knowledge and initiative necessary

      -   to alert the populace and to implement protective actions which would protect the                  [j residents in the event of an incident at Waterford 3.

Facilities at the Parish EOCs are, for the most part, adequate and contained ff

 .        space, equipment and other resources to support continuous operations. The St. Charles Parish EOC is equipped with a kitchen and bunking facilities for on-site accommodation and off-shift staff.

Effectiveness of communications equipment, procedures, and staff was established through the activities generated by the exercise and by extensive contacts g with the EOF and other response organizations. a Detailed evaluations of performance at each locality are provided in Section 2 of

                                                                                                                     }

this report. 1.2 FEDERAL EVALUATORS . Eleven Federal evaluators participated in the evaluation of this . partial

                                                                                                                     }

exercise. These individuals, their agencies and their evaluation location are listed below: J Evaluator Agency -- Gary Jones FEMA LA State EOC, Baton Rouge (Overall Coordination) , 1 q

m _ . . . ;. . i n ,. . . ._ O 3

           ,                                                                                                                            s
     ;,              Dan Santini                      ANL              LA State EOC, Baton Rouge c,             Harry Harrison                   FEMA             LP&L Emergency Operations Facility (EOF)

Dana Cessna FEMA LP&L Emergency News Center, New Orleans 9 [ Gary Sanborn NRC LP&L Emergency News Center, New Orleans

      ~

Lee Peyton FEMA St. Charles Parish EOC, Hahnville Ken Bertram ANL St. Charles Parish EOC, Hahnville

      '.e                                                                                                                            -    ,

Gary Kaszynski ANL St. John the Baptist Parish EOC, La Place v, b Jim Cox DOT Fire Dept. Decontamination Center, Avondale '3

     '~~

Leon Zellner DHHS West Jefferson Hospital and Air Care . e 1, Helicopter Ambulance, New Orleans >

         ;           Bill Gasper                      ANL              West Jefferson Hospital and Air Care                             y l                                                                 Helicopter Ambulance, New Orleans Lee Peyton                       FEMA             St. Charles Hospital and Ambulance Service,                        l (dual assignment)                                 Hahnville                                                          ,

Y 1.3 EXERCISE OBJECTIVES - l The exercise objectives of the State of Loulslana and local jurisdictions were to ,,

    <-       1       demonstrate that their off-site emergency response plans, operations and capabilities for mobilizing and coordinating necessary resources were adequate to cope with a

[ 3 radiological emergency incident at the Waterford 3 Steam Electric Station. The

     -               objectives were developed through joint discussions between Loulslana Power and Light                                ,

Company (LP&L); the Nuclear Regulatory Commission, Region IV; the Federal Emergency Management Agency, Region VI, the Loulslana Nuclear Energy Division (LNED); Loulslana Office of Emergency Preparedness (LOEP); St. Charles and St. John  ;) the Baptist Parishes. {_ 1.3.1 Loulslana Power and Light Company Objectives

    ,7                            1. Demonstrate profielency in classifying the emergency condition.

i  ;

2. Demonstrate the ability to mobilize emergency response

!- personnel. 'l' 3. Demonstrate prompt notifications of emergency classifications r and protective action recommendations to off-site agencies. , I

4. Demonstrate the ability of LP&L Emergency Response Organt-zation to establish command and control and maintain continuity 4c.

of command and control throughout the exercise. 1

 *    , j -
  • n .s 73e,e . .,,.y y , , . ,,, , ,, ,
                              -       -   - - - <               s s-        ,   -    .   - ,,, _ _ _ . . . _ _ _ . _   ,   __,,:a,

m c. ,.4 ,L a .a, .n .,L:%.x

                                                                                        . . m, . . e ,., ., , .n
             . M,;M, . --.;e. 1.
                              % D M,is+',;,.     , 7 . . ,~.w.c
v. i c.u.5:: a ak. - L O.:v= A .i:.a,:3.,a:.h,u!. u.

2 . . 4 .

                                                                                                                                  ..?

9

5. Demonstrate adequate and effective use of emergency communi-cations equipment and communications methods and procedures.
'j; _

Demonstrate the ability to develop, coordinate and disseminate ,0

         ;                   6.

timely and accurate public information bulletins.

                                                                                                                                 ")
 ,f T,
   ~:                                                                                                                           :q g!                          7. Demonstrate the ability to provide on-site first-ald and obtain appropriate off-site medical care for simulated injured
                                                                                                                                -]-

contaminated personnel.

8. Demonstrate the following activities related to response to a -

simulated fires on-site Fire Brigade response, the ability to , obtain off-site fire department assistance, coordination of off-

 -a                                 site fire department and on-site Fire Brigade response activities on-site.                                                                                    .

7,

  .'                                                                                                                              ,j Demonstrate the ability to perform on-site and off-site
                                                                                                                                     ~

9. radiological monitoring and assessments and off-site dose projections necessary to provide advance warning to Parish, State and Federal agencies. a 10. Demonstrate the adequacy of the LP&L emergency response 3. facilities to support emergency response activities.

11. Demonstrate the ability to conduct High Radiation area reentry and recovery activities within the plant.
12. Demonstrate coordination of protective action recommendation -

decision making activities with NRC (if NRC participates) and

        >                           Loulslana Nuclear Energy Division in the Emergency Operations Facility.                                                                                    -
      $                       13. Demonstrate the following accident mitigation activities:                                  '

accident analysis and accident mitigation decision making, use of the Post Accident Sampling System to draw a preliminary sample

under postulated accident conditions, sample analysis activities. . ,

b 14. Demonstrate recovery techniques in the ability of the organiza- ), tion to de-escalate emergency response activities, to reclassify l (down-grade) the emergency classification, establish a long term u recovery organization and discuss planning for recovery

       ,                             activities.                                                     .
       ;                      15. Demonstrate the ability of the organization to disseminate i,'

information to other participating organizations (Parishes, State . ..

and Federal). 1
                                                                                                                                       /

I I i

                                                                                                                                    -{

[ . t I

ax. . Tw-. . . . . .n. . - - x .-

  .'                                                                      5 rs                                                                                                                            i
16. Demonstrate the ability to perform a site evacuation and off-site 4' assembly by evacuating site personnel to parking lot and sending a '

select group of personnel to an off-site assembly area. i  !

17. Demonstrate accountability after a site evacuation and
  ,                                     continuous accountability for emergency response facilities.                       '
18. Demonstrate security measures at each of the LP&L emergency (
  "'     ,                                response facilities.                                                               .

7 ' I 1.3.2 State of Louisiana Objectives

1. Demonstrate the ability to make decisions and to coordinate l j~ emergency activities, t-
2. Demonstrate the ability to communicate with all appropriate [

locations, organizations and field personnel. l L 3

3. Demonstrate the ability to determine appropriate protective measures based on PAGs, available shelter, evacuation time f;

i estimates and all other appropriate factors. . Demonstrate the ability to brief the media in a clear, accurate and T 4. m .. timely manner. 3 i- 5. Demonstrate the ability to provide advance coordination of p F D information released.

6. Demonstrate the ability to identify the need for, request and

[' t obtain Federal Assistance (Media Center only). g-

7. Demonstrate the adequacy, operability and effective use of "

emergency communications equipment and the adequacy of i' communications procedures and methods. *

  <                               8. Demonstrate the ability to monitor EOCs continuously and implement procedures in a timely manner.                              .         . ,

i.e 1.3.3 Parish Objectives - e

                                                                            ,                                              f.

u,. St. Charles Parish (Partial Participation)  ;

1. Demonstrate ability to make decisions and to coordinate '

emergency activities. . e ss

          *I'  b$ #g  fT%  @g 6    y  p     , , , ,     9,   4 g, p q   _     ,
 $.2 A[d:52d[1NNbh.ilb N G i-
                                                                                NS.5: @ d 2 d if$ $IS $ O 5I.T[ 5 6 5 !' .SME MF      .
                                                                                                                               ,~

I

     'm                                                                                                                         .

6- .f 4

          .                       2. Demonstrate the ability to communicate with all appropriate
 ,                                      locations, organization and field personnel.                                                      '

n 3. Demonstrate the ability to brief the media in a clear, accurate and  ;- i timely manner.

    .9                                                                                                                         ,..

y 4. Demonstrate the ability to provide advance coordination of ,-

                                                                                                                               ~

Information released. 8 . Demonstrate the adequacy, operability and effective use of

 *u                               5.                                                                                               {
    ,                                  - emergency communications equipment and the adequacy of
    'j b

communications procedures and methods. v v,

                                                                                                                               ~

a

8. Demonstrate the ability to monitor Eme:gency Classification Levels continuously and implement procedures in a timely manner. m
 .g;                                                                                                                                .
   'g                             St. John the Baptist Parish (Partial Participation) pt E.j
1. Demonstrate the ability to make decisions and to coordinate 3 emergency activities.  :

n?

2. Demonstrate the ability to communicate with all appropriate ,~,{

locations, organizations and field personnel.

                                                                                                                                  ~,.
3. Demonstrate the adequacy, operability and effective use of emergency communications equipment and the adequacy of
                                                                                                                              .]

communications procedures and methods. :p st g, , V 4. Demonstrate the ability to monitor Emergency Classification Levels continuously and implement procedures in a timely manner. .' I: Jefferson Parish (Partial Participation) }, 1. Demonstrate adequate equipment and procedures for i <e decontamination of emergency workers, equipment and vehicles. a >

  • - 2. Demonstrate the ability of EMS transportation, personnel, g',

facilities and procedures for handling contaminated individuals. y ! '. 3. Demonstrate the ability of hospital facilities and procedures for ~ + handling contaminated individuals. 1.4 EXERCISE GUIDELINES To define the scope and extent of participation by organizations and exercise "

                         " players", the following exercise guidelines are established in order to meet the
objectives !!sted in 1.3 above.

I e

             . _ . _ _ =   -.        m. _ _           _ _         _ _ . -        . _ _ . _ .   ._    _  __m ,  u_ .

_.. __r

a . . . . . m ;,W_e ?. . i.. . .

                                                                                                      ,~~      ~
                                                                                                                      , 7   7  7' 7

b... A. General , The partial participation exercise will be conducted on 1. I. October 15, 1986. Exercise " players" will not possess prior

  • knowledge of the exercise start time, and will follow normal 7, routines for that day until mobilized as part of the emergency I- response, ,

P 2. The exercise will commenee with a postulated plant coridition

    *:                                      necessitating a declaration of an Unusual Event and escalate through each of the four emergency classifications to a General Emergency.                                                                      h
    '.u                                     The postulated accident conditions will result in a simulated 3.

radiological release which requires the consideration of '_ ih *: b protective actions for the general public. participants will perform, as appropriate, c l'. 4. Exercise L' radiological monitoring and dose assessment activities. { r

5. Radiological monitoring field teams will be dispatched in {.2 u order that response time, communications and monitoring b procedures may be evaluated. p Each utility radiological monitoring field team will be f accompanied by an observer throughout the exercise. !i.

y

6. The Emergency News Center will be staffed and activated. -

Members of the media will be invited to participate at this center. News bulletins will be made which depict simulated Q

l. '

exercise events. However, no exercise press bulletins will be t- f} made to the public. Q

                                                                                                                                    'd b-                                  7. If required by the scenario, the treatment of a simulated                              f(

injured on-site worker will involve the movement of the R "9 individual to, and full participation by, a support medical { F. ' facility. , if

   %                                   8. If Postulated accident conditions warrant evacuation of non-                           (

< h_ essential site personnel, selected personnel will proceed to the selected off-site assembly area. All other non-essential . personnel will be -evawated to the, station parking lots or [ 7l(1 accounted for. Once assembly has occurred and 3 I accountability procedures have been completed, personnel will y return to their normal work stations. ,,

9. The Emergency Fire Brigade will not be staged and will not participate in the exercise. -

{ e j Let V:* ** em. = : pee,=w o ,e ,,.,.m. .- ,, ,,

    ,[O                                   t                                                                       _
                   ~*?.'    f*<M ' .       G "l N                             3

Q 2 L.u:1 ElDi$Ie M M dLL l,'G L _. .bK';R H 2; 3 Q @ W ? .g i.,___._. ; e 2 { . f.. - p.] .

                                          -                                                                                 ,1
     -                                                 8
10. Exercise participants will include the following emergency .

organizations:

        ,,                                                                                                             :)

Loulslana Power and L!ght Company . '.1 ;l1

s (j Onshift Emergency Organization (Control Room)

F .'.j On-site Emergency Organization (TSC-OSC) ~ Near-site Emergency Organization (EOF) [*] - Off-site Emergency Organization (CCC-ENC)

                                                                                                                 .n f4 LP&L district offlees and electrical maintenance                                      :
   '. ' ,                                                                                                        "l             1
         /                 divisions        will  not participate in this exercise.
       ;                   Communications with these groups may be initiated by                                g their response will be simulated.
g. : 7,.,;

Off-site Organizations ,z

       !'                  State of Louklana Loulslana Nuclear Energy division -
                                                                                                                         .I Limited participation. LNED will staff the Waterford 3 EOF Positions, and provide State                          3,

(( ' EOC liaison. #l' Louisiana Office of Emergency Preparedness - Limited participation --.

      ;                                                                                                          .)
                                                                                                              ..-1
                                                                                                              ~

St. Charles Parish

  ',                                Department of Emergency Preparedness -                                     ~^
,                                        Limited participation
                                                                                                               - r I                 St. John the Baptist Parish Office of Civil Defense -
"                                                                                                              , d. .
        ;                                Limited participation                                                 ....
    -                      Jefferson Parish                                                                   3
                                                                                                              .v

- Office of civil Defense - Limited participation -. F St. Charles Ambulance Service Transportation of contaminated injured person J 1 West Jefferson General Hospital Air Care 7 i

                                                                                                              ^"

Transportation of contaminated inured person 3

                                                                                                             *t.

J

                                                                                       ' ' ' ' '          ~~

s - -.

                                                         ~,     -        , , , . , , .           - - ,
                                                                                                              ~~

c.... . . . . . ...:.. . . . A . .. .- . r

  .<                                                                       9 i                                    West Jefferson General Hospital                                              .

[~ Reception and treatment of contaminated injured L- person NRC Region IV will actively participate in the exercise. {Z-

  'J                                       Region VI personnel will staff the TSC and EOC NRC facilities.

X E. 11. Activities, Functions or Operations to be simulated: 1

'S a. Radiation Monitoring System (RMS) c, L'
b. SPDS/QSPDS -

7.. ~ U' c. CEPADAS

12. In the case that the St. Charles Ambulance is not able to respond, T a licensee-owned vehicle will be staged at the Administration { -

Building ' for use in transporting the injured person to the [' ' hospital. If it is necessary to use this vehicle, the Shift l.. E Supervisor / Emergency Coordinator will be instructed to assign a driver to the vehicle. . y-e. If the company vehicle is not used, it will be released for normal use following the departure of the ambulance. / h 13. The postulated accident conditions will not require response by m the Waterford 3 Emergency Fire Brigade, or by an off-site support fire department.

