Corrected Page 14 to SALP Board Repts 50-266/86-01 & 50-301/86-01,changing Fire Protection Area Rating to Category 2
ML20206R392
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/30/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20206R385 List:
References
50-266-86-01, 50-266-86-1, 50-301-86-01, 50-301-86-1, NUDOCS 8607070131
Download: ML20206R392 (1)


See also: IR 05000266/1986001

Text

. _ _ _ __

,

.*

E. Fire Protection and Housekeeping

1. Analysis

Evaluation of this functional area is based on routine assessments

by the. resident inspectors which include observations of: the

control of combustible materials, control of fire barriers,

implementation of ignition control permits, Appendix R modifica-

tions, and housekeeping requirements. No violations were

identified in this area.

The licensee continues to show improvement in this area. The

absence of violations during this SALP period is indicative of

a more aggressive management attitude toward fire protection

and housekeeping. During the SALP period the plant manager

eliminated all smoking in the auxiliary building due to abuses

of the previously designated smoking areas. The fire

protection engineer works closely with contractor personnel to

ensure that they are aware of applicable procedures related

to transient combustibles, fire permits, and storage of

combustibles. During the Unit 2 outage in 1985, major modifica-

tions to the secondary plant involved a significant amount of

cutting, grinding and welding. All of this work was accomplished

without incident.

Appendix R modifications continued throughout the SALP period

with added emphasis the last few months in order to meet an

April 3,1986 completion comitment. It appears that not all

items were completed in accordance with this schedule. This

issue was referred to headquarters for resolution. The

licensee could have prevented exceeding the commitment date by

either doing a better job of establishing realistic comitment

dates or by closer tracking of the job progress such that a

schedular exemption could be requested in a timely manner. The

subject items were completed by May 19, 1986.

Housekeeping remains above average despite major work activities

during the period. Again, close management oversight in this

area is evident.

2. Conclusion

The licensee is rated Category 2 in this area.

3. Board Recommendations

None.

8607070131 e60530

PDR 3

G ADOCK 05000266 d

PDR 9

14