14. All emergency communications that relate to the exercise shall be clearly identified as part of the exercise. Verbal communi-cations shall be initiated and closed by the statement "THIS IS A e. .

DRILL". . .

?

[. 9 NOTE

                                                                                                                           ;)

F P'c Care should be taken to assure that individuals who may overhear F., ' or see the exercise activities are not misled into believing that an actual emergency situation exists. , SU . If L,; 15. Methodology and assumptions related to the development of data for specifle areas are provided in the exercise scenario. r, B. Safety Precautions

1. Valves, breakers and controls shall not be manipulated in
%                                          response to this drill.

I 's - ' ' L ', s< . i L ~. F.;

                   * {y.; s py p- .--- -     f -- q .- y ~        ..  .
                                                                             . y.y. .          .     ,     ,.    ,   ,
                                                                                                                       ,,[,
   };S.55 M M '$5EiL M W .                              .: ~ G. 252$0050.'[$.$
                                                            .                                            $ $. ! "' A '*" U I
   ??                                                                                                               ,         .

s . . . ,

                                                                                                                          1 10                                                   , ,e.;
2. Portable fire extinguishers or other sealed canisters or 17-equipment shall not have the seals broken or pins removed as part of this drill. . . ,

i Q, (Q '" '" b.:. 3. Personnel will not, in response to this drill, take any action

   'd                                 which jeopardizes plant or personnel safety.                                         ,,,

a a W

                                                                                                                           ~

In the event an actual emergency occurs during the conduct of I.. 4. this drill, the Emergency Coordinator shall immediately - y, contact the Shift Supervisor and coordinate the available @ resources to mitigate the emergency.

                                                                                                                          ~ c)
s y - In the case of an actual fire report, the " Drill Shift" will provide initial response.
                                                                                                                           ]"

w .b N

                                      -    The drill clock and activities can be stopped at the                            [H discretion of the Emergency Coordinator and the Shift
   '#  -                                   Supervisor until the actual emergency is addressed and/or                       ,

under control. ' N,,

t
                                      -    Quallfled drill participants can be directed to support the
Shift Supervisor on response to the emergency. .w All drill participants who enter the RCA will be radiation 5.
       '~                              worker quallfled.                                                                  _7d
   $.                            6. Drill personnel will observe all radiological controls. In the                      _

.j event that the data presented in the package indicates lower , radiation levels than actual, the Health Physics Controller and

the Lead Controller will be informed and actions for the higher readings will be observed.
                                                                                                                         ",l
i. .

7. ALARA concepts will be observed during the course of the ,"'

   .c drill. Activities associated with the performance of the drill                         -l. '

l3 ' will not occur in areas where personnel will receive significant exposures. -, ,

                                                                                                                              .. b l-1.5 EXERCISE SCENARIO 

SUMMARY

f.' .f 4' I. The sequence of events hypothesized is provided to test the integrated emergency response capability of organizations established to protect ,

       '                    the public should an actual emergency occur and includes postulated                                 "

failures which could conceivably cause fuel failure. The scenario is not entirely realistic nor all-inclusive in allowing credit for engineered .., safeguard systems or personnel actions. The sequence of events pro- " l vides a basis for a sequence of resulting radiological parameters on which to base this exercise, but does not necessarily represent a , possible real sequence of events. j l __ _ _.-_. __ w. .: .u- c. _ a. _ .-

                                                  ,      u - - , .                                      --- .        -
   ..                       ~. -      -.-~...a       - . . .e . .         .: .a..- ~           --     .
                                  ~
  . t*  ..
    ~                                                   11 The scenario is based on a series of events which include an earthquake,                            >

t loss of shutdown cooling, loss of all AC power, a stuck-open pressurizer [' valve, fuel failure, medical emergency and a radiological release to , L atmosphere via the plant stack.  ; The plant has been operating at an almost 100% power for the last 30 [ days after a refueling outage. . Systems / Components Out of Servlee l r (.{- .

                 "A/B" Charging Pump - Severe packing gland leaks. Packing is on

- (~ order. ( "A/B" HPSI Pump - Bearing failure. Replacements will be on-site 10/16/86. T. . i .

t. .
                 "B" Emergency Diesel Generator 'rurbo-charger bearing failure                                     f'
                                                                                                                    ,s p
 } ,,,           "A" Emergency Feedwater Pump - Operating in the " alert" range for                                o vibrations (ISI Testing). The pump has not been declared inoperable.

p n

 .',             "B" Low Pressure Safety Injection Pump (LPSI) - A PM is being done on the pump. The oil is being changed and lubrication of the pump is in p                 progress, with surveillance expected to be complete by about 0930.

(- At 0735, an earthquake is felt in the plant. An Unusual Event will be .

  "               declared. Notification will be made to appropriate personnel and
    %.            agencies. hilowing the earthquake, at 0820, the Control Room will receive a report that the discharge piping on the "A" LPSI pump is leaking and water was sprayed on the motor. A piping flange has

{ t, cracked and the contents of the line have leaked on to the pump motor. An in-line check valve prevents further leakage. In order for the "A" LPSI pump to be operable, the weld must be repaired. The "A" LPSI pump is declared out of service. Both trains of shutdown cooling c x. are now inoperable. This condition results in the declaration of an Alert at about 0830, i-The Alert declaration initiates the mobilization of the On-site

               emergency Organization (TSC-OSC) and Emergency News Center staff.

The TSC and the OSC staff begin arriving at their respective facilities [ prior to 0900. The earthquake also causes a misalignment of the limit _

<-                switch and a shorted contact in the pressure switch associated with                             f n'               containment vacuum relief isolation valve CVR-201. The result of the                            i damage to these switches and a failed indicator light is that the valve (CVR-201) moves off its seat but indications on the Reactor Control Panel are that the valve is closed. Computer point indicators (SPDS)

[- show that the valve may be in the mid-position. The fact that a breach of containment has actually occurred may not be evident untillater in [(: h Le.. i-9 . ; ;p m-e.pgnn.7 gm. - ,~ - .m p- j.

EMMQ2igL._

  • WGQ$IMfQQQM3MM9..y.-Q
  .j                                               .                                                                       .      .
                                                                                                                                     .s i ,.

12 .c l, the exercise when a release occurs following failure of the Pressurizer t Quench Tank Rupture Disk and Safety Injection Actuation Signal. k At about 0900, a report is received that preventive maintenance checks 3 i] on the "B" LPSI pump are complete and the pump is operational. y -- 'I! At 0940, a total loss of all AC power occurs. As the Reactor Coolant }' Jj Pumps coast down, a Reactor trip occurs on low DNBR. The loss of Ti power begins with a loss of off-site power and is complicated by the & failure of the "A" Emergency Diesel Generator output breaker to close

]

,,;' when the diesel starts. A station black-out occurs. A Site Area

?                                              Emergency is declared.        The Near-site (EOF) and off-site (CCC)                    n 3                                          Emergency Organizations are mobilized. At 1010, the "A" Emergency               ;

Diesel Generator output breaker is closed, restoring power to some q systems and components. 77

                                                                                                                                         ~

At 1012, the "A" EFWP falls. A relay recalibration is required before

     ]                                          the pump may be restored to service. This pump will not be restored to         q service until after the steam generators boil dry (1230).                             ;.{

J: l ',;' At 1055, the operating Emergency Feedwater Pump (A/B) falls. By - about 1227, after the steam generators boil dry, the pressurizer relief -

       -                                        valve lifts.
                                                                                                                               ~

n When the pressurizer relief valve lifts, it sticks open and will not '!f ] resent. At about 1230, the quench tank rupture, disk ruptures relieving J:

       -                                        the quench tank to containment atmosphere. A radiological release                r
                    --                          pathway is provided through the faulted containment vacuum relief             :.; ,

valve and Shield Building Ventilation System to the atmosphere. A

     .~                                         General Emergency is declared.                                                       --
                                                                                                                                ..u The release will continue until the containment vacuum relief valve is y                                              secured.                                                                       <3.

'>? .nl I The Shield Building Ventilation System is considered to remain operating throughout the event, for the purposes of this exercise. ' ,, When the ability to feed the Steam Generators is restored, a controlled - - I cooldown is initiated. [: !. At about 1305, a medical emergency occurs that will result in the g y' request for assistance from land and air ambulance and off-site medical facility support. During this part of the exercise, a simulated ,

  '                                              contaminated injured person will be transported to West Jefferson general Hospital.

By 1430, the containment vacuum relief valve will be closed, securing  ; the release. When the response organization verifies that the release has been terminated, a de-escalation of the emergency condition can occur.  ; e *

                                      ,       ,         =   .
         . - -              -            -         ,          .a.         . . .    .      . w .-a .       . . . . .

p' . 13 E At 1515, this portion of the exercise will be complete and facility critiques will be conducted and preparations for the recovery portion of i~ the exercise initiated. E - Senior exercise participants will meet the EOF Operations Room and recovery discussions will be conducted. ,' F O. - The exercise will - be terminated upon completion of recovery

      ".                      discussions (about 1700).                                                                                           -

7 1.6 EVALUATION CRITERIA The Waterford 3 exercise evaluations that follow in Section 2 of this report are e based on applicable planning standards and evaluation criteria set forth in Section II of NUREG-0654/ FEMA REP-1, Rev.1 (Nov.1980). The exercise was evaluated using the h  ; modular format evaluation forms. 7.- Following the narrative for each jurisdiction or off-site response activity, + L Deficiencies, Areas Requiring Corrective Actions and Areas Recommended for Improvement are presented with accompanying recommendations. Any identified  ;

              .      Deficiencies would result in a finding that the off-site preparedness is not adequate to                                 .
                   provide reasonable assurance that appropriate protective measures can -and would be                                     U taken, to protect the health and safety of the public living in the vicinity of the site, in                                s
' g~,                the event of a radiological emergency. At least one Deficiency in this category would                                   -

result in a negative finding. , i f Areas Requiring Corrective' Actions include those activities where performance ., (- demonstrated during the exercise was evaluated and considered faulty; corrective actions are considered necessary, but other factors indicate that reasonable assurance could be - given that, in the event of a radiological emergency, appropriate measures can and will !U be taken to protect the health and safety of the public. This category should be ,

,                    relatively easy to correct in comparison to those classified as Deficiencies.
[-

![ Areas Recommended for Improvement are also listed as appropriate for each jurisdiction of off-site activity. s am hi

       ' i.

g - 6 k; 71 m-y e ,.. ,vm ,. , .~ g_ .. _ _ . _ . . .  ;, ...,._y_.- .. . _.. .. . . _ , . . _ _

  < y                         ; ",. ~ 's,'f " ,* F. T-
                                                                                                               ' * * ;[ < s     ' ;. .%

_,,e

;g ,r
                                                                                                                                       . L ,[
                                                                                                                                            "s',' 'K# ;,r
                                                                                                                                                        . l ,1CC.
                                                                                                                                                              .K*8' .2'.'.
                                                            .. ;3y .,                                                                                                            _
  . i t '.4 st s ' 42, .C % .a    *
                                       - -%     4 -        ! #_'t'du. .' ML.*. . el 3 ' : d'
                                                                      ,                      ' 4 O na.35 ~ -
                                                                                                                    -f s G _.4 - -'              -
                                                                                                                                                                               <. I n it.
   .i.z
      , f                                                                                              e n

t * ;,

              ?
    .: s,.

14 ..

                                                                                                                                                                                            .a 9

pp a Ij

     ,'..                                                                                                                                                                                   3   -
   .d
     , i.

A j% > e t* h & k'

')i-a

{% v4 . I '#, t i - n *

  - r 9
        $.[1                                                                                                                                                                                   * *i
                                                                                                                                                                                                       }
                                                                                                                                                                                                  -6 t*
  *E                                                                                                                                                                                                     >
        *4 a                                                                                                                                                                                                . b
  ..,                                                                                                                                                                                     . . I.

r e eP

                                                                                                                                                                                             =

s

                                                                                                                                                                                             .1
  • p) i.
      .                                                                                                                                                                                 . . -)

m

                                                                                                                                                                                               -.I
   ~                                                                                                                                                                                                   t
                                                                                                                                                                                            ~,s a

t m (

                                                                                                                                                                                            .J O

ra t . _ _ .. ..

                                                                                                 ~   m   -
                                                                                                                             -   - -' -- =
        .?  . . .

j

  '"                                                                  15 m-
 ?

h 2 EXERCISE EVALUATION I

~f3                                                                                                                                           ,

L On the basis of general criteria set forth in NUREG-0654/ FEMA ERP-1, Rev.1 (Nov.1980), and exercise objectives and observations, an evaluation was performed of i. U the partial exercise of the Waterford 3 Steam Electric Station on October 15,1986. This d evaluation is presented herein. FEMA Region VI will maintain close liaison with the

v. *'

State and local governments in determining the corrective actions (including time frames) needed to resolve any Deficiencies and Areas Requiring Corrective Actions in

                  .accordance . with established criteria and guidelines. There were no Deficiencies identified during this exercise.
p,e  ;

L 2.1 LOUISIANA STATE OPERATIONS [.' l 2.1.1 State EOC (LOEP/LNED) , 4. e-  %' NARRATIVE

  • The Louisiana State EOC is located la the basement of the Land and Natural h~ Resources Building in Baton Rouge. Activation and staffing were not exercise e objectives, but the LOEP and LNED were staffed adequately to demonstrate FEMA C

I' Objectives #3 (the ability to make decisions and to coordinate emergency activities), #5 (the ability to communicate with all appropriate locations, organizations and field

y. personnel), #32 (the ability to identify the need fcr, request and obtain Federal assistance), #36 (the adequacy, operability, and effective use of communications equipment and the adequacy of communications procedures and methods), and #37 (the ability to monitor Emergency Classification levels continuously and implement j[r procedures in a timely manner). All five of these objectives were met.
  ,                              The communications room staff handled their duties in an effective and

(' professional manner. Communications equipment was adequate, and pz: mary and ' secondary units functioned appropriately, with only minor exceptions, which will be noted. Message handling was done well, and message forms were generally used j'j" effectively and according to the plan. The " bug" in the hotline which was present in the prior Waterford exercise was corrected and the hotline worked consistently. Minor flaws 7, with the hotline involved the variability of volume levels and the difficulty of operating L_ the telephone receiver / sender. The volume level on the hotline telephone and table-top speaker is not consistent and was occasionally weak. To send or receive with adequate

          .           telephone speaker volume, a button on the telephone receiver must be depressed.

y"- Keeping the button depressed can be difficult with long and/or repeated messages. It is desirable to improve the controlability and dependability or volume of the hotline. The ,. copier which is used by the EOC message runner was out of order in the morning,

h. _. ' . requiring repair. Although there are back-ups, the back-ups are the fax machines in the
  '                   communications center which are not adequate to cope with the volume demands of a real emergency or full exercise. The LOEP should keep the EOC message runner's copier l'

t- , II I. L

                                                                                "** *
  • 7] !* ***W*e
                                                                             *                               , - +-;

A '[ " g [ en g* [ 1p .- = q _

  • y G.ji5 ,' . l ji/Qf,g.g{M&di.;,ggy Lgf@ f.gg ' jQCm j
}

16 q in a good state of repair or, if the copier is unreliable, purchase another. The LOEP Message Form was not consistently used. The Department of Public Safety Facsimile Transmittal Form, which was often used instead, does not have enough detail and does 7 y .~ not provide a record as good as the LOEP Message Form. For messages other than those calling for LNED Form 100, the LOEP communications staff should consistently use the q LOEP Message Form. 3 S. D] [ When the first fax message was transmitted to the JIC, the telephone line at the JIC was busy for 15 minutes. Although this problem was solved and the line kept clear "' S for remaining messages, the unusual behavior of the telefax machine at the EOC should ' .; _ be remedied. Instead of giving a busy signal when the JIC line was busy, the machine transmitted to another location in the Land and Natural Resources Building. LOEP should determine what caused the improper transmissions by the telefax machine when 7 D ~ the JIC receiving telephone was busy, and should fix the problem. O Alerting and Notification through EBS messages sent to WCKW by St. John's Parish was accomplished, and copies of the messages were sent to the State EOC. The 'n , 3 Parishes assumed full responsibility for EBS messages. Consistent with the plan, only @ WCKW-FM and her AM sister station issued EBS messages, although the capability to q issue the EBS messages over several other radio stations exists at the State EOC. .; J: . The Assistant Secretary of the LOEP was in charge of the State _ EOC ]f operations. The EOC was also staffed by the Assistant Secretary, Office of Air Quality r and Nuclear Energy, an LNED technical liaison representative, a technical liaison "'4 . representative from the utility and other staff membe.rs of the LOEP. As stated above, y i FEMA objective _ #3 was adequately met. Direction of operations was well managed, ,] 7 including effectively keeping all EOC staff members involved in the decision making process. There was good coordination between the State LNED administrator, located at ", the EOF, and the key staff members at the State EOC. Even though it was not an objective for the exercise, status boards and other displays were effectively used to facilitate the State's response function. The State EOC staff operated out of the

 ,o                  executive conference room whleh was adequate for this partial participation exercise.           j FEMA objective #32 relating to the State of Louisiana requesting and obtaining Federal assistance was also adequately met. When the " Alert" classification was             m}

received by the Communications Center at the State EOC, the communications officer wrote on his log to contact FEMA Region VI. He simulated that a call was made. After the controller realized that a call had not been officially made, the communications " f. officer was requested to do so. A call was then made to FEMA Region VI but the verbal request was not precise enough to cause him to give a proper message to FEMA Region , VI. The LOEP officer in charge appropriately then made another call to Region VI i A requesting Federal assistance. Region VI deployed a Deputy Senior official (simulated) and a public information officer (PIO) to the LP&L emergency news center. The Region VI PIO participated in the exercise at the LP&L emergency news center.  ; y \ In summary, the limited objectives of this partial participation exercise were

     ~

met by the staff and equipment at the State EOC. State EOC activity was slow in the 7 afternoon as a result of limited scenario events and limited State goals for the exercise. - Aside from these shortcomings, the scenario was adequate to allow the State to demonstrate the agreed-to objectives. i I'

          -._ .: L        - _ a :. a          -
                                                                                                                       ~

_. . . . i .- u -. . isc., .' _ .. . f 17

      .             DEFICIENCIES:                                                                                                ,

j ~' NONE. L: .

                   ~ AREAS REQUIRING CORRECTIVE ACTION:

(' NONE. l.

                   . AREAS RECOMMENDED FOR IMPROVEMENT:

a

Description:

The copier which is used by the EOC message runner

   . f~                        was out of order in the morning, requiring repair. Although there
      ,,                       are back-ups, the back-ups are the fax machines in the                                               -

J. communications center. In a full scale exercise (or emergency) this could have become a problem. r, ,

       ;'                      Recommendation: Keep the EOC message runner's copier in a good
      "~

state of repair or, if the copier is unreliable, purchase another.

Description:

The Louisiana Office of Emergency Preparedness Message Form was not consistently used. The Department of Public Safety Facsimile Transmittal form, which was often used instead, I.

    }',

does not have enough detail and does not provide a record as good as ' the LOEP Message Form. The Notification Message Form used by the Communications center was an old form. , Recommendation: Consistently use the LOEP Message Form for ., .. emergency messages, except only when the LNED 100 message form e is specifically called for.

                                                                                                                                    ~

7

Description:

When the first fax message was transmitted to the

     !u                        JIC, the telephone line. at the JIC was busy for 15 minutes.

Although this problem was solved and the line kept clear for I

     ,s                        remaining messages, the unusual behavior of the telefax machine at

, l .' , the EOC should be remedied. Instead of giving a busy signal when the JIC line was busy, the machine transmitted to another location

     ~

l , l ,., in the Land and Natural Resources Building. L "p . Recommendation: Determine what caused the improper trans- ,

    ,.                         missions by the telefax machine when the JIC receiving telephone                                ,

i p.- was busy. -

Description:

The volume level on the hotline telephone and speaker  ; is not consistent and was occasionally weak. Keeping the button ' ~ " depressed to keep the volume up can be difficult with long and/or y repeated messages. , u.' l

    .;n mg;y 's,.qy ? -      -
                                 .;_ - , m 3 y y c,-              ;  ..,.g.   ,

7.- ,,m ., ,.

1 J ';W..u. (;-?;; g~.  ; 5.r-y:...r p:.g-., _ ; mpq

                                                                                                                                 ,       _"_~     ,

(5. p;;. ,= 3. .-y.,9. . 7 . q. W ww- :';? % W yJ.w. .u. w . .-~ aa. - . . - . . ~ w - -. 3.y v . . .

 ;ti
h
                                                                  ~

18 .- ?)

       .~                                                                                                                                         .-

Recommendatiom Improve the controllability and dependability of ~ 7 volume of the hotline. n f .\ *

                                                                                                                                               ~

2.1.2 Emergency Operations Facility (EOF) +

                                                                                                                                             ,.s y -
%j .                                                                                                                                         1.,

a

     ..l,                   NARRATIVE fr:                                   The Waterford 3 EOF is located in a tri-purpose facility .which houses the                             [<

Visitor's Center, the Plant Training Facility and the EOF. Its design provides for Y effective emergency operations. From the point of view of making and coordinating . Dose Assessment Activities, the physical layout is nearly ideal. The utility's Dose - Assessment office is adjacent to the room allocated to the LNED Dose Assessment 3 office, and there is a connecting door. Furthermore, this pair of offices is directly 1 across a corridor from the Radiological Asaressment Coordinator in the Commind Room, and is additionally connected by a dedicated intercom. [ A LNED Liaison Team was dispatched from Baton Rouge to the' EOF when the 9 Site Area Emergency was declared (at 9:52 a.m.) and arrived at the EOF approximately - [ one hour later. At 11:20 a.m., shortly after the declaration of General Emergency, the EOF announced to all parties concerned that they had assumed responsibility for a emergency operations. Due to the limited nature of the partial exercise, with field i

   ;;                       monitoring not being an objective, the LNED team 'had only utility input for dose                                          ,

(, - assessment activity. The utility field team coordinator did, on many occasions, come to i .' the LNED work area and announce a dose assessment (and assume reasonable agreement) ]- before passing the information to the Radiological Assessment Coordinator. The Radiological Assessment Coordinator evaluated the data provided and posted it on the .j. . . i.( status boards near his station in the Command Room. These status boards are easily - - 'T" visible' to the LNED Liaison Officer at the front center of the Command Room. He _ ,3 reviewed and evaluated data from the boards and placed calls to LNED and LOEP to . [' provide Information and make recommendations. The evaluations made by the LNED - lf Liaison Officer demonstrated the ability to determine appropriate protective measures based on PAGs, available shelter, evacuation time estimates and other appropriate factors. Overall, based on the information given LNED, their response actions were ~k appropriate and conservative. Communications equipment functioned well throughout the exercise. The EOF  ;' communications room contains dedicated telephone lines, commercial telephone lines and State Civil Defense radio for communications with the State and local EOCs.

                                                                                                                                                 ]1, DEFICIENCIES:                                      ,
                                                                                                                                            ]z.;

None.

                                                                                                                                                    -l r..          -_     3 ., _        _ , , ,.       .m- _  _
                                                          ..__m._     _,,,w.=  m_ .        . . .m   - _ . _ _
           -                                  .        - .         = .. L . a:..   . .   : ;.a : ...:a  .:.                 .

q r - 4.. gg L AREAS REQUIRING CORRECTIVE ACTION: , p- None. t p AREAS RECOMMENDED FOR IMPROVEMENT: p None. p.. 2.1.3 Media Relations 7 NARRATIVE , f Three FEMA objectives, 5, 24 and 25, were addressed at the LP&L Emergency P News Center (ENC) in New Orleans. All were met. f., Objective No. 5 (demonstrate the ability to communicate with all appropriate

v. locations, organizations and field personnel): The representatives from LOEP, LNED, the Governor's Office and St. Charles Parish demonstrated their capability to communicate f.

with all necessary locations to enable them to carry out their roles as spokespersons. L-Objective No. 24 (demonstrate the ability to brief the media in a clear, accurate

          ,      and timely manner): Clearly, the plans, procedures and facilities provide for gathering                     .

necessary information, ensuring its accuracy and disseminating it promptly to the news media and the public. However, there appear to be a few problems which pose the potential for confusion and even a loss of credibility.

    }?,

t In one instance, the State PIOS entered the second news briefing with the intent of discussing only those protective action recommendations listed in LOEP news release k, no. 4 because they had not yet received LOEP news release no. 5, which discussed additional protective action recommendations. However, these additional recommendations had been approved and in alllikelihood would have been issued over the

   ,b         .

EBS network, thereby already having become public knowledge. - ,y It is recommended that the LOEP procedures be modified to allow its ,' spokespersons to discuss important information provided it has been confirmed over the f

   "'             telephone. News release no. 5 arrived during the news conference, in time to prevent this contradictory situation from developing,                                                                      g w                                                                                                                                  ,

E A second problem stems from the State's references in its press releases to protective actions it has recommended. This is an important role perfo'rmed by the State ,g and credit is. deserved. Howe.ver, what the parishes decide to do to protect their citizens 7 (? may differ from what the State recommends. To avoid confusion and what might appear ' ! to the media and the public to be a disagreement between State and local authorities, it may be advisable for the state to discontinue its references to its recommendations. The [ parish press releases already discuss protective actions being implemented and can stand

  • as the single source of this information in most cases. If the State feels it necessary to lc p

' .^r W pO",S;7,q g .-

                                  / ,; 7 +   - 7 g, ;.p-yc ; w     2 , p.- -    - ,-. y ,, -       .

U_'E'M. ' ' dOSIlISDN.[ [.21.^' ' 'l 7IAMSd.E ld.['. ?*  ?.$ 2 a . u e .\

                                                       ~

20 .;-'

       ~
 ,$                discuss its recommendations, it should also explain in its press releases that the ultimate            i decision-making authority lies with the parishes, and there may be differences between what n recommended and what is being implemented.                                                  7 3

b C There was also a problem involving a delay in the dissemination of some

   /,)             Information. About one hour and 20 minutes elapsed between the onset of radioactive               -

releases from the plant and the time the media was advised of this event. Gathering g information about the event and making a total assessment obviously takes time. In this-particular situation, speed is also an asset. It is far better to issue the information as .q accurately and expeditiously as possible than to respond to rumors and accusations of ~ having withheld information from the press and the public. Another problem involved the lack of displaying appropriate maps depicting ~

       .           evacuation / sheltering routes and sectors. The only map displayed was found hanging in the office of the ENC director. Several other maps were found leaning against a wall of              ,

the eighth floor news conference room. The maps were not brought out for use untillate j in the exercise (about 2 p.m.) to show the simulated media the evacuation / sheltering sectors. ... s The only other problems affecting the totally successful demonstration of Objective No. 24 involved the use of some technical terminology which should have been _, explained during the news briefings, and some brief Indecision as to whether the offsite .f

  • technical advisor should have a hand in the actual writing of the news releases. This
 ;                 latter problem was quickly resolved during the exercise.

[ Objective No 25 (demonstrate the ability to provide advance coordination of , information released): This was adequately handled with LP&L spokespersons providing sufficient advance time prior to news briefings to advise the various utility, State and local news personnel about the substance and impact of upcoming news briefings. .,,

      -;                     Overall, it was an effective exercise at the ENC and all participants performed well. Persistent and penetrating questioning of LP&L spokespersons and other exercise             .]7 participants by utility employees posing as reporters made this an especially meaningful s

and rewarding exercise. DEFICIENCIES  ; a None.

                                                                                                                        ~f 1

4

            .       AREAS REQUIRING CORRECTIVE ACTION:

I

                            .None.     -

e-

                                                                                                                      ~

m 9

          -.- .-. L -
           -.                               .-           -         ._           -.             u             - a . ..: . .        . . . + .. -

t* e . 21 J'

    -l ~
  • e . AREAS RECOMMENDED FOR IMPROVEMENT:

[~' .

Description:

LOEP was unable to announce State actions (for

4. example, protective action recommendations) prior to receipt of written and signed press releases (via telefax). Problems arise if the state is unable to discuss actions that are already known by the L media because they have been broadcast over EBS ' network or because parishes have released the information. 1.

(

     -                               Recommendation: It.is recommended that procedures be modified to permit the LOEP spokesperson the flexibility to discuss actions that have been taken provided that the information has been con-i                                firmed by telephone to be accurate prior to its release to the media.                                              ,

Description:

In press releases issued by LOEP, there are statements , [ , (. regarding protective actions that have been recommended. However, these recommendations may differ from protective , p actions that are being implemented by parishes and are discussed in f parish press releases. Great potential exists for seemingly contradictory information and perhaps confusion. [

t. Recommendation: There is no need for the state to make reference to its speelfic recommendations in its press releases. The fact that '

it has made recommendations is well documented elsewhere. To [. avoid confusion, state should either avoid reference altogether or make it more clear in its press releases that parishes have the i

    'O'                              ultimate decision-making authority and that what is actually being t                                done by the parishes may therefore differ from what is                                                        c' recommended.

'i 2.2 LOCAL EOCS AND SUPPORT ORGANIZATIONS l r.t. i ' 2.2.1 St. Charles Parish it-t, ST. CHARLES PARISH EOC J y.

       ~

NARRATIVE  ! y, The St. Charles Parish Offic.e of Emerg,ency Preparedness (OEP) Director was  ;. h~ notified, by the utility Hotline, of an Unusual Event at the Waterford 3 plant at ['

  ..                     7:51 a.m. At 8:41 a.m. the utility advised that the emergency situation had escalated to an Alert. At that time, the OEP Director directed the (simulated) activation of the EOC                                  ,

[. emergency staff using the pre-established call-down system. Only the Public Information

  ,-                     Officer, EOC Coordinator, Communications Officer and a communications operator were                                      ..

1 (. ' 9

  • liJ
                 ~ y -r-  r..n y.m:u 4     y lr ;y , g,    - . c. 2 ;-..--
                                                                            ,-;-r.g p;:.,   ,
                                                                                                      ,.,q ,
                                                                                                             - -. . .. j . ._ 3 y
          - , , . :p >:.w. nppm;ygg . .. .                        ,  ., n u . y .                   . . . . . ,., .
                                                                                                                           , e                   ..y
 , j.- $ < Y..? r.Ol12LM5&,2..il.n.lG.2% ' Els.:.tk c.?  ' '$.C.: Y22 Wik: G 2
  • r S
                                                        .                                                           w..   . .d U_,.1 Ah 21.'

1l . [.$

                                                          ~

N. 22 m actually activated due to the Parish's partial participation in the exercise. However, due j to the television taping of a special production on local EOC operations, the EOC staff q did report for simulated duty at about 11:45 a.m. Once on the scene, the staff became q j active in the exercise play and demonstrated a high degree of capability to carry out lj U. their emergency responsibilities. They actively participated for approximately two hours m during the General Emergency period of exercise. ,

a "'
 ?,;                             The EOC Director effectively directed and controlled EOC operations, M                demonstrated excellent decision-making skills and maintained close coordination with                                             7 3

appropriate external organizations during implementation of his decisions. The EOC "

      ..              staff (following their arrival for television taping) were frequently briefed and were
      ;,              closely involved in the decision-making process. ' The technical advisor provided by the                                         -
     ')               utility provided invaluable advice to the Director and EOC staff.                                                              j          i
       -',                       The EOC is a well arranged, fully hardened facility that is capable of supporting                                  ,

e - a protracted emergency response. It is well lighted and uncrowded, and contains a -]

           -          kitchen, bunking facilities and backup power. Two alternate EOCs, of lesser capability, are available if necessary. Excellent status boards were clearly posted and maintained                                             .

L j throughout the exercise. Maps depicting the EPZ with sectors labeled, evacuation

     ?                routes, traffic control points, population by sectors and monitoring points were clearly displayed and referred to during the exercise. Copies of the Parish Plan were available                                       .,

as well as written procedures and check-lists for each EOC staff position. Message .l

        >             handling was effective and a master log of all messages was maintained. EOC sacurity was simulated but, when questioned, Sheriff's Dept. personnel demonstrated thorough                                            .,

knowledge of the security procedures for the facility. _) EOC communications systems and procedures worked well throughout the _ exercise and have a high degree of redundancy; many telephones, hotlines, various radios

     }                and fac machines were available and used as necessary. Dedicated and commercial                                            -
              ~

telephones were the primary means of communications, backed up by other equipment as .. required. At 9:52 a.m. the exercise situation escalated to a Site Area Emergency. Shortly Q thereafter, in accordance with prior agreements within the locality, the EOC Director i , remmmended the evacuation of the Killona School. At 10:38 a.m., a precautionary ,

         ;              u- \ tion of the community of Killona was recommended and one siren in that
                           & anity was sounded (simulated). The news media was advised of this action and a                                             },

(sh , ated) EBS message was issued about this precautionary action. J: Following the decision by the utility to evacuate all non-essential personnel from , the plant site, the EOC Director decided to use his industrial hotline'to advise the petro- ', ! chemical industries within a mile of the Waterford 3 plant of the utility action and to suggest that they consider taking appropriate action. The verbal instructions from the q EOC Director to his communicator were misunderstood and the message transmitted j indicated that the EOC was recommending the evacuation of all non-essential workers. It is recommended that all outgoing messages be given to communicators in writing so ) that; a) the meaning of the message is clearly understood, and b) the identical message is i given to all of the many addressees on the hot line.

                                                                                                                                                    ._,4 E
                                                                                                                                                          }

L - - _ - _ - _ = _ _ _ _ _ = =c .- z =. : : = . - .. -. . - _ - - __-__ -  : _.- - _ -

                                                                                          -   ^

_. .w . 3

         ^

23 l 1

e. w A General Emergency was declared at 11:10 a.m. and the utility recommended,  ;'

t_ as a protective action, that the general public in evacuation sectors A1, B1, C1, D1, B2 C' and D2 take shelter. The utility communicator, at the TSC, who was on the hotline to r transmit this message seemed to lack comprehension of the meaning of the message and recommended that these sectors evacuate instead of shelter. It required considerable

      '          effort, by the other organizations on the hotline, to straighten out this misunderstanding.          '

i It is to their credit that they caught the problem and worked to resolve it. An " evacuation recommendation for sectors A1, B1, C1, D1,' B2 and D2 was issued by the F utility at 11:48 a.m. The EOC immediately initiated (simulated) all appropriate actions to deploy traffic control personnel and issued public announcements, via the EBS, cable j [. ' television and other media outlets, instructing the public on the actions that they should

   -i            take. The siren system was activated several times to alert the public of the EBS t          announcements that followed over the next few hours. At the same time instructions                     ,J were issued (simulated) to halt air, rail and water traffic into the EPZ. It was noted that

[ the decision to halt river traffic was not coordinated with the adjoining Parish (St. John ' ' t, the Baptist) until that Parish requested information on Coast Guard notification. It is recommended that the Transportation Officers Procedures be reviewed to insure

     '           coordination with adjacent Parishes in the event of a request to the Coast Guard to halt             .

[ Mississippi River traffic. 1; r- Throughout the exercise, instructions for the public were prepared by the PIO in *

                                                                                                                         ~

coordination with the EOC staff. The PIO is the Assistant to the Parish Police Jury

    ]            President (Parish Chief Executive Officer) and empowered by law to act in his absence.               .

After consultation with the EOC Director, the draft messages to the public are read over

,[               a radio link to the EBS station where they 'are taped and then replayed to the public i                 (contact with EBS was simulated). The PIO also has direct access to all cable TV 4
      -          channels; could blank the screen and override the audio, or could directly input an

!<. emergency message on the government access channel (channel 11). All messages were also sent to the LOEP, LNED add the LP&L emergency news center. Information~ was (

r presented in terms of familiar landmarks as.well as the sectors. Schools, hospitals,

! nursing homes and industries were separately contacted via special communications links (simulated). The Parish dispatched a representative to the LP&L media center to serve as spokesman and liaison. His operations are covered in the media center portion of this I report. Although NOT an objective of the exercise, the initial public notification and protective action message drafting and dissemination (simulated) for the general

    ;             emergency took 20 minutes, slightly longer than the 15 minute federal standard. Also, f

another protective action message took 32 minutes to draft and disseminate. It is , ! recommended that procedures be reviewed to insure timely preparation and dissemination of public information or action messages. .: l< Even though the EOC staff had not intended to participate in the exercise, but / only in the television taping session, they became involved and demonstrated effective P i ( decision making and acted to coordinate implementation of procedures within and across [ I L their functional areas during the two hours of their operation during the General f' Emergency. Some of their activities were actual and some were simulated. For a

. ;               example, the Health Officer and the Transportation Officer actually coordinated as they 1i                 arranged simulated evacuation transportation for medical institutions. On the other                    <

hand, a phone call to West Jefferson Hospital to determine bed availability was , lt.

    ,a                                                                                                                     .

33 mm 3r=;p .3yy. . , ,. ~ 3. y ,.37.gw,3 g- 7,7 . y l-

g W,,..W<..-.~.. 5.:

             ...       ~  .:F r. 7:T. Qw.m3;]fg%p.c?.'.
                                          .u-
                                                    . ._ .c w     V 'T:Q. N: Mya.t 'y'l,
                                                                      .t         .
                                                                                                   .9: ~ v. . , y
                                                                                                     . ~ ~. . . .. . : ' . ? n -      -

l

           .                                          .-                                                                    "i 24                                                         ..~

simulated. This simulation resulted in some concern at the hospital as they were ' ']~ expecting to actually receive a call that would act as a trigger for some of their exercise

    =i             actions. It is recommended that more detailed briefings be given to exercise participants                   q l                on what may be simulated and what should be actually accomplished so that triggering                      .j events / actions will not be inadvertently missed.

fj All objectives of this exercise assigned to St. Charles Parish (3, 5, 36 and 37) - Q were adequately met.-

< .7 DEFICIENCIES:

A

    .-                      None.                                                                                                       l AREAS REQUIRING CORRECTIVE ACTION:

n -.

    .,                      None.                                                                                                 ,.
  '1                                                                                                                                    I
                                                                                                                              ..I AREAS RECOMMENDED FOR IMPROVEMENT:

Description:

Misunderstanding of verbal instructions from the Parish Coordinator resulted in an incorrect protective action j message being transmitted over the Parish Industrial hotline. Recommendation: All outgoing messages should be prepared, in -

       ;                         writing, to insure; a) the meaning of the message is clearly e,                              understood by the communicator, and b) Identical messages are transmitted to all addressees on a multi-call system.
                                                                                                                            ~'

Description:

EOC staff officer (Transportation) failed to maintain coordination with adjacent Parish when acting to request that the ' Coast Guard close the Mississippi River through the EPZ. G Recommendation: Review procedures to insure that all appropriate

       ~

coordination and notification with and to adjacent jurisdictions will be efG. ted. .; ['

Description:

Although not an objective of the exercise, development and dissemination of EBS messages sometimes took longer than the 15 minute Federal standard time following

         .                       protective action decisions.

-} Recommendation: Speed the preparation and dissemination of EES I messages following activation of the siren system. }

                                                                                                                                  .t 6

y i t t . l. t . .

2u  % :. J .:...:..~.n A !.
                        .            .                                          2.          .. -            . . - .          .. l
                                                                                                                                                                           '~
      , r.  ;

[ o 25 , (. I ' ST. CHARLES AMDULANCE SERVICE [. g .- L NARRATIVE At 1:15 p.m. the St. Charles Ambulance Service was notified to respond to the L-j- t Waterford 3 plant to move an injured, possibly contaminated, patient to the helipad to ;n meet an Air-Care helicopter ambulance. All operations of the St. Charles ambulance, r' except for communications, took place on the plant site and were evaluated by NRC L evaluators. Communleations, dispatch and other off-site operations were adequate and met the objectives of the exercise.

j*

e . DEFICIENCIES: r t. None. i. r i J AREAS REQUIRING CORRECTIVE ACTION: w  :. None.

    .L,                                                                                                                                                                    b L

AREAS RECOMMENDED FOR IMPROVEMENT: .

    .s L                                  None.

j L 2.2.2 St. John the Baptist Parish EOC r

  • I-
' L                           NARRATIVE                                                                                                                                   ,

j St. John the Baptist Parish partially participated in the exercise thus the EOC was activated only to the extent required to meet the four objectives tested; (' communications equipment and procedures, decision making and coordination and ,

t. Implementation of procedures based on changes in emergency classification levels.

t Emergency response activities were initiated at the St. John the Baptist Parish t EOC following the receipt of the Notification of Unusual Event at 7:52 a.m. Following . i i.j the receipt of the Alert at '8:43 a.m., all appropriate staff alert fan-outs were ' demonstrated, based on the SOPS, and were completed at 9:10 a.m. Included in the fan-out was notification of all Parish agency heads and a roll-call notification of schools and  ;*

                           . local industries. EOC Internal security procedures were demonstrated and dosimetry                                                           g
    .{a~;

distribution was simulated. As the exercise emergency classification levels changed, the [ Civil Defense Director explained the activities that would take place for each emergency

     '                         response function in response to the scenario. These explanations were in the form of
  • staff briefings that would also normally take place throughout an event. Based on e

receipt of emergency classification levels and subsequent demonstration and simulation , l of response actions, objective 37 was met. [._ . I 1 ../

                                             . _ m_,u.7.A y ,r,77. y y ,, ,, E , . ay - , yp,
                                                                                           . . _- ...                                                         .p ..

NMpT** ".

  • 1.'7]-Q'/ , Trcy,
                    . . . _ . _ ,      m                     ,        _ . _ . .

_ . , . 7,7 .g ._ . , , 7 7,7 ,

                                                                                                                    ~

y, f,

g~QFTT . m e mR Q ;:WMmeQ. m W NR m'Q:s.nsfc. . e.L ' ~ L m2 ?.MRm.u ,-.. p- .:. ~ _. Vum- s w a,: D. -% -s_.ND _. <'. m . .

                                                                                                                                      ~

n *

                                                                                                                     ,   s n .
                                                                    ~

m

                                                    ~

26 [. q.

     ]                      During the course of the exercise, coordination between St. John the Baptist                  -]    1 3

Parish, St. Charles Parish, and all appropriate emergency response entitles was 1 demonstrated. Implementation of PARS regarding the Killona schoolchildren and general

 ]               population evacuation, the evacuation of industries in Taft, coordination of PAR                              ; .-]

R implementation for Montz and coordination of news releases and stren soundings a demonstrated an excellent working relationship with St. Charles Parish. Unofficial 3 y information received from the State was used for preparation purposes only and no j

 ,2               implementation was carried out until official information was received. Conversely, Implementation status from the Parish was conveyed as appropriate to the State. One                       q
.l h point of confusion surfaced regarding the responsible entity for contacting the Coast ~'

Q Guard to control traffic on the river uithin the EPZ. St. Charles Parish has the -

 ':               responsibility for contacting the Coast Guard and is also responsible for coordinating this d                 action with St. John the Baptist Parish. This coordination was not effected until, at                  ~
 )                1:10 p.m., St. John inquired. of St. Charles about closing the river. Overall, the demonstrations and response actions indicated that St. John the Baptist Parish met 4]                objective 3 regarding demonstration of ability to make decisions and to coordinate                        '

emergency activities. j' Objective 5 was met by demonstration of the Parish's ability to communicate ~' with all appropriate locations, organizations and field personnel. During the exercise two issues surfaced regarding use of the " Notification Message Form". First' one of the

                                                                                                                         ", j.

utility communicators at the TSC was not clear in conveying information on Item 6 of

d. the form (Recommended Protective Actions). It took some effort, on the part of other f locations on the hotline network, to clarify the intent o.f the message (Message #F-11, at q 11:09 a.m.). The other issue relates to the State LOEP EOC using an obsolete form.
     ;                                                                                                                          ^

Neither of these issues related directly to St. John the Baptist Parish but were simply S identif!ed at that location during the exercise. - h The final objective, number 36, regards demonstration of the adequacy, -- j operability and effective use of emergency. communications equipment. This objective _ 4 was met. However, at approximately 1:15 p.m., the hotline phone system was i Inoperative for a short period of time. Back-up systems were used and effective and q timely communications were maintained. This breakdown is as yet unexplained and

    +              should be investigated and appropriate corrections made.
*)

I A concern was expressed by the emergency response staff that the facility used

   -                for emergency response operations was less than optimal. Although the facility was                             {
    -               adequate, it was felt that, given the major responsibilities of St. John the Baptist Parish                   ,~

in responding to emergencies, consideration should be given to the establishment of a dedicated EOC facility. DEFICIENCIES: . 7 Q l None. 9 3

'!                                                                                                                                 f 1
    ,                                                                                                                              (
   .i
       -~                              - ~ -                  . + . . - .                 ..n%.. _ _ .      ,,._,,,,.,,     .
             #       +
f. c.

27  :. i AREAS REQUIRING CORRECTIVE ACTIONS: r- None. 1 L

            .                  AREAS RECOMMENDED FOR IMPROVEMENT:

Description:

At approximately 1:15 p.m. the hotline phone system p was inoperable for a short period of time. t' Recommendation: Determine the cause of the system malfunction .

  . ;.r.                                               and remedy it.

t

Description:

A concern was expressed by the emergency staff that c- the emergency response facility was less than optimal for full and

        ;                                              extended operations.

Recommendation: Consideration should be given to the p- , establishment of a dedicated emergency response facility. - s. r: . 4 2.2.3 Jefferson Parish 3 *. i- *

    .[.                        JEFFERSON PARISH EOC                                                                .

j NARRATIVE i5 6. The Jefferson Parish EOC participated in the exercise only to the extent ' i> required to support' the operations of the facilities described below. There were no

  • exercise objectives for the Jefferson Parish EOC. b l ~r .

(L AVONDALE FIRE DEPARTMENT DECONTAMINATION CENTER p i, (l

L, .

Se i i NARRATIVE l l The Jefferson Parish Civil Defense Coordinator received notification, via [ i' telephone, that a State Police Officer was possibly contaminated and was being sent to c. . i the Avondale Fire Dept. Decontamination Center. The Civil Defense Coordinator then f-E advised the Decontamination Center where preparations to receive the contaminated E i- Individual were initiated. Protective barriers were established for contaminated and (. . non-contaminated personnel and vehicles, and the floor in the survey area and shower area were covered with paper. On arrival, the vehicle and the officer were thoroughly f^ , t monitored. The vehicle was determined not to be contaminated and was parked outside l the protective barriers. The officer was further monitored inside the survey area and I m Y e ju , L

           '~ ' ' *                          * * " * " *
  • J, *t -'

e p -g.,,e y - ,,, 84 * * * * * *

  • 9',= 3 ,.4 , 3 , , g. .

n%. .:....v. m. n.wmc;me , , . . , , L a w w w .: M ', w . ", -@:.;.f, M .uun . a . . ." .; 6 .; _ l.a, .%

.';;.J.,.g
 ,n b      #                                                                                                                                                 '
                                                       ~

28 .'

 .m                                                                                                                                                         ,

i if was found to be contaminated on his hands and feet. He simulated a decontamination shower and was found to be free of further contamination. During the survey process, the officers clothing and personal belongings were simulated being placed in plastic bags, n d ,j i';) inside a plastic lined metal can, for later decontamination or disposal. M Following the decontamination simulation, the station personnel surveyed the Q - . . entire survey area, the shower and themselves. No contamination was found.  ;] A 3 The Decontamination Center had sufficient personnel and equipment for . 1 monitoring and decontamination activities. The personnel appeared to be well trained in

 'j                required procedures and prepared to take appropriate actions. Had the vehicle required decontamination, it would have been washed-down on a soll area inside the protected
 *g perimeter. The contaminated soll would then have been collected and disposed of by                                                         I b                  LP&L.
't                                                                                                                                                  '

3 The communications at the Decontamination Center were entirely adequate. In

 '-                addition to the telephone system, back-up radio frequencies were available.

Exercise objectives 5 and 29 were observed and met and ARCA 12 from the

'\                 September 18,1985 exercise was evaluated and corrected.

I k DEFICIENCIES: .

  'I, r;                          None.
 't                                                                     .
                                                                                                                                                        ~

3

]                  AREAS REQUIRING CORRECTIVE ACTION:                                                                                                .

3 None.

                             ~

A ~ e AREAS RECOMMENDED FOR IMPROVEMENT:

  ]                          None.

i WESF JEFFERSON HOSPITAL AND AIR-CARE HELICOPTER AMBULANCE NARRATIVE 4 Notification of an incident at the Waterford 3 plant requiring medical assistance

    -               was received, via the Air-Care net, from the utility, at 1:14 p.m. A follow-up                                                          1 notification, from Jefferson parish EOC, via the HEAR system, was received at                                              ..]

1:20 p.m. The Air-Care helicopter ambulance was dispatched, leaving within 5 minutes for the incident site. .)

                                                                                                                                                 ..]
                                                                                                                                               .e

a u ' (-' -- 7, -- - _~_. 7. y

           ~
 .J                                                                29                                                                   ', ;
- ,1 r 1

'. Prior to the request for medical assistance, the hospital had 1.A been advised of the emergency situation at the plant and was unaware of the possible need for radio- ,y t [~ logical preparedness. t

                  -           On arrival at the incident site, and after determining the condition of the                                      ;
f. *

(simulated) contaminated patient, the helicopter ambulance crew communicated the '(' [ appropriate data to the hospital where immediate steps were taken to prepare to receive the patient. Critical procedural steps in this preparation were posted in the Emergency b. Room to assure that nothing would be missed. In-house notifications were made to all E p l departments designated for involvement in radiation accident response, from housekeeping to management. By 1:50 p.m. the Emergency Room was set up and

  .r                prepared, the staff was dressed in Anti-Contamination clothing and all required                                      ,
     ;              equipment and supplies were in place. Personnel monitoring devices (TLDs and SRDs) were issued to all emergency room staff. However, since no dosimeter charger was
r. available, the dosimeters were not properly charged prior to distribution 'and showed ,

[ readings from 70 mR to 100 mR on their 200 mR scales. At 2:05 p.m. the helicopter crew reported an ETA of 12 minutes to the hospital and provided the patient's status and vital signs to the Emergency Room staff. The helicopter arrived at 2:15 p.m. with the crew, the patient and an accompanying Health L. Physicist from the Waterford 3 plant. The patient and the helicopter were monitored for , 7 j' contamination and, while the patient was found to be contaminated, the helicopter was - clean and was released for other operations. The patient was moved into the prepared area of the Emergency Room for decontamination and medical stabilization. After ' passage of the patient, the helicopter landing area and the hallways were monitored for - contamination and found to be clean. By 2:37 p.m. the patient had been decontaminated,  ; medically stabilized and moved into the main Emergency Room for further medical P treatment. Hospital management and the hospital's PIO were advised of the patient's " ~ condition so that they could respond to requests for information if received. The ,, emergency room area and staff were monitored for contamination, dosimeters were read, '~ . and then protective material and clothing were removed and the area returned to normal. ' 1

6. ..

The hospital demonstrated that it is well equipped to handle a contaminated - I patient and that the staff is well trained and capable.  ;-

6 All communications used in the exercise worked exceptionally well with no '

i I problems or malfunctions noted. I t i Exercise objectives 5, 30 and 31 were observed and met and ARCA's 13 and 14 from the September 18,1985 exercise were evaluated and corrected. [. i [, DEFICIENCIES: . . t None. , , i (< s s-t a #- ( 9 .,g g .g. . . , ,, , , , pp q,y p e p

             'e         ,             g           .

I. .5&E._d.I.N.M4 ii.NIisifNbe

                                                                             $Mh1I2C 1                                                       "
                                                                                                                                               - '4   4 " [' .CM E

[ - 30 p),.: n .

                                                                                                                                                                            ;3 oL          AREAS REQUIRING CORRECTIVE ACTION:                                                                                                  -                          ,,

e

Description:

Dosimeters issued to hospital staff were not properly [y: charged prior to their distribution. Readings of up to 1/2 scale on -]. ' Ni the 0-200 mR units were observed. (NUREG-0654, II, K.3.a. and b.) 4 - 3'j Recommendatiom Dosimeters should be zeroed and charged prior  ;

to being issued to emergency staff. ,
     .i                                                                                                                                                                      7 1

E AREAS RECOMMENDED FOR IMPROVEMENT y . Hone. (., '. :- c y 2.3 UTILITY SUPPORT i' A summary is provided below of some of the Loulslana Power and Light Company

 ;/f            Issues which relate to or impact upon the off site activities performed.by the various                                                                        7
i. participating agencies. This section is presented because the Federal evaluators ,d 4 determined that some issues resulting from Utility operations created off site impacts.
 $              FEMA acknowledges that its responsibility is not to cite utility deficiencies, areas requiring corrective action, or areas recommended for improvement. However, the                                                                           .,

[& 0 noted lasues that follow should be addressed by the NRC and/or Utility to prevent their recurrance during future exercises or in a real emergency at the Waterford 3 Station. '?'

 ?                                                                                                                                                                          .:

.- UTrtrrr msUES ,y "1

Description:

An apparent lack of comprehension by a utility j communicator at the TSC of Part 6 of the Notification Message '.- Form, resulted in considerable confusion over the meaning of [. p Message F-11 as read over the hotline. The message, as read, ll seemed to indicate a recommendation for shelter in four areas within one mile of the plant, and evacuation of two other areas ' j] [ '3 O farther from the plant. This anomaly was noticed at once at the local EOCs but required several minutes and a number of requests 7 for clarification to straighten out. The original intent of the , f~

  .'        -                message was a recommendation for shelter in all six of the areas noted in the message.

L.*- Recommendation: The Utility should insure that all of their communicators are ' trained in the meaning of the entries on the . t i.' Notification Message Form and that the intent of all outgoing . J] L messages is clear prior to their transmission.  ; e Descriptiom The hotline telephone system at the St. John the 1 Baptist Parish EOC was inoperative for a short period of time at I

                                                                                                                                                                           . .b
                                                                                                                                                                              .h l'    t
         ,,   .   .-wl L -~              . - - . - - -    ,nL._.-- -- --   ,,,,4 ,- _ -,- -.--         . . - . , , _ , - - - - - - - - -                --     - - .
                                                                          ~

m - . . _ _

                                                    .__,         _          _ , _ _      i,._ ,        _,        _
   ,f          .                                                                                                      m
          ~

31

 ~ (a

[ about 1:15 p.m. Back-up systems were used during the short outage and provided effective contact with appropriate locations. j t.; Recommendation: Determine the cause of the temporary loss of the hotline and insure its future operability. ,;

 -p L                       * 

Description:

Maps displaying evacuation / sheltering sectors were p 1 not observed anywhere in the LP&L Emergency News Center except in the ENC Director's office. Maps were later displayed in the y[ News Conference Room towards the end of the exercise. , Recommendation: Make sure maps are displayed in several '

 . r'                          prominent locations in the ENC and in the News Conference Room at all times.

r'

  • Descriptiom A number of technical terms associated with the

[- nuclear power industry were used by LP&L spokesmen during press briefings without appropriate explanations of their meaning. c Recommendation: Either use more easily understood terminology or li make sure the spokespersons take the time to explain / interpret the ,.- meaning of the terminology. It must be assumed that, in the real rf world, not every member of the press or of the general population . i. understands all of the technical terminology used by the nuclear y r' power industry. .; (. ._

Description:

Once, there appeared to be a lack of agreement among , P the top echelon of the ENC staff as to whether or not the offsite ' , i-technical advisor should have a role in the preparation of news  ; releases. In the real world, such a disconcerting problem could p possibly effect the credibility of the emergency news operation. y.s (; Recommendation: Determine in advance exactly who or what ( Individuals will be responsible for writing the news releases and hold y

 .j-                            that person or persons accountable for this task.                                   ?,1 J

a ry - *

Description:

Prior to the actual request for medical assistance, the , c supporting (contract) hospital had not been notified of a developing , emergency at the plant. Therefore, they were unable to initiate , f- precautionary and preparatory steps to respond if assistance was  ; d requested. , Recommendatiom Ensure that emergency procedures include p 4 [. precautionary notification of supporting medical facilities to assure more rapid response to possible requests for assistance. f Ip , ( ( - J t: 1, . , . - - __ ..,. .e .,_7,., . , , , . . ,,,, ,, , , , , _

y r 3- gr - ~ v . ~ W ' + ' / - , ,{ :7 - r; - . " f p, .g .s p .., - y..%U A1- . 1 &Gu .,c . . k,. ' ' c'. s. :l2 L LC -- .* C e: h .L-._'.

                                                                                 . .~.
  • t c ". , J f c- _ , . .'. a . a.. 4L.e ': . J ~. d i. ' - i .'

3

  ,!i,,                                                                                                                                           e n;
s. c . - .e.*,
    .:)       .

32 .. : J..

                                                                                                                                                               'i}')

d5 6s~s g . 31' ,

                                                                                                                                                              .a
                                                                                                                                                             -*~ !
  !s. 41
  ,8                                                                                                                                                         'kI
                                                                                                                                                              =
  ).. 4 f.g.              l
  • 94 g e- .

9 L.' f - t 3 t <

                                                                                                                                                              ..B)   '-

a,, e 2 t, .:

  !:+                                                                                                                                                                 .        ,

2 I Ji -- R A 4e {

       ).                                                                                                                                                   l.

r:3 c3 .

    'i af
  • 1 al i ra.1 4,.

m 5 .

     +
                                                                                                                                                                   *j r~',
     .. g                                                                                                                                                   .*'I i

a+ Y g *r 5

                                                                                                                                                                  ~,.

M

                                                                                                                                                                      .g 9
                                                                                                                                                                .3 m,
                                                                                                                                                                     'l
                                                                                                                                                                 .a\

[

                                                                                                                                                            . q f

3

  • f) 4 B

4 1

                                                                                                                                                                  .4 e

9 .-. ,e =w.*. y y

                                                                                                ~
                                     . .         ..            ....u.       ..        .,.
                                                                                      .               u-              '. . .w - .       ;

g , j

  • 33 ,.

p- {.; 3 TRACKING SCHEDULE FOR STATE / LOCAL ACTIONS TO CORRECT [r DEFICIENCIES AND AREAS REQUIRING CORRECTIVE ACTION , GT t' Section 2 of this exercise report has provided a listing of all observed g 3 p Deficiencies and Areas Requiring Corrective Action, with recommendations noted by i Federal evaluators. The evaluations were based on the applicable planning standards and l: evaluation criteria set forth in Section II of NUREG-0654/ FEMA REP-1, Revision 1 p (November 1980), and the exercise objectives. . Table 1 provides a consolidated summary of all Deficiencies and Areas Requiring

 ,r-                       Corrective Actions, by jurisdiction, noted by the Federal evaluators, together with carry-over entries (if any) from previous REP exercises. As noted, there were no Deficiencies found in this Waterford 3 off-site radiological emergency response preparedness exercise. The Table 1 chart has been designed so that space has been allowed to add: (1)
  ;                         the proposed corective actions that will be undertaken and (2) the projected and actual dates of completion of these actions.                                                                                     -

I The FEMA Region VI Director is responsible for certifying to the FEMA

  '                         Associate Director, State and Local Programs and Support, Washington, D.C., that any                                'T Deficiencies and Areas Requiring Corrective Action noted in the exercise will be                                 ;
  ;                        corrected and that such corrections will also be incorporated into the emergency                                  (

l response plans as appropriate. (.

   "~

FEMA Region VI may request that the State of Loulslans and local jurisdictions , C participating in the Waterford 3 exercise submit measures that they will take or intend to take to correct those problems identified by the Federal evaluators. If corrective actions are necessary, FEMA Region VI will request that a detailed plan, including dates , c of completion for schedule or implementing remedial actions, be provided if remedial ., actions cannot be instituted immediately. .. l N  : e e g., 7, . i 11

                                                                                                                                            ;.c p               '

r s s , r ' e . (-

  • g: -

L - L- 7-e

             ... ~. ,.---,. . -.

3., - <

                                               ,    - - - . - ~ . - -   . v    .

y _ e . . , . . ~ . . , . ~ ao- ., ..;.- ;

L

                      -       ',   , :s .. . . ; y x ~~    '~b. e.,".: . - . . , .
                                                                                     ,n.     ,
                                                                                             - . ~ ~ m .. >. . .<. . , y .:.... - ,..,.
                                                                                                            ._                   .. y , n, .. 3. _. .ruy.

s :,mw:..; . n . , . ,-.

                                                                                                                                                        ....,__u           .
                                                                                                                                                                                       , . .m.
                                                                                                                                                                                                 .s.; v.,,

G l:- h: M I1 TABLE 1 Corrective Actions for the Waterford 3 Exercise T [% 1 Page 1 of 1 i.

                                                                                                                                                                                                        $h FEMA Evaluation of                                                                 m y

Deficiencies and Areas Re- State and Local quiring. Corrective Actions State (S) and Proposed ' Corrective Actions Actual rf.f With FEMA /RAC Reconumenda- Local (L) Proposed Completion and Determination of Completion , jf tions for Correction Corrective Actions Date Adequacy or Inadequacy Date  :.51 f.6

.^'

t :. (THE FOLIDWING ARE NEW AREAS REQUIRING CORRECTIVE ACTION, FROM THE OCTOBER 1986 EXERCISE)- N' h '. I 9 5' Jefferson Parish - West Jefferson {'s;, Hospital ..,

g. ~.

1 ! 86-1 Description Dosimeters Additional training Next FEMA will reevaluate sJ issued to hospital staff is to be provided Training at next exercise. were not properly charged with emphasis on Session y 3 or zeroed prior to distri- zeroing personal (May, i ?- bution. Readings of up to dosimeters prior to -1987) t... h, 1/2 scale on the 0-200 mR issue or use. cb; i units were observed. ,- l (NUREC-0654, II, K.3.a.

                                                                                                                                                                                                           .[

and b.) Reco===endation: Hospital [', radiological personnel should insure that all L' 4 ., [_ equipment is properly zeroed prior to issue for ,

                                                                                                                                                                                                             '.3:

use. ' 9b i f .e p. 4 i$. h M.

                                                                                                                                                                                                           ;f t .y e

L.

                                                                                                                                                          ;g, .g 4                                                                                  -                                                                                                      . . . .
                                                                                                                                                *~.j pm',                                                           c
  . .. - . . -     L.a_   - 2.. .;

u uj u, W.- C b. L,., y. , .

u .n . _._.. . _ _ _ . __

                                                                        . . _ .       ..              .. ....               -.     ..,_J           _ _ .

c' 35

       'K  .

[ 4 EVALUATION OF OBJECTIVES r, o_ 4.1

SUMMARY

OF FEMA OBJECTIVES REMAINING TO BE MET r , c Table 2 provides a consolidated listing of FEMA Objectives which, according to the FEMA RAC Chairman, have not been satisfactorily met or tested and which should be incorporated into the exercise objectives which, although previously tested and satisfactorily demonstrated, must be tested and evaluated during any Partial and/or Full- ' Participation exercise of off-site State and local response capabilities.  ; 4.2 FEMA OBJECTIVES TRACKING - WATERFORD III STEAM ELECTRIC STA, TION , Table 3 provides a comprehensive tracking system of FEMA Objectives, NUREG-0654 Reference Elements, Exercise Objectives, Jurisdictional responsibility, Exercise l ,. L Dates, Identified Deficiencies and Required Corrective Actions, and Date Specific - Objectives were met by State and local agencies. This system will track the progress and r. status of this data througl4 the six-year exercise cycle in which all FEMA objectives must , be tested. . f: . , (, , t.. . v. Il l s e r.- e

                                                                                                                                                           +

(,.M 'e h5 t.( t,_ 5- - t s.. r., W? W {. .'

   \ll.                                                                                                                                                    ,

I! . E d.

                                                                                                                                                                   ?

b

                                                             =* p                        _y         ,- ; -p        .e                  .s
  .t.'.g y { {4*-   "'7'.'     - " f 7 *B ",
                                                                  , ,  ,, , , ,    7$       p,   p.           ,,,p    - * *
2. q+- = .- - + g,$ ,
                                             ._ne
n. u. .

t a 7.

           .u , . .>;;;;:  ; mr.

n,. ac.u , : ,:L..

                                     ...                   - - i a.m'. ,2 a ;. .   .wa . .
                                                                          ~,'-
                                                                           ~      .,           ~-,n.'.~-

r .-

                                                                                                            . v:
. . ~ .
                                                                                                                         ... . x.aw.c.G
                                                                                                                                    .n                    .,
                                                                                                                                  ,     c.

M ,.

                                                                                                                                           ,.y )
       ~

36 .. '

                                                                                                                                              ,1 !

TABLE 2 Summary of FEMA Objectives Remaining to be Met at the Waterford 3 ;j , Steam Electric Station as of October 15,1986

 'l                                                                                                                                           ]'

f Y JURISDICTION AND _ [:j! D' ~ ~CIENCY OR REQUIRED 1 ~JRRECTIVE ACTION --- 2 FEMA Objective (If Applicable) .p

         -                                                                                                                                     ~
11. Demonstrate ability to project dosage State and Parishes - Not Tested to the public via ingestion pathway 2/8/84, 9/18/85, 10/15/86 i exposure, based on field cata; and 7,q' Q to determine appropriate protective

,, measures based on PACS and other

  • relevant factors (I.10,.I.11, J.11) ..
+ .a..'

,'4 4 ;; 12. Demonstrate ability to implement State and Parishes - Not Tested protective actions for ingestion 2/8/84, 9/18/85, 10/15/86 31 pathway hazards (J.9, J.11) , n

22. Demonstrate ability to supply and State and Parishes - Not Tested ,

administer KI, once the decision 2/8/84, 9/18/86, 10/15/86 '. has been made to do so (J.10.e)

                                                                                                                                                 -    f r
34. Demonstrate ability to determine State and Parishes, State - Not and implement appropriate measures Tested 2/8/84, 9/18/85, 10/15/86  :

for controlled recovery and re- Parishes - Reentry portion of 5: entry (M.1) Objectives Not Tested 2/8/84, 9/18/85, 10/15/86 Q $,4 - a n

                                                                                                                                               ,l a

0

   =,.

g P ,

                                                                                                                                           .a mei
                                                                                                                                        - Lb f

a r oc. -~.

                                                                    ,~;--     yn           y                           qp                                        e.. . e -                                    1~    g t,

{' ^ F:' p r', c f r} . .y - c .:.., n. 1m

                                                                                                                                            ~.-        r   --
                                                                                                                                                                             ;q             .

7

                                                                                                                                                                                                     ,t- . ,-  r,
                          .        - .. t.

4 i - q Q , P

i' 3

1 Il TABLE 3 FEMA Objectives Tracking Chsrt - Waterford III Steam Electric Station  ;, 1 Page 1 of 16

        ,                                                                                                                                                 Deficiency / Area                Date Jurisdictional                            Requiring Correc-            Objective NUREC-0654         Exercise Objective            Responsibility          Date of            tive Action (by                   Met FEMA Objectives            Reference           October 15, 1986             state        Local      Esercise           Tracking No.)           State          Local                      <
                                                                                                                                                                                                                           ?
 .j          .            1. Demonstrate ability to            E.1.E.2       Demonstrate the ability to           X           X          9/18/85                                  2/8/84         2/8/84
          ,                  mobilize     staff       and       (S&L)        make decisions and to                                                                               9/18/85        9/18/85
          !                  activate       facilities                       coordinate         emergency promptly,                                       activities.                                                                                                                                   -
       -i                                                                                                                                                                                                                 A (Objective for which                                                                                                                                                                g,3
         ,                   capability should be                                                                                                                                                                N 1                     demonstrated          during each full participation

' .1 - exercise) .? q

2. Demonstrate ability to A.2.a, I X 2/8/84 2/8/84 fully staff facilities A.4 and maintain staffing (S&L)
        ,                    around the clock.

i I J,, *

3. Demonstrate ability
  • to A.I.d, Demonstrate the ability to I I 9/18/85 2/8/84 1/8/84 -

3 make decisions and to A.1.e, make decisions and to 10/15/86 9/18/85 9/18/85

 '*                          coordinate      emergency         A.2.s         coordinate          emergency                                                                      10/15/86       10/15/86 activities.                        (S&L)        activities.

(Objective for which s capability should be , b demonstrated during i* { each full participation

 ..                          esercise)                                                                                                                                                                                    ;a f:                                                                                                                                                                                                                         .

.l.; g e P

  • en T' 'T*~. "; ~ "; v ~e_ n .~ =+ *
                                                                                                                ,,.s s .-e,                      . . .                     ,          ,. ,           ,     a
L- , . , . e,s#.v p. L Gy, ~, ~; ;;; . , . , - ._, , , * ; c , ;,y, _iig .y,g .', ; h .: ._ _.
                                   ,                     .-                       .                       7.-                                         - .            . _ .
                   -                                   . ' , . , -% -.2. :: :    , . . a a . . ,;;..                                                                                                         .

y_ i.f 3 l._- r* Nb

                                                                                                                                                                                                                           ??

e. 1: 1 WP W31 e ,q

                                                                                                                                                                                                                         . id.
                                                                                                                                                                                                                                .:/
                                                                                                                                                                                                                                .h.

TABLE 3 (Cont'd) d Page 2 of 16 t p(. Deficiency / Area Date fI.~ Juri sdictional Requiring Corree- Objective ('C S NUREC-0654 Esercise objective Res'ponsibility Date of tive Action (by Met

  • i-FEMA Objectives Reference October 15, 1986 State Local Esercise Tracking No.) 8 tate Local -
                                                                                                                                                                                                                 ?                  ,
 ,          4.       Demonstrate adequacy of              C.3.a.                                                            I              9/18/85                                9/18/85         2/8/84                    [ J' ,

facilities and displays H.2, 10/15/86 10/15/86 10/15/86 to support emergency H.3 .N '- operations. (S&L) 7.. tm (Objective fer which W capability should be

demonstrated during I.

each full participation  !*g exercise) ,, b,: *

5. Demonstrate ability to F. Demonstrate the ability to I I 9/18/85 9/18/85 2/8/84 -

communicate with all (S&L) commmunicate with all 10/15/86 10/15/86 10/15/86 appropriate locations, appropriate locations, ,f.'s organizations and field organisations and field "y personnel. personnel. (Objective for which 4J capability should be y demonstrated during l -fi each full participation b exercise) i l.

                                                                                                                                                                                                                              ??
6. Demonstrate ability to mobilize and deploy I.8 (S&L)

X 2/8/84 I[::; field monitoring teams in a timely fashion. [1j ' s 'l,. hl s'* g:.

                                                                                                                                                                                                                              ;. Y 
                                                                                                                                                                                                                        . (d f,,/
                                                                                                                       ,: g                      .~                                           .            .
                                                                                                                                                                                                                        .. e
                                                                                                                                                                               ]
       .        .~_.        ...;

u:_- u.; w . i I W >

                                                                                                                                  . . . s:      j3 j   .g         .

y , ,

                                                                                                                                                                                                                     .(

gy . : , iF. ,j!' .[tI z ,I! I: , j U ,: . l .

    ,.f
       ,". .                                                                                                      a t*

s'(, 2 e

                                                                                                                                                    +

6 1 l e e

                   ,                                            f                  c o      e
           ]                                                             v m     I 3      i                                                                                                                                            4 et t e  t ce 4j                                                              g  aen pa   D]

3 6St 1 6Sl1 A' , 0 t e 0Ne1

                                                                                                                        /Cil 0Na1
                                                                                                                                                                   /Cil a                                    4Cd e 1        eD 4Cde 1       eD w

t S / m / m 8 e 8 e

      ,-                                                                                                                         R                                         R
                                                                    'a c-    y-eeb rr()

Ar . s

                                                                    /ono yc o N c i
      '.-                                                            ngt g encn iiAi cr          k
.                                                                   iiec
.,                                                                  f uva
      -                                                              e qi r                                                                                                                                            ,

D Re t T. c-f s e s A7< oi e c er t e as

    -                                                                       DE                                                                                                                                    f
.n;
  • l yl &

at a nic a

    ,, ,                                                                ol o ii L                                                                                                                                       " _

tb ei r ;- l s

  • d n T eoe i pt rsa I I { ,
    -                                                                   uet                                                                                                                                       E          2
                .          .                                            JRs
    +;                                                                                                                                                                                                            *
              +                                                                                                                                                                                                   7 e                                                                                                                                    [       ,

9 v6 ,

    .                                                                       i8                                                                                                                                    "

t9 c1 e j ,

    ,.                                                                      b5 o1 er                                                                                                                                          ,
    .                                                                        se ib co rt g

ec ", xO m~' e - E #

                                                                                                                                                                                                                  ~

4 5 e 6 c 1) m p 0n

                                                                              - e                                       1. & L )S                                                                                         ,

Cr E e I, s -1 9. )S I( Rf I R Re 08.I , I II( ( T. . j

   ~*:.,                                                                                                                                                                                                             +

hegn e gn hegn et t enonco scf

   ~'.                                                                                       cb no                       t eno                cbno                                                                  (.

i ii acii i ii a c ei o/ . h rt i ont h rt iomdii w ddp ua r ri a w ddp ua rreatC pprrape s ppmi e o o us r c 7/G rd l i l i v u c r ea u c r t n e i ro i p t r ro i p a [2 7n t c oh f s t r pd e and oh f s t r anmet g0 pd e e es e a a a a nn1 r p ,

                                                          )                      j                   d p e

dp e e ro s d b e r eyt r boc s e

  ') i                                                                           O           eyt                         t o           vt al)l t

o r a s

                                                          't                                  vt al)                      at     f at rnf i               ea rn                              u e l

n A ii r e ii r o M us t e s t e a wh g m. t . tl t C E tl t ci s f i sm ns cis f i c sm nps e ot e ( F ebn c npsel o i ei e j aoh r ebn oi e i nl l j aohr b pmce murb v equme oaeas bpmce mur equf osno d b 3 Oaeas Dedoiain ( cd ee . Ded al ( cdee E m L B A . . . I T 6 7 8

  • s I

% ? j;? .

                       .? A]4 4/3 1       / $1413
                                         >:       (

1 jl. J l

                                                                ~
                                                                       ,..l       *
                                                                                          .11'
                                                                                                                         ],3j j}?, ;>.
                                                                                                                                                          . t.' I' 7? rjjj!" '        -       og :'v.

i.;ll yI - l..l

                ~
a. 9 1 4
                              ;c
                                                                                                 .' ' ,        ll',            /, ,        p'                   ,?,    .             r
a. I % ,?
          ,     t9  .,b l : b*.t'tl       !.l
                                                   !"[,

t!#

                                                                       ,t} .Y-
                                                                             }t           !.'               I     ljt {i L a.

iI

                                                                                                                                                  .?
                                                                                                                                                                .. . 7 f( t Ps             il' ' ;t!t  -

7-6 1 f l a c

                                                                                                                                                                                                                )  .

o e v o L l 4 i et t e g t ce aeM a Dj P b 6Sll O e 8N al

                                                                                                              / Cii
 '.                                                                          t a                               7Cd r t                                /         eD S                                8         m e

R

  ;.                                                              acy-
i. eeb rr()

Ar .

                                                                 / ono
  • yCoN c i ngt g encn ii Ai cr k ii ec f uva e qi r DetT R

T e f s oi c er t e L-- ax DE 7 - J l yl at a nic ol o iiL

   ~                                                                  tb ci i s d n
    -                                                                 soe ipt
  '.                                                                  rs a                                     X
  • uet
       .                                                             JRS

}'. lc e

 ^

v6 i8 t9

  • c1
 '.                                                                       e j ,
   -.                                                                    b5
        -                                                                o1 er se ib co rt ec sO E

4 5 e s 6 c 0 n )

                                                                           - e
 ?

Cr E e 8. &L Rf I S

 '                                                                        U e                                        (

NR

    ~

hegn e- ,f ,, h egn i cb no t enol w cb no i ii aco i o i ii h rt ioi on h rt I s w dd ua p rrt sss ppci w ua dd p e l i o es l i v u c r l y u c i ro i p ll . ro i t oh t pd oa k oh t c f s r ancnf l f s r e a a ao i a

                                                    )

d j b d p e e ,m d p e O eyt t r , nd eyt

                                                    't                                 vt al)                    at        o  t       on           vt al)                                                         s.

n A iirl e u rn f r ia ii rl e u o M tl t s t e ost tl t s C E cisf i s m pea , cis f i ( F eb n c nps sl t r eb n c j aoh r oienpee jaoh r b pmce mur amgt b pmce 3 Oaeax equraea Oaeax ( cd ee D edt svw ( cd ee E _ L . B T 8 9 6 llI1

                                                                                                                                                                        ,       s

r~ -', .

                                                             . -     ~.          -      -          ,,      -     -- .-        -
                                                                                                                                                                                            . . . ,        7._ ,,e
                                                                                                                                                                                                                  . . e-e.
 . .)                                                                                                                                                                                                                    '*
  .1
!:1 e
'. C
 . ?,
? .]
 *0
.?

r TABLE 3 (Cont'd) / f Page 5 of 16  ; i i

       +
   ^[                                                                                                                                                            Deficiency / Area                Date
                                                                                                                       . Jurisdictional                         Requiring Corree-            Objective NUREC-0654     Esercise objective               Responsibility          Date of          tive Action (by                    Met

-/ , FDtA Objectives Reference October 15, 1986 State Local Esercise Tracking No.) State Local

                                                                                                                                                                                                                                  ?

1

j 10. Demonstrate ability to 1.10, Demonstrate the ability to X X 9/18/85 9/18/85 (
      *,                                 project dosage to the             J.10    determine          appropriate                                10/15/86                            10/15/86           10/15/86 i                                   public via a, plume            (I.10-5)   protective measures based
  'l                                     exposure,       based plant and field data, on    (S&L)    on      PACr,        available sheltes, evacuation time                                                                                                                      ,
       ,                                 and to determine appro-protectiva estimates and all other appropriate factors.
                                                                                                                                                                                                                    $            ?

priate j measures based on FACs,

' available shelter,
   'j
    .                                    evacuation time esti-mates and all other                                                                                                                                                                .
   ')'                                   appropriate factors.

l

                                   .     (Objective for which capability should be demonstrated           during q                                      each full participation
  • a
   .                                     exercise)
 . . .?
11. Demonstrate ability to I.10, K 1 Not Not Tested Tested f ',

project dosage to the 1.11

  • public via ingestion J.ll
,.1                                      pathvey exposure, based            (S)

H on field detal and to

 $                                       determine        appropriate                                                                                                                                                          '

c protective measures Q based on FACs and other relevant factors.

  ]

.':i 5 v

)

g 1 i

                                                   ,N'-                                    .d
  • g. 4 g , + -

g , , , s , 1 e e

                    -                                                    ..                     _.s        ..   . _ . . . . . .        e ....._....-m..
                                                                                                                                                .                        ...,.,.....                   m.;_                            . . , . _ . , 3 .. ,. ,, . 3y ,            .

t;: PJ h C r; l  ; II.i p c:~. t- 3, c",4 TABLE 3 (Cont'd) Page 6 of 16 ,q I : g' . . Deficiency / Area Data Objective fj' l Jurisdictional Requiring Correc- , NUREC-0654 Esercise Objective Responsibility Date of tive Action (by Met FEMA objectives Reference . October 15, 1986 State Local Exercise Tracking No.) State 14 cal t .'

12. Demonstrate ability to J.9,J.11 Not Not .h implement protective (J.9-S&L) Tested Tested actions for ingestion (J.11-S) .

(.. s..i pathway hasards. g

c. .
13. Demonstrate ability to E.6, X X 9/18/85 9/18/85 9/18/85 .I.

App. 3 .j alert the public within the 10-mile EPX and (S&L) ,;g disseminate an initial instructional messa8e .

                                                                                                                                                                                                                                                                       .s., s within 15 minutes.

(Objective for which capability should be r demonstrated during each full participation >!. A exercise) p

t. . ?.c
14. Demonstrate ability to E.5 E.7 X X 9/18/85 2/8/84 2/8/84 l' (S&L) 9/18/85 9/18/85 formulate and distri-bute appropriate , ,

instructions to the public l'n a timely f. .[j fashion. }. ., b'g s s

                                                                                                                                                                                                                                                                    .??

it s l* v te

                                                                                                                                                                                                                                                                .            r
v. 3
                                                                                                                                                                                                                                                                    .a
                                                                                                                                                                                                                                                                    '1
                                                                                                                                                                    #',,.*%                        *'.4      ]                  l                  9    0=     s e       I
                                         ' ' ., *            .            g,                  ,                        %

F~ ,,

                                                                                                                                                                                       ,..'g w?

e *

                                                                                          **1         k, #             #
                                                                                                                                             ~*                     I.*. ; ri f                             .. j        (--5. $w *i
u. '3  ?
                                                                                                                                                                                                                                                                    '1 .h.

( . . .. L_d

  • t' - } * .. h
                                                                                                                                                                                                                                          +

s_ ,.

         ;                                 9
  • . 3
                                                                                                                                                                   -.,;.-   ,---,,           y-     g.        . , . - -    -
y. . g -.,,.. r& -
                                                                                                                                                                                                                                                                       .-    f.' 7
                                                                                                                                                                                                                                                                                      .t .-   y 4       .
                                                                                                                                                                                                                                                                                    ,       ,   g        ,
       .}

~. s e a \ 9 -p! . r> j; .j . 1i'b t.

 .5

[j TABLE 3 (Cont 'd )

 $4                                                                                                                                                                                                                                                                  Page 7 of 16                        I:
.4 I-Deficiency / Area Date Jurisdictional Requiring Correc- Objective
          $                                                                                                                           NUREC-0654             Exercise Objective             Responsibility            Date of         tive Action (by                  Met
  • N FEMA Objectives Reference October 15, 1986 State Local Esercise Tracking No.) State local Yi
     -3                                                                               15. Demonstrate           organisa-                J.9,                                                  I           I                                                 2/8/84          2/8/84                       .

tional ability and J.10.a.g g

   .-      l                                                                                resources necessary to                      (S&L) m
 .. !                                                                                       manage        an         orderly
    .4                                                                                      evacuation of all or                                                                                                                                                                                        f-
   .4                                                                                       part of the plume EPZ.                                                                                                                                                                          $                 :
       .,                                                                                    (Object ive for which                                                                                                                                                                                  .l.       .

1 capability should be demonstrated during each full participation exercise) i

16. Demonstrate organi- J.10.k I I 2/8/84 2/8/84
         ?

antional ability and (561.) resources necessary to l

           !                                                                                 deal with impediments                                                                                                                                                                                    ,

i to evacuation, as

   .?                                                                                        inclement weather or                                                                                                                                                                                 .

l traffic obstructions. e

       .?

eN e

       *,                                                                                                                                                                                                                                                                                            i 4
       }
      *D                                                                                                                                                                                                                                                                                            (

I e i 9

    ,- .s. . ' . '                                                                  ,
                                                                                                    '.,    'f_'
                                                                                                                * ;1 ::'.   '
g. **

m.. 4

f, I,.. [

                                                                                                                                                                          . b b a. . . .
               .                               ...,!           .      c .o "  . . O b 212. . _, ,
                                                                               .                  "; _, ,   , . P              . : e } r .. . -- . ,
                                                                                                                                                                                                 ; e ..   . . :

_ . s. k 4[ f'

                                                                                                                                                                                                                            . pL ..
                                                                                                                                                                                                                               ;..f.
                                                                                                                                                                                                                            .p
                                                                                                                                                                                                                            ..s.

(~ ; 3 :.:  : t& iO y.

                                                                                                                                                                                                                                  . t;
                                                                                                                                                                                                                                }V

(", TABLE 3 (Cont'd) kY-Page 8 of 16 i,

                                                                                                                                                                                                                            'Eh f*.

Deficiency / Area Date .. Jurisdictional Requiring Correc- Objective {Y FEMA objectives. NUREG-0654 Re ference Esercise objective October 15, 1986 Responsibility State Local Date of Esercise tive Action (by Tracking No.) State Met local

                                                                                                                                                                                                                                     /j
                                                                                                                                                                                                                ?

x

17. Demonstrate organisa- J.10.] I I 2/4/84 2/8/04 tional ability and (S&L) y' 3 ,

resources neces sary to control access ra en

                                                                                                                                                                                                                                   ..]
                                                                                                                                                                                                                                   'A evacuated area.                                                                                                                                                                                                              ',

y fs O

18. Demonstrate organisa- J.10.d X 2/8/84 tid tional ability and (S&L) 6t resources necessary to j ,

effect an orderly 3' evacuation of mobility- $$ impaired individuals , (4

within the plume EPZ. . {. .,

,- l

19. Demonstrate organisa- J.9, X 2/8/84 1 1 tional ability and J.10 3 6..,

resources neces sary to (S&L)  ; effect an orderly y evacuation of schools h,; - within the plume EPZ. \';

                                                                                                                                                                                                                         . N.       .

4 SJ g. I m

                                                                                                                                                                                                                                    -fh
                                                                                                                                                                                                                                    +
                                                                                                                                                                                                                                      .c i                                      k                            ,.e.."y           ~g                      #   6 *J                          , *,,                 e  9 p', g 4
  • 8 - ,. g,.. g.,
l. * - '4 g'*(,i .y i..
                           -            .                           i       <     a' t  ,_.

s 3  ; .j .. (g gg, y,

ji ,i . y,I f ra.  ; ;I , , l + .I ~!I '  :! li! * ,. s - , t 1 etn T% m, 6 1 l 4 n15 8hh8 ss

                                                                                                        .h d

p f o e v L a c o /

                                                                                     /os/ai 8Ji8hr 2 . a/

r1Ca t e ot Ns e 9 i tP9 .P T et t S t e t ce S r, g aeM a Dj P b 4 4 d

     -                                                           O           t e     /

8

                                                                                                                              /

8 t e ot a 8 8 Ns t / / e S 2 2 T' y acy eeb rr()

    ,a                                                     - A r
                                                            / ono yC o N c i
    -.                                                        ngt g encn                   1 n
                                                                                       - o          .

iiAi 6 s f cr k 8 rhf 7 ii ec f uva ese . AfiJp eqir Cf r s

                                                           - DetT                    R ea .o r:.                                                          R                   AJPWN
i. ,

e 5

        ;.2                                                            f  s          8 r,-                                                                  oi          /

c 8 er / 1 1 t e 9 as q, DE f- l yl at a nic I I z ol o - iiL f tb ci ( 1 i s d n soe i pt rsa I I p uet y JRS - g i8 e v6

  • t9 c1 e

j ,

    ~                                                                  b5
    ~                                                                  o1 er se ib co rt
   -                                                                    ec sO E

p; e. . 4 i

   -                                                                   5 e 6 c
        ;                                                              0n               .      )

7-

                                                                        - e Cr             a.       L                                f.

0 )L & 0e. )L y E e Rf 3. b (& S 1. S 1 &S U e K J( J( NR -, _. ~~  ; p ory hegn o ,doye t net ch orn t eo . f t oc cb no t n i ii on nt ti o - _ .i e h rt ii e sss , yng w ua ysm g yii , . s t or dd p ti rrr . t nco . y e i me l i i ceee n ii ed v l m.e u c l eth mro l md o - i i e ro i ib d et eoi /t id b a t t b oh t d e c a r f s r a eh d a a e . -

                                          )                                j e             yl s u                    a                  rwonl                         h e d p                      p        t au p      edn      td tel       o o                                ee d                                b                                     e                                                          a
                                          '                                 O             s rp             eyt                   th                       o     t           m t                                          aut x ro n e iivtra l)                            at n          ,I        p     a     a ecn n                                                                            u e                                    r l          r A                                                              oak o                               M        t u o                tl t         f i s     t           i         sl       t s yoe ne C                                E         sn c r               cis                    s            r       ra
              .                           (                                 F         ni           e       eb n            c      n        d eeer               nl op b

ot k j aoh r eeet uk e mnd r b pmce mk si s r n mp ,s . 3 eono Oaeas eaarsoe euI a - - ' Dcaw ( cd ee Dmb ciwg DsKh - ~ E L - B . . .

  '                                        A                                         0                                           1                             2 T                                        2                                            2                             2

- [.

                                     "    l}
                   ;-I
                        . a ?,3&i'..                                                $. j4I!i ,!ldl'                                            :I4 f         !
                                                                                                                                                                                 ;: )!   9 .   '

{ ,. . s}

                                                         .r 4a f'          C
                                                                                  . L .                    -
                                                                                                                                                                                           . : [
                     .                ,                                                   r :.~ .                  .,-          .        - ; --         ? :.. _    ,-,c                 ' ,- .              . : ..& W
  .. y .                2         . . . ;; A '    ~.T  \ 4 '.     .      " : .L .l. * * : .:s u . : g . a=
                                                                                      .                    .n   i, . C 12 . . ;-; '     .:. '

s o .u. . ' ;u. : ;. .. ;;;; : . : ., ~ .:: ; . h . s. 35

                                                                                                                                                                                                                   }}   .

v)  ? 4 j

                                                                                                                                                                                                                       -.i li I. :

su I.f. TABLE 3 (Cont'd)

  • Page 10 of 16 I.

p f.1 Deficiency / Area Date l_ Jurisdictional Requiring Correc- Objective ..; IRIBEC-0654 Esercise objective Responsibility Date of tive Action (by Met L' FDIA Objectives Reference October 15, 1986 State Local Esercise Tracking No.) State local , t >

23. Demonstrate ability to J.2, I 9/18/85 9/18/85 '
                                                                                                                                                                                                                    , -l effact      an        orderly       (S&L)                                                                                                                                                                     t4
                                                                                                                                                                                                                    *f' evacuation of on-site                                                                                                                                                                                         ,

personnel.

24. Demonstrate ability to C.3.a. Demonstrate ability to I I 9/18/85 9/18/85 2/8/84 m p..  :

brief the media in a C.4.a brief the media in a St. Chas. 10/15/86 10/15/86 st. Jobe r; clear, accurate and (S&L) clear, accurate and timely Parish , Parish, 'n timely manner. manner. 10/15/86 , St. Chas. A,; Parish j}

25. Demonstrate ability to C.4.b Demonstrate ability to I I 9/18/85 Partial- 2/8/84  ;.f.7 i provide advance coordi- (S&L) provide advance coordina- St. Chas. 10/15/86 ly Met 10/15/86 ,.

4 nation of information tion of information Parish 9/18/85 St. Chas. P released. released. 10/15/86 Parish D h: b.

26. Demonstrate ' ability to C.4.c I I 2/8/84 2/8/84 h establish and operate (S&L) rumor control in a 1 coordinated fashion.

i4 ah N

  • L. *
                                                                                                                                                                                                                   .VC W   .j
                                                                                                                                                                                                                   .k D
                                                                                                                                                                                                                 . b k
                                                                                                                                    .          . .,              .      ,  .     . .         ..   . .       ,    , f.?   s L-         __

d; [_ - a ,.

  • I ' Y'
  • g it \ '. j $ [ I< 6 .

Ig

                  "    ~~~

V  ; Ws ,X. r...o..

                                                                                                                                                                                 .y -                                            w,        t
v ,
                                                                                                                                                                                                                                                 .em 1:  w.a l'                                    .c

[-

                                                                                                                                                                       .Jy g,s.                             g   1. .,   ,9  ., x'-         . ,       e            u.: -           .        .s_,

t.,y - u < -

                                                                                                                                                           ..y       -

7 .. ,,;a .;.,

                                                                                                                                                                                                          .4            3              4 =

t,. ..2 . - i. . . ,. : o 4; -

 ~

f

u *
 .1 9
).; .,.
 .]                                                                                                                                                                                                                                                        .

i 4 i 4 . TABLE 3 (Cont'd) '

                                                                                                                  .                                                                                                  Page 11 of 16 o

4

      ?

1 Deficiency / Area Date ~. ! Jurisdictional Requiring Correc- Objective

      ,                                                             NUREC-0654              Esercise objective                    Responsibility               Date of            tive Action (by                        Met FDIA Objectives                  Reference                 October 15, 1986                    State        Local           Esercise           Tracking No.)                 State          '14 cal
  • C v
.j
27. Demonstrate adequacy of J.12 x 1/16/65

.3 procedures for regie- (S&L) River C8 tration and radio- Bend ,3 logical monitoring of Esercise evacuees. . y I.

  . _!                       (Objective for which                                                                                                                                                                                               w
  • j capability should be demonstrated during each full participation esercise)
-i  .                                                                                                                                                                                                                                                        !

( a

    '.               . 28. Demonstrate adequacy of                  J.10.h                                                                      I                                                                              2/8/84 feellities        for          mass      (S&L)                                                                  .

Avondale care of evacuees. Recepc. Center .[ f 4

i 6
t
    *t 4
         ' ~ ' *
                                    . v, . 3 . .[ _ t : v          _.<;    .

1

                                                                                    .. _f:~~      .,      -,
                                                                                                                    ,    ~;m; r . ~ . . . , ~ -    +;        -             -         -             -    .      ,
                                                                                                                                                                                                                  , ,.     *             ;v.

_~. + . -s ' , , _ * -

                                    ~-        .

m..-

                                                                                                           ' . - ,:o n         ,              , ,,                   e-                         ,ar.      #   -
                                                                                                                                                                                                                              ,;g
                                                                               . ' . -* <. .                                                                                                                 . . - r . .,-(
                     .      .~.=                        .. .           - - ,                   '.5   ~.     -
                                                                                                                            ..--u        ; ~. .- - c          ...%,,   ; . w. i, . . . . . . . .
  • t;
                                                                                                                                                                                                                          . f. !
~i
                                                                                                                                                                                                                            .!z
                                                   .                                                                                                                                                                          J' e

, j$ W { ;, f i TABLE 3 (Cont'd) . Par,e 12 of 16  :.j m Deficiency / Area Date

  • Jurisdictional Requiring Correc- Objective NUSEC-0654 Esercise Objective Responsibility Date of tive Action (by Met ,

PEMA Objectives Reference October 15, 1996 State Local Esercise Tracking No.) State Local s t Q 1;1

29. Demonstrate adequate K.S.a. Demonstrate adequate I I 9/18/85 2/8/84 9/18/85 'f equipment and proce- b equipment and procedures Jefferson 10/15/86 10/15/86 Met by y' dures for decontaal- (S&L) for decontamination of Parish St. Chas. i nation of emergency emergency workers, equip- 10/15/86 [

workers, equipment and ment and vehicles. Avondale [- vehicles. P.D. & *- ': - West # -i (Objective for which Jefferson . - capability should be during Hospital h h. . demonstrated each full participation . exercise) 3 ..'

30. Demonstrate adequacy of L.4 Demonstrate the ability of I 9/18/85 9/18/85 P EMS transportation, (S&L) EMS transportation, Jefferson 10/15/86 St. Ches.

personnel and proce- personnek, facilities and Parish ENSI E dures for handling procedures for handling St. Chas. 10/15/86 contaminated indivi- contaminated individuals. Parish Jefferson  % duals including proper Parish i* decontaminstion of C-vehicle and equipment. fl' s i, (objective for 'which d capability should be {f j demonstrated during llf"7

)

each full participation esercise)  !{ 9 w. 1 s -h , IE i.- n

                                                                                                                                                                                                                                   .n
                                                                                                                                                                                                                                 ?

i

        .n.

in, e , L__ e Lu r.+ i

                                                                                          ; ..;       a
                                                                                                   . .n L. y       g' , , -
                                                                                                                                                       ,1    <j gi. g
                                                                                                                                                                       ,,r q pg g,

g  ; ]. 3

                                                                                                                                                                                                                    .; e e.;

'4 , m -

                                                                              , - -            - y. ,         ;,..        e.-"       r-~'-  .-                  . :r ?     -m          ~0       'O'           L i        !.                            L, , ?               - *    ,    ,     .

1 ", '3 t ., -g

                                                                                                                                         '}     ,      . y,         :.1
                                                                                                                                                                            ' '         '"-   *
  • 10 ' '

o . 4 N 1 fj  : h { 51 . i i I 1 .i TABLE 3 (Cont'd) ,

    .                                                                                                                                                                        Page 13 of 16                    I I

Defielency/ Area Date Jurisdictional Requiring Correc- Objective

  *-                                                  WUREC-0654      Esercise ob}ective             Responsibility            Date of         tive Action (by                   Met FEMA Objectives          Reference        October 15, 1986              state          Local      Esercise        Tracking No.)            state         local                   h r

1 31. Demonstrate adequacy of L.1 Demonstrate the adequacy I 9/18/85 9/18/85

.j                     hospital f acilities and         (S&L)     of hospital f acilities and                   Jefferson      10/15/86                                              ochener
 ,i                    procedures for handling                    procedures for handling a                        Parish                                                          Hospital d                       contaminated         indivi-               contaminated individual.                                                                                         10/15/86

'J d ual s . W. Jeff. .

]                                                                                                                                                                                  Hospital       e           I. -

(Objective for which $o 1 c capability should be demonstrated during

 <                     each full participation                                                                                                                                                                1,

,] esercise) j 9 s

            . 32. Demonstrate ability to           C.I.a,     Demonstrate the ability to             I                     10/15/86                               10/15/86 3                     identify     need         for,     b       identify need for, request request,     and      obtain      (S)      and obtain Federal assist-       .

Federal assistance. ance. t

 -t
33. Demonstrate ability to M.4 I 2/8/84
    .                  estimate total         popu-      (S) lation esposure.

I 9/18/85 fil, 2/8/84 Not partial-

     ,            34. Demonstrate ability to             M.1                    -          -              I determine and implement          (S&L)                                                      St. John                   (St. John parish)         Tested        ly Met appropriate         measures Parish                                                           2/8/84                 i for controlled recovery                                                                                                                                    St. Chas.

and reentry. 9/18/85 St. John b 9 0 y D,%+a-+f{ *- g == . ,- . ., , .

     *--
  • O * . A__.t
                                                                                                                                            ,    .                   ;          e - , --g
                                     ,   _.2._- . ,              2'..         -
                                                                                            , _ _ . . .           .,      .4, . 3 . _ _ _ __ ;.   ,2.'  u _ ._ -

_ .ar , ' f

                                                                                                -                                                                                                 a
                                                                                                                                                                                                .s
       ,                                                                                                                                                                                  i'
                                                                                                                                                                                          ;g p-TS
                                                                                                                                                                                          'n b.'

l b:

                                                                                                                                                                                        .W.

4

                                                                                                                                                                                                *)

TABLE 3 (Cont'd) -

                           .                                                                                                                                page 14 of 16 Deficiency / Area                 Data                           tb.

JuriedIctional Requirina correc- Objective p IEEEEC-0654 Esercise Objective Responsibility Date of tive Action (by Met ib FDIA Objectives Reference October 15, 1986 State Local Esercise Tracking No.) state local t-7

   . 35. Demonstrate the ability            C.4                                                 I        I                                       2/8/84        2/8/84'                'i W

(S&L) to effectively call  ; upon and utilise out- .' side support agencies when local capabilities {j, p are exceeded. u O )] p r.

36. Demonstrate the ade- F.1 Demonstrate the adequacy.
  • I I 9/18/85 9/18/85 2/8/84 ,

. quacy, operability and (s&L) operability and effective 10/15/86 10/15/86 9/18/05 [L . effective use of emer- use of emergency communi- 10/15/86 k.3 gency commanication cations equipment and the b; equipment and the adequacy of communications I t.' adequacy of communi- procedures and methods. h cations procedures and  %' methods. c'- (Objective for which I capability should be < demonstrated during '

                                                                                                                                                                                             ';q each full participation                                                                                                                                                      f e-exercise)                                                                                                                                                                         ,;

ih $ e .f

                                                                                                                                                                                             ' .}

e p,. b m si

                                                                                                                                                                                           .s    '
                                                                                                                                                                                                 +

E__ u__ l . ._I i ; .

                                                                                  '                 '   I,,            i_           U,.j      I'- 5      LW i u        ia

[:' i. ' .ll * [i] L

?;5 e, s--- - - -

                                                                                                                   -g-..     ,--
                                                                                                                             ~,
                                                                                                                                        ,3
                                                                                                                                                                                                    , . p. .No; , 3 .=

1; . t *

   ,o                                                                                                                                                                                                                 .

(i . A

;+                                                                                                                                                                                                                                -
    '1                                                                                                                                                                                                                       '
1
1, t.

i I~ 4 . .i TAtt.E 3 (Cont'd) Page 15 of 16

      ;                                                                                                                                                                                                                     t.
        !                                                                                                                                                   Deficiency / Area                 Date

-i Jurisdictional Requiring Correc- Objective ", NUREC-8654 Esercise objective Responsibility Dste of tive Action (by Met FEMA Objectives Reference October 15. 1986 State Local Esercise Tracking No.) State Local l , r

.1 l
37. Demonstrate ability, to D.4 Demonstrate ability to X X 9/18/85 2/8/04 2/8/84 >

monitor Emergency (S&L) monitor Emergency 10/15/86 9/18/85 9/18/85

  ,3                        Classification        levels                       classification            levels                                                                    10/15/86      10/15/86 iT                            continuously             and                      continuously and implement l                     implement procedures in                           procedures in a timely                                                                                                                       .
                                                                                                                                                                                                                            't
  .I a timely meaner.                                  manner                                                                                                                             g I                                                                                                                                                                                                                  t-*       i
      ~.                     (Objectives for which                                                                                                                                                                          ';
      ~..                    capability should be
    <             -          demonstrated         during                                                                                                                                                                '

j each full participation J, esercise) a , b.

38. Demonstrate capability E x 9/18/85 2/8/04 2/8/84

.? to etfectively process (S&L) 9/10/85 i 'i " all incoming messages in a timely menner. , . I t 9 1 a n 1

               #           *                  ,**[*   "
                                                        ,, y         *4     *e            1 9        *     + * *
  • r 6 * =r ,
                         #                                     .(
                        ~.

4m 4 .; . .s. ._. .c_ .- .i,.,...%,. v~ a, ,

                                                                                                                        .               , ,      23 <sj,         3 ., . 2 ,     s   ,
                                                                                                                                                                                           , .c                ;

E:

                                                                                                                                                                                                      *.j
                                                                                                                                                                                                      ;3
                                                                                                                                                                                                      /->

N 7 l7, i u' F4

                                                                                           .                                                                                                          *.4 1l s

'! t,' 4 TABLE 3 (Cont'd) L, Page 16 et 16

                                                                                                                                                                                                      *.i.
                                   -                                                                                             Deficiency / Area                   Dete Jurisdictional                     Requiring Correc-                 Objective                           is '

1RfREC-0654 Esercise objective Responelbitity Date of tive Action (by Met 2 FDIA Objectives Reference October 15, 1986 state Local Esercise Tracking No.) State Local h.,

39. Demonstrate that A.2.a. I I 2/8/84 2/8/84 7

authority esiste in A.3 , East  ;; i activating a reception (S&L) Daten -d center (as necessary) Rouge  ; R in a timely meaner. Pariskt .{- Jefferson u {. -

   .         (Objective for which                                                                                                                                           Parish       w i^

capability should be demonstrated during l? (' 4 ;, each fu11 participation f[ exercise) 4 kd v.* s.* , f'. 4 1 e

                                .                                                                                                                                                                     (

g.1 LI

. w
                                                                                                                                                                                                      ?!?

b: em I *Js f:h b

                                                                                                                                                                                                  . ..13:

t..

                                                                                                                                                       .2
                                                                                                                                                                                  ~f.
                                                                                                                                                                                       ,    , , , . I .k        -

t li _s 6 2 L t  ;- LJ  ?. _;

  • 4 "3 *  ; C'  ? ~ -i e ' d. e! h
                                                                                                                                                                                                     .r.}}